Sök:

Sökresultat:

2920 Uppsatser om Energy efficent building - Sida 11 av 195

Utveckling av försäljnings- och leveransmodell

The objective of this work was to evaluate and implement a number of energy saving functions for a specific embedded system. The functions were then grouped into a number of energy levels with known properties in terms of functionality, energy consumption, and transition time between the levels.The embedded system consisted of an AT91 ARM9 processor, GSM/GPRS modem, display, Ethernet and other peripheral units. Some energy saving methods that were considered were suspend to RAM, suspend to disk, frequency scaling, and methods for saving energy in the modem, Ethernet, USB and display backlight. The functions were grouped into levels and an interface was specified for controlling the energy level.It proved possible to get known properties within the defined energy levels, even though the paritioning of functions into these levels proved to be sub-optimal in a typical application usage scenario because it was designed for mainly energy consumption, not usage.The final result is a number of energy saving functions grouped into levels, which are controllable via an application interface. Each of the levels have a known energy consumption in both loaded and un-loaded mode..

Passivhus - En undersökning om varför det inte byggs fler passivhus i Sverige

This thesis tries to clarify why more houses such as passive houses is not built and at the same time the differences is described with the conventional construction as a starting point. Sweden has set environmental objectives to reduce energy consumption in buildings by 50 percent by the year 2050 compared to 1995. The passivehouse concept could have a significant role, particularly in the reconstruction of buildings with high energy consumption. For sustainable building the passivehouse technology is an economically viable concept while benefiting the environment. Initially an introduction is given of the background to the problem, purpose and objective of the thesis.

Grinda Wärdshus : Hållbara Isoleringsmöjligheter förVandrarhemmet på Grinda

pelago. There is an old inn that is located on the island that has become a very popular attraction in the last couple of years. The inn has both a well-known restaurant as well as conference facilities that are used by tourists as well as the people of Stockholm over the summer months. The inn was built 1908 and has since remained in the same condition.make islands in the archipelago more environmentally friendly and promote sustainability. One of their project islands is Grinda.

Energideklarationen : Uppfyller energideklarationen sitt syfte?

The Energy Performance Certification in Sweden was developed as a tool to achieve the Government's target to reduce Sweden's energy consumption by 20 percent by 2020. The Energy Performance Certificate has previously received some criticism for not fulfilling its purpose. Questions that formed the basis for this report is how the energy performance certification provides support to buyers of single-family houses and if the energy performance improved in terms of reliability. The report begins with a background description that describes how the energy declaration works and some of the findings of previous evaluations and surveys. A survey to investigate the broker's position to energy performance have been conducted as well as interviews with buyers and sellers of houses. An investigation whether the energy performance can vary between different calculation programs, depending on various assumptions made by the energy declarant, has been made.Brokers and sellers have proved negative attitudes towards energy performance, particularly brokers.

ISO 9000 och dess funktion i byggbranschen

The purpose with this examination task is to investigate what purchasers and building contractors think of ISO 9000 and the function of it within the building trade.In this material both the purchaser´s and the building contractor´s viewpoints and attitude towards ISO 9000 is being object to an investigation, in order to get a just picture of the function of the quality work within the building trade. The general opinion of ISO 9000 has proven to be positive. During the work with this investigation it appeared that nosystem is that good that it can´t be improved. A widely spread opinion is also that ISO 9000 means a lot of paperwork but also that the certified companies are well organized. Above all the majority demands a standard that is more adjusted to the building trade..

Energieffektiviserande åtgärderpå Robertsfors VA-nät : En förstudie av vilka energieffektiviserande åtgärdersom kan göras på pumpstationer och reningsverk

The objective of this work was to introduce measures to reduce energy and water demand at Gävle Söder 17:10. To succeed, this energy audit has been made. The work is based on collected statistics from the property owner Norrporten, measurements, literature review and through consultation with experts in the field. Two models, one for each building, have been created in the simulation program BV2 to estimate the potential of energy measures based on the collected information. The models in BV2 have been verified against the statistics of the energy consumption.With the help of calculations and simulations, seven cost-effective measures have been identified.

Energieffektivisering i sambandmed renovering : ? Analysmodell för energibesparande åtgärderutifrån ett företagsekonomiskt perspektiv

Rising energy prices and higher energy demands have led to an increased focus on energy efficiency, in particular in the real estate business, where high potential for energy savings exists. Within the next few years, buildings that were constructed in the sixties and seventies will be in need of renovation. One of the challenges of these renovations will be to improve energy efficiency. A real estate company that is facing this challenge is Uppsalahem AB, based in the city of Uppsala, Sweden. This study focused on analyzing energy efficiency measures when renovating old buildings.

Incitament för energibesparande åtgärder i den byggda miljön

More efficient energy consumption is essential to secure a sustainable future, not least within the building and real estate sector which answers for approximately 40 % of the EU countries total energy consumption. One part of EU: s work to reduce the energy consumption is the directive on energy performance of buildings which among other things have lead to stricter demands on energy performance in new and renovated buildings.One of the difficulties with making buildings more energy effective is that it often demands big investments and although it results in lower operating costs the extent of these savings and therefore also the repayment time can be difficult to decide beforehand. To make it interesting for property owners and also tenants to invest in energy efficient buildings powerful incentives are needed. Favorable loans to energy efficiency projects are one example of governmental instruments that have been tested in other European countries with good results.Reduced operating costs appear to be the main incentive for property owners to make their buildings more energy efficient. The best result of an energy efficiency project is usually achieved by cooperation between property owners and tenants but in order to make that interesting it is important that both parts can profit from the savings.

Energi- och kostnadseffektiva klimatskal : För lager-, industri- och kontorsbyggnader

A study to optimize insulation thickness for stock-, industrial- and office-buildings for external walls and roof in an economical perspective has been conducted on behalf of DynaMate. DynaMate?s role is to maintain all Scania?s buildings. Analysis has also included other parts of the building envelope, such as windows, exterior doors and industrial doors. In this thesis, three different types of exterior wall constructions has been investigated, these are a sandwich design consisting of sheet metal and a another one consisting of concrete, as well as a wall of concrete with a coating of plasters.

Frånluftsvärmepumpens möjligheter i flerbostadshus

If a building is heated by a heat pump, it is of high importance that the heat pump has a high coefficient of performance. An exhaust air heat pump extracts heat from the building?s exhaust air. The air has a relatively high and constant temperature all year around, leading to a high seasonal coefficient of performance. This thesis examines whether it is profitable to complement an exhaust ventilation system with an exhaust air heat pump in an apartment block that already has geothermal heat pump, district heating, oil- or biofuel heated system.

Det energisnåla isoleringsmaterialet

This bachelor essay is divided into two parts, the first being a construction of a single-familyhouse and the second an in-depth study of five different isolation materials, analysed from anenergy perspective.The first part, the construction of the single-family house, has been created from knowledgeacquired during three years of studying at KTH Royal institute of Technology in Stockholm, inthe program Architecture and the Built Environment. The constructed house is a one-floorhouse of 137m2with façade plaster, situated in Borlänge, Sweden. The house has a wooden framewhich is built on a on sight cast concrete foundation, on the ground. The house?s roof is a gableroof, which has an angle of 24 degrees.

Stenebergs sockerbruk: en fallstudie av en timmerstomme fr?n 1739

Stenebergs sockerbruk is a large log-timber construction, purpose built as a sugar refinery in 1739 and is one of Sweden's oldest industrial buildings constructed entirely out of wood. Despite receiving the status of a listed building (in Swedish: Byggnadsminne) in 1977, there exists today a surprisingly low amount of documentation of the building itself. In order to enhance the existing and lacking building documentation, this case study aims to shed light on the building's log-timber built frame, focusing on how it was constructed, how the long lengths of its walls were handled and what type of joinery and tools were used. A thorough investigation of the building is conducted on site, followed by gathering of information which is then presented through text and illustrations. The findings indicate the orientation of timbers, location of joints and scarfs as well as tool marks which together contribute to the forming of a basis of understanding of the building's construction..

Varför uppförs så få bostadsrätter med passivhusstandard i Sverige? : En fallstudie mellan ett passivhus- och en konventionell fastighet

Abstract Background: In 1997 the Kyoto Protocol was signed, it?s an international agreement which is aimed to reduce greenhouse gas emissions. Sweden's goal is to reduce energy using in buildings with 20 percent by 2020 and 50 percent by 2050. This is a comparison with levels from 1995 (Glad, 2006). For Sweden to be able to reach its goals, they need to construct more low-energy buildings (Åhman, Wahlström & Lundblad, 2010).

Påverkan på energianvändning och termisk komfort vid reglerinstabilitet

The purpose of the study is to investigate the possible effects of an unstable ventilation system and its influence on energy use and thermal comfort. The report also explores how qualified personal working with HVAC view and handles system control.In order to meet the requirements in energy efficiency and a comfortable indoor climate control regulation is a prerequisite. With optimized increased complexity of the climate systems, it becomes more challenging to control the system and the risk of unstable control increases. No previous studies about what affect an unstable system can have on energy use and thermal comfort have been found.The report is based on several tests were the controlling variable has been increased until the system becomes unstable. Two different types of unstable systems have been investigated.

Energikartläggning av polishuset i Gävle : Åtgärdsförslag för ett minskat energibehov i fastigheten Gävle Söder 17:10

The objective of this work was to introduce measures to reduce energy and water demand at Gävle Söder 17:10. To succeed, this energy audit has been made. The work is based on collected statistics from the property owner Norrporten, measurements, literature review and through consultation with experts in the field. Two models, one for each building, have been created in the simulation program BV2 to estimate the potential of energy measures based on the collected information. The models in BV2 have been verified against the statistics of the energy consumption.With the help of calculations and simulations, seven cost-effective measures have been identified.

<- Föregående sida 11 Nästa sida ->