Sök:

Sökresultat:

2648 Uppsatser om Efficiency Motivated Evaluation - Sida 14 av 177

Effektivisering : En utredning om åtgärder på en industrifastighet

AbstractDelta Terminal owns an outdated industrial building which they now rent out to businesses. This property currently has a high energy con-sumption and therfore it is desirable to improve the efficiency. In ordet to reduce the energy consumption within the industrial building enve-lope, the heating systems and lighting are being investegated. A good building envelope emits less heat and thus reduces the energy consump-tion. An energy audit is a tool used to determine the energy loss.

Projekteffektivitet inom tekniska utvecklingsprojekt : Vilka faktorer påverkar projekteffektivitet och hur kan dessa mätas?

The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for project efficiency and effectiveness.

Lönsam energieffektivisering : Ett samarbete mellan ÅF och kund

This thesis project has focused on studying ÅF?s business concept Energy Collaboration, which is their way of selling energy efficiency services. Thereforeongoing projects have been analyzed. The purpose was to determine achieved energy efficiency, costs and profitability for the studied projects. It was concluded that the Energy Collaboration is a good way of selling energy efficiency services, since the customer takes no risk and energy savings of about 15-25 % can be achieved with simple measures.

Visualisering av produktionseffektivitet : Utveckling av ett verktyg för övervakningav avbrott och presentation av TAK

Many companies do not register all the stops that occur in a production plant, it often takes longer to report than to fix the problem. If no problems are registered, you cannot trace where the problems arise.This master thesis was performed at AcobiaFLUX and they have noticed an increased demand from their customers to trace problems raised in their processes. The aim of the thesis was to find out how a tool to monitor a process best could be developed. Then the most essential from the theoretical base was developed into a useful tool for operators. For the operators to know if the process utilizes the full capacity of a process, the tool presents a measure of the Overall Equipment Efficiency, OEE.

Ekonomisk utvärdering av betonggjutformar

This report will try to evaluate the use of rented concrete casting moulds, which are used to build walls and system of joists. The evaluation is only examining the economical aspects.The cost of using concrete casting moulds is a big part of the total production expenses. Therefore it is important that the calculated price not exceeds the final costs of the casting moulds. The calculated price is the price used in the process of making an offer.The evaluation consists of a comparison of the calculated price and the final costs for three building projects. It also evaluates the exploitation of the concrete casting moulds for each project.The report is made by Sven Gynne and Anders Alexandersson at School of Engineering, Jonkoping University, in cooperation with PEAB Jonkoping.

SPICE UP APQP

The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for project efficiency and effectiveness.

Design for assembly

The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for project efficiency and effectiveness.

Make or buy-analys

The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for project efficiency and effectiveness.

Effektivisering och produktivitetsökning i produktionsflödet av Hammarhäftare på Isaberg Rapid AB

AbstractThe market?s demand to purchase more cost effective products is continuously increasing. The producers are forced to become more efficient and flexible with resources to produce high quality products at a low cost in order to maintain or increase market shares. With this in mind Isaberg Rapid AB is requesting a project to increase efficiency in the assembly cell of hammertackers. The company has found in Kaizen-events that there is a potential of efficiency improvements in the assembly group that has not been achieved.The objective with this paper is to identify the major factors that influence the efficiency in the assembly cell for hammertackers.

Energieffektivisering - Laholms kyrkliga samfällighets kulturhistoriska byggnader

Energy efficiency is today more important than ever, mainly due to the high energy prices and the approaching climate changes. Heating of buildings is an essential area within energy efficiency. Many buildings are old and were built at a time when the energy prices were low and the term ?energy efficiency? was unheard of. By applying today?s broad range of energy saving actions on these old, and thereby often, heating ineffective buildings, this area has a large potential in reducing energy consumption and costs.Churches and chapels are generally old buildings with, in many cases, ineffective heating systems and therefore consume much more energy than needed.

Motiv och initiativ till hållbart företagande : En fallstudie av tryckeriet Edita Västra Aros AB

Today's unsustainable resource use is influenced by many factors. One key factor isproduction methods and patterns. Trough change of production patterns enterprises can bepart of the solution to a more sustainable society. This case study has analyzed environmentalperformance of the printer company Edita Västra Aros Ltd (EVA), who has gained awards forits environmental work, and what driving forces they have had during this work. The survey isbased on a qualitative method and the collected data consists of documents and staffinterviews, which have been analyzed with content analysis.

Rena rör : Clean pipes

In this project a washing station has been constructed for Albany International AB. At present, there is no existing system to clean the dirty pipes that are coming back to the company.The work followed the product development process, and it started with the requirements list. This was followed by brainstorming, evaluation and completion.The result was a concept for de present time and one concept for the future.The present concept is intended to be built immediately. This is an adjustable bench with sliding bearings to facilitate the work. The actual cleaning is done with a high pressure washer that uses hot water.

Syftet bakom kursutvärderingar ? en undersökning från ett utbildningsföretag

Kursutvärderingar kan ge svar på många frågor, och leda till ett väl motiverat förbättrings- och utvecklingsarbete. De kan även vara mycket svåra att genomföra. Forskning visar att utvärderingar ofta saknar tydliga mål, vilket leder till att resultaten blir svåra att använda. I detta examensarbete diskuteras kursutvärderingarna på företaget Kärnkraftsäkerhet och Utbildning. Målet är att arbetet ska leda till elevenkäter och undersökningsresultat som kan bidra till utvecklingen av kurserna vid Kärnkraftsäkerhet och Utbildning i Barsebäck.

Kundfokuserad miljökommunikation med CRM-system : En Fallstudie hos Green Cargo

BackgroundToday a common approach to solve a complicated problem is to assemble a temporary workforce in order to solve the problem by working together within a project. One of the difficulties with working in projects is to maintain the planned budget. Working hours and costs are often exceeded. Many companies presume that any certain project will succeed, a presumption that leads companies not to anticipate risks involved in a project. In companies today there is seldom time for evaluation or moderation of a project, in order to have time for evaluation there is a great need for an adequate planning of the project.IntentThe intention with this study is to create a model for planning, budgeting and evaluation of projects within consultancy companies.MethodWith the help of interviews and discussions within the group Hamnar och Byggkonstruktioner at Sweco has evidence to present a proposal on planning, budgeting and monitoring been developed.ResultsA model has been developed to ease for consultancy companies to plan, budget, monitor and evaluate projects.

Kartläggning av material flödesflaskhals i ICA butik.

In the spring of 2014 Sweco Systems AB were commissioned to design a ventilation system for a newly built preschool in Linköping. Terms from the client was that it cost efficiency would cope with the energy demands that are placed on the building. The unit chosen was a cross-flow heat exchanger, and this work is to compare it with two other heat exchangers to see if a more energy and cost efficient could have been chosen. The heat exchangers that was chosen for the comparison was a rotating- and a counterflow heat exchanger. Simulations have been made to the different heat exchangers by the manufacturers.

<- Föregående sida 14 Nästa sida ->