Sök:

Sökresultat:

3983 Uppsatser om Electrical distribution systems - Sida 27 av 266

Analys av energilagringssystem portfolio för Volvo hybrid konstruktionsmaskiner

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Betongens yta: porbildning vid gjutning av brokantbalkar med lutande yttersida

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Flytta hus. En studie av metodval för tre flyttobjekt i Kiruna stad

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Brokonstruktion i Tibet- Ett led i att förbättra infrastrukturen i området Sichuan

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Produktivitetsarbete i anläggningsproduktion ? en fallstudie av ett entreprenadföretags möjligheter och hinder

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Identifiering av onödigt arbete. En studie vid två specifika projekt

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Platsrelaterat själv och autobiografiska minnnen hos svenskar boende i Schweiz

The aim of this essay is to examine three separate Swedish public libraries and their respective websites on the grounds of the usability sciences. I firstly had to summarize the main properties of the usability-field in order to gain an extended knowledge of its purposes and possible usage for today?s library systems. I was then able to apply the extended knowledge in the examination of the three library websites and the purpose of determining whether or not they were designed according to the standards set by the usability-sciences.Usability is a rather new science that deals with the dissection and examination of computer-based systems, in order to find the key components that make systems user-friendlier. With user needs being the main focus of its research, usability tries to meet all the different needs of the modern user and construct systems that are less system-centered and more user-centered.

Miljösystemanalys av VA-system i omvandlingsområden : fallstudie i Värmdö kommun

Wastewater handling of private sewage systems has become an all increasing matter. In Stockholm region the 90 000 private sewage systems contribute with larger phosphorus flows to the Baltic Sea than the two biggest sewage plants in the area, Henriksdal and Käppala, contribute together, even though these two plants purify wastewater from more than one million inhabitants. When summer house areas turn into areas for permanent living ? transition areas ? the load on the existing systems increases, systems that already often are unsatisfying. In those areas it is not clear what the best system choice is; On-site systems for single households; Local collective systems or Connection to central systems.

Analys och vidareutveckling av hjulupphängning till skogsmaskin

Detta examensarbete är den avslutande delen av utbildningen inom maskinteknik på Linnéuniversitetet i Växjö under våren 2013. Arbetet utfördes i samarbete med Rottne Industri AB där skogsmaskiner utvecklas och tillverkas för skogsbruk. Projektet innefattar utveckling av en hjulupphängningskomponent kallad ?hjularm? tillhörande företagets ledande produkt, skördaren H-8. Resultatet slutade i en ny design av hjularmen med hjälp av CAD-modellering, Systems Engineering och FEM-analysering..

System för statusbedömning av byggnader. Förslag innehållande förundersökning och konceptbeskrivning

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Marknadsanalys - En jämförande studie mellan hyresrättslägenheter, bostadsrättslägenheter och ägarlägenhetsfastigheter

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Optimerade klimatlösningar för köpcenter: En parameterstudie i IDA Indoor Climate and Energy

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Fiberarmerad betong - Vidhäftning av kamstål i stålfiberarmerad betong

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Suitability analysis of a reintroduction of the great bustard (Otis tarda) to Sweden

The great bustard (Otis tarda) became extinct in Sweden during the mid-19th century. Globally, populations have suffered dramatic declines during the past two centuries. Recently, local populations have stabilized or increased after hunting bans and conservation efforts. Despite positive trends the species is still classified by IUCN as vulnerable (VU), mainly due to withdrawals in the distribution. The limited distribution emphasizes the need for finding ?new? areas suitable for a translocation or reintroduction.

?Knowing what is going on? : -Tågförares upplevelser av ERTMS

The aims of the following project has beento make a proposition how to create aspecific kind of transformer. Thefollowing report evaluates the differentimportant variables and contains asuggestion for a possible design. Intheory it's an ordinary transformer that'ssuppose to transform electrical effect toa high voltage line. The design of thetransformer is using an already existingcurrent transformer design and is adjustedto work for it's specific purpose. Theproject also contains the developing of atransformer simulation model that will beused to evaluate and optimize thedimensions of the resulting transformer..

<- Föregående sida 27 Nästa sida ->