Sök:

Sökresultat:

226 Uppsatser om Electric car - Sida 13 av 16

Simulering av elektriska förluster i en vindkraftpark : Utveckling av programvaran Wind Farm ElectricSystem Calculator (WFESC)

When planning new wind farms, the cost for the internal electrical grid is estimated to account for 8-9 % of the total investment cost. On top of that, the cost for accumulated reduced income over several years (due to electrical losses), has to be added. The economic lifespan is relatively long (about 20 years) which means that an error in the loss calculation could lead to a bad decision basis. The accumulated reduced incomes due to electrical losses can be higher than the initial investment cost for the internal electrical grid.Today, Statkraft Sweden is using a template number when estimating the electrical losses in a wind farm. The actual losses are probably lower than the template number which could lead to an unnecessary high loss cost when planning a new wind farm.The aim of this M.Sc.

Luft/luftvärmepump : - Med möjlighet till återvinning

Sweden has long had access to low electricity prices due to the wide availability of hydro and nuclear power. This has now changed because of today's rising electricity rates resulting in increasing heating costs for properties, especially in the properties with electric heating systems."Ankaret" is a parish for "Svenska Alliansmissionen", which is located at "Gullbrannagården".The parish has installed electrical radiators and an exhaust ventilation system that makes the energy demand high due to the large ventilation flows. The building was built as the price of electricity was still low and would reduce energy use today by combining its heating system with an air/air heat pump. The heat pump delivers more heat into the room than the electrical energy that it uses. This lowers the electricity needs.

En jämförelse mellan Bobathmetoden och andra interventionsmetoder för Behandling av strokepatienter.

Örebro UniversitetInstitutionen för hälsovetenskap och medicin           Arbetsterapi Arbetes art: Uppsatsarbete omfattande 15 högskolepoäng, inom ämnet arbetsterapi.Svensk Titel: En jämförelse mellan Bobathmetoden och andra interventionsmetoder för behandling av strokepatienterEngelsk titel: A comparison between the Bobath method and other interventions for stroke patientsFörfattare: Maryam Tondkar MogadamHandledare: Marie HolmefurDatum: 2012-05-03 SammanfattningBakgrund: Bobath behandlingsmetod utvecklades i England på 1940-talet för patienter med hjärnskador. I denna behandlingsmetod ska patienter lära sig att kontrollera sina onormala rörelser och muskelspasticitet.Syfte: Syftet med denna studie är att jämföra Bobathmetoden med andra interventionsmetoder för att kunna se vilken behandlingsmetod som har bättre effekt för strokepatienter.Metod: Systematisk litteraturstudie gjordes i databasen AMED, PubMed och Cinahl för att ta fram aktuell forskning inom detta område. Artiklarna som kom fram är kvantitativa och Randomiserade Kontrollerade studier.Resultat: Resultatet av studierna visar att Bobathmetoden har positiv effekt för att klara aktiviteter i dagliga livet. Bobathmetoden visar förbättring från akuta fasen till efter behandling i ADL aktiviteter. Studierna visar att Motor Relearning Programme, Arm Basis training och Balance Performance Monitor träning har bättre effekt än Bobathmetoden i ADL aktiviteter.Arm Basis training, Motor Relearning Programme och Bobathmetoden förbättrade handfunktionen över tiden.

Hägn i skogsbruket :

This survey was made during the autumn of 2002 and the beginning of 2003, on commission from the National Board of Forestry. The purpose with the survey was to gather experience and knowledge in the organisation about fencing and this was made through interviews. The ambition was also to get knowledge from people outside the organisation that have great experience of forestry and fencing. The interviews were based on questions that have been composed by the author with help from the supervisors. The questions were the same to both the personal from the National Board of Forestry and to the foresters. Interviews were also made with private landowners, gamekeepers, game researcher, the County Administrative Board, the National Road Administration, pole and net retailers and contractors. The target group for this work is the National Board of Forestry to be forwarded to persons interested in forestry with the ambition to spread knowledge about how to prevent damage on the forest by browsing animals. The deer populations are big in the south of Sweden and growing populations have increased the damage on plantations of broadleaves of the most species.

Kylbehovet hos ett batteribaserat elenergilager : Med avseende på kyldistribution, drifttemperatur, klimat, isolering och termisk tröghet

Under 2011 började MacBat AB ta fram ett elenergilager kallat Macbat Energy Storage System (MESS), vilket är uppbyggt av 360 stycken tvåvolts bly-syrabatterier inhysta i ett 20 fots container. Då bly-syrabatterier är känsliga för värme är den här studien inriktad på att utreda hur stort kylbehovet blir under olika förutsättningar där kyldistribution, drifttemperatur på batterierna, klimat, isolering och termiska tröghet är varierande parameterar. Det ska även avgöras vilken konfiguration av kyldistribution och isolering som ger lägst kylbehov för de studerade klimaten, vilka är av varmtempererad, arid och tropisk karaktär.För att besvara studiens två mål togs fyra matematiska modeller fram i SIMULINK. Två luftkylda och två vattenkylda där en av varje var isolerad med 100 mm mineralull medan den andra var oisolerad. För samtliga modeller varierades drifttemperaturen mellan 25 ? 35 °C och de studerade klimaten utgjordes av Phnom Phen, Kambodja, Djibouti, Djibouti, Bagdad, Irak samt London, England.

End of line test : En studie av företaget Emotrons linjetestning i produktionen

Emotron is a company specialised in developing, producing and marketing equipment to con-trol, monitor and protect processes and machinery driven by electric motors, with an applica-tion focus. Examples of uses for their products are fans, pumps, lifts and cranes.The project is to look at Emotrons end of line test. The company has seen that at the final test-ing there is a bottleneck that restricts the outflow and prevents an increase in the number of tested products.The purpose of this project is to review how Emotrons end-of-line test works today and if there is a possibility to make the test more efficient in such a way that the quality is not at risk, while increasing the outflow of tested products.The projects first step is to look at and analyse what is causing the bottleneck at the end-of-line. When the analysis is complete, the next step is to review whether there is a possibility to solve the bottleneck and if so in what way can this be done. Emotrons most overall objective of the project is to increase the outflow of the number of tested products without jeopardizing the quality.An analysis has been made on frequency inverters, soft starters and shaft power monitors.

Vildsvinsskador inom jordbruket : hur stora är förlusterna?

Problems with wild boars are increasing in Sweden and some people argue that the wild boar population must decrease. This is mostly the opinion by farmers, while the hunters want more wild boars in Sweden. Today the population is the strongest in the south of Sweden and in the eastern parts of the country. However the population is growing stronger in other parts of Sweden as well. The population origins from these areas where they escaped from pens around 1970.

Smarta lokala energisystem, Vision-Teknik-Tillämpning

The energy sector is facing an impending paradigm shift. Today?s technology enables the end-user to generate their own energy locally at home. Furthermore, recently developed storage technologies make it possible to balance energy demand with stored energy and integrate district heating with the local power grid. This means that in the future heat and electric power will interact and energy flows is converted over energy boundaries.

Bioelectromagnetics for improved crop productivity : an introductory review with pilot study of pre-sowing treatment of tomato

Various electromagnetic (EM) treatments has been investigated for their potential in improving crop productivity over the past century. There is today an increasing amount of scientists advocating EM treatments as an organically compatible method for improving plant growth and yield. However, failure to produce repeatable effects and defining causal mechanisms has made it a study of much controversy and debate. The subject requires indepth interdisciplinary knowledge, making it inaccessible for the majority of biologists, horticulturists and growers. In this combined literature review and pilot study, these issues are addressed by providing a comprehensive introductory review of the topic plant bioelectromagnetics and its potential horticultural usability.

Alternativ uppvärmning av reningsverket på Utö - En studie av energibesparingsmöjligheterna i syfte att minska uppvärmningskostnaderna

The projects objective is to find an alternative method of heating (the current method being via electric heating) the sewage treatment plant on the island Utö in Stockholm?s archipelago in order to reduce the energy consumption and ultimately the cost for heating the plant. The project is given by ?Skärgårdsstiftelsen? (The Archipelago Foundation) and is a part of the larger EU-project ?Green Islands?.A model for the plants total heating demand is established in order to get a good perception of how much money can be saved using alternative heating methods. The heating demand model gives an annual heating demand of approximately 32 500 kWh and a maximum heating power demand of around 24,7 kW.

Fejans vandrarhem ? En studie om isolering och uppvärmningsalternativ

During the last decennium climate issues have become more and more important. Many steps towards an adaption of efficient energy supply systems have been taken all around the world. These steps have been created to ensure the next generation?s energy demand. In EU and Sweden objectives have been set to ensure that the energy consumption decreases by 20% year 2020 and by 50% year 2050 compared with the energy consumption levels of year 1995.

Förstudie för en vindkraftpark på Malmölandet i Norrköping : En undersökning av förutsättningarna för en vindkraftpark på ett sen tidigare planerat område

This is a feasibility study that examines various aspects of building a wind farm on Malmön in Norrköping. The feasibility study deals with interests of conflict, park design, electrical connections, production calculation, financial calculations and operating- and timetable.The report is divided into two distinct parts. First a theoretical part, which deals with conflicting interests, park design and electrical connections. Second a part with simulations dealing with production calculations, and financial calculations.Opposing interests are mapped so that problem areas can be found, and help put focus on the right places at a future environmental impact assessment (EIA). There are a number of areas where planners have to assess on an EIA, this thesis point on the most important areas.

Elkraftsystem för fälttest av Polygeneration system EXC

I ett modernt samhälle är elektricitet en nyckelkomponent för industrins, individens och samhällets utveckling. Naturkatastrofområden där elektriciteten slagits ut står inför stora prövningar för att kunna få samhällsviktiga funktioner att fungera igen. Med hjälp av den mobila miljövänlig energienhet Emergency Energy Module (EEM) kan elbehovet lindras.Detta examensarbetes mål var att ta fram en elsystemsbeskrivning för den kommande Export container (EXC), samt ta fram ett korrekt elschema för den befintliga EEM.Elsystemsbeskrivningen måste ta hänsyn till EXC:s kravspecifikation samt innehålla Bills of Material (BoM) och elschema. Problematiken ligger bl.a. i att få flera olika energikällor (sol, vind och biomassa förgasare) att fungera tillsammans i ett elsystem där likspänning, växelspänning, trefas och enfas blandas.

Metodutveckling för analys av PBDE och HBCD i sediment

Brominated flame retardants (BFRs) has for many years been used in products to reduce their flammability, mainly in electronic products, textiles and construction materials. In 2003, Sweden imported 300 tons of brominated flame retardants. Leakage of these compounds has polluted natural environments. Fishes has shown increased contents of these substances, especially fat fish, since brominated flame retardants tends to accumulate in fatty tissues. They are also regarded as persistent and that gives them the ability to travel long distances. What also is really scary is that increased levels of brominated flame retardants have been detected in human breast milk. The knowledge of the brominated flame retardants is limited and not so much research has been done in this field. There are many reasons though, to keep the research going. Partly their structural resemblance to well-known toxics as PCB, but also their ability to accumulate in biological systems and enrich in food chains. In which way they affect humans we really don?t know yet.

Latent värmelagring i vattenburet uppvärmningssystem med elpanna för byggnadsapplikationer

Latent heat storage is a way to store thermal energy when a phase change material undergoes a phase change. The advantage of latent heat storage is the capability to store more energy per mass unit than other heat storage methods. The most commonly used phase change in latent heat storage is the transition between solid and liquid. Phase change materials can be divided into organics, inorganics and eutectics.In the Nordic electricity market the price of electricity is set every hour by Nordpool spot, which leads to price fluctuations because of changes in demand. The main goal of this report is to create a latent heat storage system in a single-family home and investigate the possibility to save money by charging the latent heat storage system when the price of electricity is low, and discharge when the price is high.The thermodynamic model consisted of a ?tube-in-tube? heat exchanger with phase change material in the outer tube and water as the heat transfer fluid in the inner tube.

<- Föregående sida 13 Nästa sida ->