Sökresultat:
10844 Uppsatser om Electric power system - Sida 20 av 723
Tidssynkroniserade mätningar i vattenkraftstationer
Vattenfall and Svenska Kraftnät perform start-up tests, where hydropower generators are used to power up the electrical grid in case of a blackout. To monitor the electrical grid, Phasor Measurement Units (PMU) are used. Each PMU is individually equipped with a GPS-receiver to precisely timestamp the data relative to the official time UTC. During the test, it is also of interest to timestamp the measurement signals from individual hydropower generators to later compare with PMU-data, and thus study the power grids impact on the generator. The aim is to work out an appropriate method to make these measurements and to build a data acquisition system, capable of timestamp data relative to UTC, from a generator in one of Vattenfalls hydroelectric power stations. The problem is that the generator is located in an underground station which hampers the reception of GPS-signals and wiring should be avoided if possible. Time synchronization has been solved by using Vattenfalls network, which is synchronized by the network protocol NTP.
Ett folkstyre i förvittring eller fortsatt demokratisk livskraft? En studie av de norska och danska maktutredningarnas slutrapporter
AbstractThis paper is a comparative study of the final reports of the Norwegian and Danish power studies performed in 2003. While the Danish study found that democracy is thriving, the conclusion of the Norwegian power study was that democracy is in a crisis. The purpose of this paper is to find explanations to why the studies in two Nordic countries arrived at such different results.Methodologically, the paper consists of an ideological text analysis and critical analyses of the discourse. In order to study how the results of the power studies can differ so considerably, the following aspects have been surveyed; 1) external contexts (government inquiries); 2) work process (the researchers? background, role and co-operation); 3) the problem areas and themes studied; and 4) power perspectives.
Marknadsanalys - En jämförande studie mellan hyresrättslägenheter, bostadsrättslägenheter och ägarlägenhetsfastigheter
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Optimerade klimatlösningar för köpcenter: En parameterstudie i IDA Indoor Climate and Energy
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Effektivare elanvändning på avfallskraftvärmeverk : Förslag till handlingsplan för minskad elanvändning på Renovas anläggning i Göteborg
This thesis has identified and studied measures to allow for reduced use of electricity in a waste incineration plant in western Sweden. The energy extracted from the waste at the powerplant is utilized and sold in form of electricity and heat. Technical and environmentally the combined heat and power plant is by today's standards among the leading waste incineration plants in the world. The owners are constantly striving to improve the efficiency of the waste incineration plant. They have seen the opportunities for savings in reducing internal usage of electricity.
Fiberarmerad betong - Vidhäftning av kamstål i stålfiberarmerad betong
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Virtuell modulbaserad Fotbollsarena
Denna uppsats syftar att undersöka samt ta fram en modell över ett system i PC Spelet Power Soccer där användaren själv kan designa sin egen hemmaarena med hjälp av ett webbgränssnitt. Arbetet inleds med en begränsad enkätundersökning där användare fick bedöma betydelsegraden av olika inslag i en fotbollsarena. Efter resultatet av denna enkät togs en modell fram i Autodesk Maya med ett modulbaserat system. Detta kompletteras med ett webbgränssnitt där användaren väljer vilka delar som han vill placera på de olika platser som erbjuds. Till sist beskrivs själva modulen och hur den ska fungera..
Energieffektivisering av flerbostadshus från rekordåren. Analys av åtgärder med fokus på ytterväggar
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Effektivisering i byggproduktionen - Studier av arbete från ställningar, liftar och arbetsplattformar
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Förslag till ny multihall i Mölndal. Användning av BIM vid projektering i tidiga skeden
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Projektledning inom affärsutveckling för fastigheter: En studie om idé- och identifieringsfasen bland fastighetsföretag
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Kundnytta vid grusvägsunderhåll ? Trafikantens syn på drift och underhåll av grusvägar i driftområde Trollhättan
The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.
Beskrivning av systemfunktioner i kärnkraftverk med hjälp av objektorienterat modelleringsverktyg
In order to facilitate design and maintenance of such a large and complex site as a nuclear power plant, all system functions must be described in a stringent way. In the past, these descriptions consisted of text documents and logical diagrams, but today there are an increasing number of object-oriented programs available on the market which might be used for this purpose. This Master Thesis has made a closer study of one of these programs named Rational Rose. The principal of the program is to facilitate software design and development, not to create models of plants. However, using the program the same way as developing software, specifying actors then gradually extend the model with use cases, use cases diagrams etc, the same methods can be used when modelling plants.
Vindkraft eller kärnkraft - En jämförelse
The scope of this project is to make a comparison of costs associated with wind and nuclear power in order to decide which one of these is the most suitable in the case of an increased demand for electricity. It is also investigated if there are other factors that can influence the choice of energy source.An average cost is calculated in terms of kronor per kilowatt-hour (SEK/kWh) using cost of investment, operation & maintenance and taxes & subsidies. Total investment cost is recalculated to production cost using the annuity method at three different interest rates (6%, 9% and 12%).The comparison is made between three cases of wind power and two cases of nuclear power. For wind power there are two ocean-based (300MW and 100MW installed capacity, respectively) and one land-based (60MW) wind farm. For nuclear power there is one EPR-reactor (1600MW) and one AP1000-reactor (1100MW).
Driftoptimering av torkmaskin : Driftoptimering av torkmaskin 3 vid Billerudkorsnäs Karlsborg AB
The company Olofsfors AB manufactures drive belts for forest machinery, known as ECO-Tracks, and abrasion-resistant steel and cutting edges for graders, excavators and tractors, known as Bruxite and SharqEdges. Manufacturing these products requires the steel to be heated and molded, then submerged in water and hardened. The water used in the hardening of steel is pumped to the process from pits below the floor and then pumped back to the pit after it?s been used. Since the temperature of this water rises after being used to harden the steel the temperature of the pumping pit needs to be adjusted to maintain its setpoint of 21°C.