Sökresultat:
3139 Uppsatser om Energy efficiency improvement - Sida 22 av 210
Kartläggning av Kassationerpå Bubs Godis
The waste of material is a big expense for manufacture companies caused by lack of quality. The cost by lack of quality often totaled to a big percentage share of the turnover when all cost related to lack of quality is included. New manufacturing systems like Lean production or Just In Time demands better internal quality for the manufacturer. To make those manufacturing system with small and none buffer stock successful the quality improvement continuously have to be developed.Measuring of waste of material in Bubs Candy?s factory where not simple due to the products does not have a permanent weight during the manufacturing process.
Energieffektivisering och solenergi i en universitetsbyggnad : Undervisningshuset och Biblioteket i Uppsala
Akademiska hus is a real estate company that specializes in providing Swedish universities with housing facilities for educational and research purposes. The company strives to reduce its use of energy by 40% between the years 2000 and 2025. The aim of this thesis is to determine which measures can be taken to reduce the need of purchased energy in a building that is used by theSwedishUniversityof Agricultural Sciences inUppsala.In order to determine the results of various changes to the building envelope and ventilation system, the building was modelled in the computer simulation program VIP-Energy. Other proposed changes to make the use of energy more efficient concerned water use and lighting. The need of purchased energy can also be reduced by producing electricity or heat on site, using solar energy.Results show that economically viable measures include upgrading windows and faucets, adjusting control systems for ventilation and lighting, and installing roof mounted solar panels for power production.
Removal efficiency of perfluoroalkyl substances (PFASs) in drinking water : evaluation of granular activated carbon (GAC) and anion exchange (AE) using column tests, and the effect of dissolved organic carbon
Poly- and perfluoroalkyl substances (PFASs) are a group of environmental contaminants that have gained increasing attention due to their potential to bioaccumulate, environmental persistence and potential toxicity. PFASs have been found in surface water, sediment, air, soil, sludge and ice caps globally, as well as in wildlife and humans. Furthermore, PFASs have also been detected in drinking water, leading to raised concerns for human health, since drinking water is one of the most significant sources of PFASs for the general population. Conventional water treatment techniques have shown to be ineffective removing PFASs, highlighting the importance for further research to develop efficient removal techniques.
The aim of this study was to investigate the removal efficiency of PFASs in water using two treatment techniques; granular activated carbon (GAC), type Filtrasorb 400®, and anion exchange (AE), type Purolite A-600. Additionally, the effect of dissolved organic carbon (DOC) on removal efficiency was studied.
Finansiärer ur ett hållbarhetsperspektiv : En aktörsstudie av Europeiska Investeringsbanken, Nordiska Investeringsbanken och Svensk Exportkredit
Today a major part of the energy produced steams from fossil fuels, finite resources, and a change towards an energy sector based on renewable energy is necessary. Sweden is one of the leading countries with regards to investments in renewable energy but most other countries have a long way to go. This makes it interesting in developing renewable energy projects in new markets in countries like Poland where still a lot of fossil fuel is used. Large infrastructure development projects are very costly and therefore external investors needs to be involved. The investors play an important role in changing the usage of fossil fuels towards renewable energy sources.
Solel till Akademiska sjukhuset : möjlig genererad effekt och solcellers estetiska konsekvenser
Today many buildings and it´s nearby surroundings are designed to achieve some kind of environmental goal.The issue concerning energy consumption is currently at focus and it is relevant that we start increase the share of renewable energy. Solar energy is an infinite resource and should therefore be considered when selecting an energy supplier. Uppsala University hospital is facing major restructuring when parts of the existing buildings will be refurbished and a large new building will be constructed. White Architects have developed a study concerning the new building and for some of the existing buildings on the hospital campus. Uppsala County requires tough energy measures and wants the new building to be classified as an eco-building in Whites following work. The classifications will involve high energy source requirements. This work has been conducted to see if solar power can be envisaged as a supplementary energy source for the University hospital and also to investigate the aesthetic impact of solar cells on the new building.
Träbroar för järnvägstrafik
This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.
Engergieffektivt Bostadsområde : Förstudie Till Aktivhusområde i Halmstad
In the thesis we have shown that it is possible with current technology, to buildneighborhoods that are largely self-sufficient. We have obtained some information aboutongoing work in the field of energy efficient buildings and active house which we have usedto develop a model. The feasibility study for Ranagård we have e.g been forced tofollow laws on groundwater covered, resulting in the construction of basements for singlefamilyhome is not possible. The model that we have built up overtime has been the central part of the work. The model illustrates very well what an activehouse neighborhood means and potential of such an area.
AUTOMATISERING AV PAKETERINGSPROCESS
The aim of this thesis is to investigate if an automation of the manual packaging process at Legosan AB is profitable. Legosan AB, located in Kumla, performs subcontract work of dietary supplements and medical products to companies within Europe. The chapterportal robot is used in the other. As there are several options in the choice of packaging robot the suggestions of improvement are divided into two different designs. Other machines and equipment necessary for the different suggestions of improvement are showed and their measurements are presented.
Prefabricerade ramper i stålfiberbetong
This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.
En modell för att kostnadseffektivt öka produktionen inom aluminium-bearbetning
The purpose of this study is from a case study develop a model that aims to cost effectively improve productivity in a manufacturing production process. The study highlights the importance of having knowledge about customer needs and using a holistic process perspective when improving productivity to identify the relations between the process stations and by this find problems that cause waste and losses in productivity. Tools and methods used to make production more efficient such as single minute exchange of die, spaghetti diagram, 5s and master production schedule is presented an applied in the model to see how these effect costs, productivity etc.Maintenance effects on quality and productivity in a manufacturing company will as well be covered in this thesis. The results and conclusions finally reveals how the process improvement tools, maintenance and production planning for example effects each other and why it is important to establish an attitude in the company where continuous process improvement should be emphasized..
Termisk hantering av litium-jon- batterier i elektriska drivsystem
The automotive market is currently undergoing a historical change where stricter emission legislations and ever increasing fuel costs have intensified the search for effective alternatives to the conventional internal combustion engine, which has resulted in a substantial trend towards electrification of powertrains. Storage of electrical energy is the fundamental component in this technology where the lithium-ion batteries are currently considered as the most appropriate solution. Lithium-ion batteries, however, as other types of batteries, can only be used efficiently and durably within a specific temperature range.This Master thesis has been carried out in collaboration with Electroengine in Sweden AB, situated in Uppsala, which has an ongoing project regarding development of a modular battery system for electric powertrains. The project is at a stage where an initial prototype has been developed which provides the foundation for this thesis. The study has addressed the battery system performance from a thermal perspective, in order to validate the ability of the system to create a thermally serviceable environment for the lithium-ion battery cells.
Stålfiberarmerad betong - En ekonomisk jämförelse
This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.
Framtidens byggarbetsplats. Organisation och Kompetens
This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.
Utveckling av en metod för avvikelsehantering i byggföretag
This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.
Nya inslag i bostadspolitiken konsekvenser för Helsingborg
This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.