Sökresultat:
1355 Uppsatser om Eco-efficiency indicators - Sida 9 av 91
Lönsam energieffektivisering : Ett samarbete mellan ÅF och kund
This thesis project has focused on studying ÅF?s business concept Energy Collaboration, which is their way of selling energy efficiency services. Thereforeongoing projects have been analyzed. The purpose was to determine achieved energy efficiency, costs and profitability for the studied projects. It was concluded that the Energy Collaboration is a good way of selling energy efficiency services, since the customer takes no risk and energy savings of about 15-25 % can be achieved with simple measures.
Visualisering av produktionseffektivitet : Utveckling av ett verktyg för övervakningav avbrott och presentation av TAK
Many companies do not register all the stops that occur in a production plant, it often takes longer to report than to fix the problem. If no problems are registered, you cannot trace where the problems arise.This master thesis was performed at AcobiaFLUX and they have noticed an increased demand from their customers to trace problems raised in their processes. The aim of the thesis was to find out how a tool to monitor a process best could be developed. Then the most essential from the theoretical base was developed into a useful tool for operators. For the operators to know if the process utilizes the full capacity of a process, the tool presents a measure of the Overall Equipment Efficiency, OEE.
Design for assembly
The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for project efficiency and effectiveness.
SPICE UP APQP
The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for project efficiency and effectiveness.
Make or buy-analys
The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for project efficiency and effectiveness.
Effektivisering och produktivitetsökning i produktionsflödet av Hammarhäftare på Isaberg Rapid AB
AbstractThe market?s demand to purchase more cost effective products is continuously increasing. The producers are forced to become more efficient and flexible with resources to produce high quality products at a low cost in order to maintain or increase market shares. With this in mind Isaberg Rapid AB is requesting a project to increase efficiency in the assembly cell of hammertackers. The company has found in Kaizen-events that there is a potential of efficiency improvements in the assembly group that has not been achieved.The objective with this paper is to identify the major factors that influence the efficiency in the assembly cell for hammertackers.
Energieffektivisering - Laholms kyrkliga samfällighets kulturhistoriska byggnader
Energy efficiency is today more important than ever, mainly due to the high energy prices and the approaching climate changes. Heating of buildings is an essential area within energy efficiency. Many buildings are old and were built at a time when the energy prices were low and the term ?energy efficiency? was unheard of. By applying today?s broad range of energy saving actions on these old, and thereby often, heating ineffective buildings, this area has a large potential in reducing energy consumption and costs.Churches and chapels are generally old buildings with, in many cases, ineffective heating systems and therefore consume much more energy than needed.
Kartläggning av material flödesflaskhals i ICA butik.
In the spring of 2014 Sweco Systems AB were commissioned to design a ventilation system for a newly built preschool in Linköping. Terms from the client was that it cost efficiency would cope with the energy demands that are placed on the building. The unit chosen was a cross-flow heat exchanger, and this work is to compare it with two other heat exchangers to see if a more energy and cost efficient could have been chosen. The heat exchangers that was chosen for the comparison was a rotating- and a counterflow heat exchanger. Simulations have been made to the different heat exchangers by the manufacturers.
UTVECKLING AV SUPPORTARMFÖR PARALLELLA INSTALLATIONER
The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for project efficiency and effectiveness.
Framtagning av smyckeskollektionfrånidé till marknad
The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for project efficiency and effectiveness.
Energieffektivisering av befintlig bebyggelse med exempel från Göteborgsområdet
This thesis concerns to investigate renovations of existing buildings aiming at enabling energy efficiency, from a conservation and restoration perspective. This includes performing case studies of three projects in the Gothenburg area where renovations has been done and an analysis of directives raised by the EU and later implemented by the Swedish National Board of Housing, Building and Planning, Boverket. In addition to these, regulations enforced by the Swedish law, related to the topic, have been considered.The investigated projects in this case were the housing cooperative Välten in Brämaregården, the Solar Buildings in Järnbrott and Gårdsten as well as Katjas Gata 119 at Backa Röd. In order to measure and compare the results of these projects a comparison between the pre- and post-restoration energy consumption have been performed. To capture additional perspectives the grading system Operation Kungsörn has been applied.Regarding the comparison of energy consumption the renovation of Katjas Gata 119 was found preferable but showed in my view lacking attention to the cultural heritage of the area.
En analys av vagnparksplaneringen i etthyrbilsföretag utifrån ett leanperspektiv.
The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for project efficiency and effectiveness.
Sälja eller låna ut, är det skillnad? - En experimentell komparativ studie av återvinningseffektivitet i bibliografiska databaser.
The aim of this thesis is to answer whether a group of databases dedicated to selling books or a group of databases dedicated to lending books is more efficient. The measurements used to determine the efficiency of the two kinds of databases are Cumulated Gain and precision in modified versions. The inquiry has been conducted thus that the same 18 queries have been put forth to six databases and these results have consequently been judged according to relevance on a 4-graded scale by five respondents. The rankinglevels have then been merged to one average value per respondent and ranking. These values have then been used to determine CG/iCG/nCG and P@n per query, rank 1-10, per database and per group (the groups being STORE (BUTIK) and LIBRARY (BIBLIOTEK).
Terminalisering hos JM AB
During the last decade, the construction industry has focused on improving and optimising its production process. The construction industry is now facing larger changes regarding efficiency in their supply chain for the next decade. Many companies are now trying to optimise its supply chain together with its supplier. JM AB, which is one of the biggest construction companies in Sweden, is looking at different options to improve its own logistics together with their suppliers. One option is to use a terminal between JM and the suppliers to solve problems such as quality, custom service and inventory for the in production.
Mätmetoder och nyckeltal: en kvalitativ studie om hur bibliotekschefer mäter bibliotek
The aim of this master?s thesis is to examine how managers in some public libraries are using performance measurements and to what extent decision making is based on the results. The main questions posed are:??What performance measurements and indicators are used in the libraries examined???What is the attitude towards performance measurements among library managers???How and to what extent are performance measurements and indicators used in the process of decision making???What improvement would library managers wish regarding the development of performance measurements in public libraries?The theory is based on a model of evaluation of the public sector in addition to general steps of evaluation of quality and performance measurement results. The investigation is based on qualitative interviews with seven managers of public libraries in Sweden.