Sökresultat:
2920 Uppsatser om Energy efficent building - Sida 41 av 195
Riksintresse; Bevarande eller nyttjande : Vindkraftsutbyggnad inom Natura 2000- områden
Natura 2000 is part of the European Union: s framework to protect and preserve biological diversity. Natura 2000- areas are by the goverment appointed to areas of national interest for preserving nature. Also wind power stations are appointed as of national interest and the reason for this is the goverments goal to get energy from reneweble energysources. This essay describes when both these intrests conflict eachother when it comes to building wind power stations within Natura 2000- areas. The main focus of this essay is a casestudy of two cases from two different counties, Dalarna- and Norrbotten county, where applications have been made to build wind power stations within existing Natura 2000- ares, both cases have reached the court dealing with enviromental issues.
En studie av Uppsala stads värmeö
The urban heat island is an area restricted to a city center where the temperatureis higher than its surrounding environment. The greatest temperature difference isfound at night when the weather is calm and the sky is clear of clouds. There are twomajor causes behind this phenomena and the first one is the use of energy forheating of houses. The heat leaks through the walls of the buildings and warms upthe surrounding mass of air. The second one is the use of building material whichstore the suns radiation on daytime and releases the heat during night.
LCC-kalkyler i byggbranschen : förutsättningar och tolkning av resultat
Background:Life-cycle costing (LCC) is an investment calculation that takes intoaccount operating costs throughout the investee lifecycle. LCC calculations are mainly usedto evaluate investments that have no revenue side. Attempts to apply the LCC calculations forbuilding-related investments have occurred since the 1980s. Despite the advantages ofusing LCC calculations, use has not passed through in full. The main obstacles have beenidentified as a lack of relevant input data, and insufficient experience of workingwith LCC calculations.
Dimensionering och konstruktion av Villa X
AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.
A-måttet - En slitageanalys på spårvägsrälsen i Göteborg
AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.
Lägenhetsskiljande massivträbjälklag Projektering av bjälklag med förbättrade ljudisolerande egenskaper
AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.
En jämförelse av RDF och avfall som förbränningsbränsle
In the EU the amount of waste increased by 14 percent during the years 2000 to 2010. EU?s target to reduce waste generation runs parallel with the aim of increasing the efficiency and profitability aligned with energy recovery. In Sweden the energy recovery through incineration is increasing steadily, and 46 percent of the municipal solid waste (MSW) is treated by combustion. This report aims to examine the profitability of processing MSW into Refuse Derived Fuel (RDF) from an economic-, energy- and environmental perspective.
Vägförvaltningssystem. Sammanställning i databas av system från Vägverket och kommunerna i Sverige
AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.
Bostadsförnyelse - för vem? : En fallstudie av bostadsförnyelsen i två bostadsområden i Uppsala
Background:Life-cycle costing (LCC) is an investment calculation that takes intoaccount operating costs throughout the investee lifecycle. LCC calculations are mainly usedto evaluate investments that have no revenue side. Attempts to apply the LCC calculations forbuilding-related investments have occurred since the 1980s. Despite the advantages ofusing LCC calculations, use has not passed through in full. The main obstacles have beenidentified as a lack of relevant input data, and insufficient experience of workingwith LCC calculations.
Lönsamheten vid nystart av slaktsvinsproduktion : en fallstudie
I have done a case-study about building a new stable for slaughter pigs at a farm close to Kalmar. The farm is able to supply the breeding with cereals and it has enough area to
spread the manure on. The most important factors to gain profit, is the cost for building
the stable, the price of the feeding-stuff and the growth of the pigs. The discount from
the slaughter-house was less important than I thought from the beginning, and it?s a
factor that is hard to influence.
With the new production of slaughter-pig and cattle that already exist on the farm, the
farm will get a well-functioned rotation of crops with lye and autumn rape as
interruption-crop.
Kvarteret Flaggskepparen, Industriellt byggande för offentligt ägda bostäder -En fallstudie i samarbete med NCC Komponent och MKB
The primary focus of this Master thesis is to study how industrial house building can be implemented during production of rental flats under the terms of public procurement. In order to determine a suitable working process as well as presenting a possible architectonic result of the process, a case study is carried through.A housing projekt is designed on a site i Malmö, where the commisioner is MKB Fastighets AB and the contractor is NCC Komponent with the industrial building system NCC Komplett. The focus of the design is to accomplish high quality apartments to a resonable price, as well as solving the overall scheme for the site.The housing projekt, Kv. Flaggskepparen, built on the consept of a single house model, used to handle the entire site, shows that the building system is well suited to accomodate the commisioners demands.In order to reach the best possible architectonic result with the building system, cooperation initiatded in an early stage of the process is neccesary.A model is proposed to handle the situation under the terms of public procurement. The model suggest that the geometrical design is mainly carried out after inquiry and that architectonic qualities should mainly be defined in a non geometrial way for inquiry..
Urban Building i kvarteret Domherren
Bachelorprojektet behandlar arkitekturskolans lokal pa? O?stermalmsgatan 26, Stockholm. Skolverksamheten flyttar snart upp pa? Campus och skolan kommer att fa? en ny funktion. Projektet kopplar samman till en uppsats skriven om Daniel Libeskinds process, metod och symbolism och kopplar till skolans kvalite?er sa? som fo?rma?ga att provocera, fo?rha?llande till platsen, funktion och fo?rha?llande till staden.Utifra?n na?mnda aspekter konstrueras tva? delmoment som sedan ha?rleder formgivningen och den vidare omprogrammeringen av skolan till kontor, offentlig verksamhet och bosta?der..
Jämförelse mellan olika försöksmetoder för bestämning av västsvenska lerors skjuvhållfasthet
AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.
Förekomst av koppar i dricksvatten. En studie av bostadsbestånd uppförda under 1940-2000
AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.
Uppföljning av bärighet och deformationsutveckling av terminalytor vid inventering och nybyggnad i Göteborgs Hamn
AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.