
Sökresultat:
991 Uppsatser om Dynamic thinking - Sida 55 av 67
Invandrares upplevelser av diskriminering och den politiska diskursen om invandrare i Sverige mellan 1960-2009
Aim: This paper aims to produce a serviced office concept adjusted to Statens fastighetsverk. The concept will make SFV:s properties more attractive for renting. Method: Information has been collected from interviews with 13 different serviced office companies, one serviced office agent and eleven government authorities. Also litterateur, reports and internet have been used in gathering information.I will use following questions:¨ How is the serviced office concept designed?¨ Which customer segment should SFV direct to and what need does the segment have?¨ How shall a marketing plan look like for the concept?¨ How should a concept designed for SFV look like? Result & Conclusions: Serviced office space is a company that letting functional workspace with access to shared facilities e.g. reception, office machines, internet, phone and more.
En kringflackande studie, i tre resande romaner : En läsning av romanerna Sargassohavet, Desirada och De osynliga städerna utifrån Édouard Glissants Relationens filosofi. Omfångets poesi
In this essay I have read the novels Wide Sargasso Sea (Jean Rhys 1966), Desirada (Maryse Condé 1997) and Invisible Cities (Italo Calvino 1972) through Édouard Glissant?s notion of the primary scene in Philosophie de la relation. Poésie en étendue. I have examined how the primary scene can be seen as a political/an aesthetical strategy in the three novels. This was done in order to question the blunted tool of the notion of the identity, which is often considered in studies regarding ?postcolonial novels?.
Platschefens ledaregenskaper. Sett ur medarbetarnas perspektiv
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Metod för beräkning och jämförelse av lönsamhet för trafiksäkerhetsåtgärder
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Energianalys av lackeringsbox. Utredning av ventilationssystem med åtgärdsförslag
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Bostadsbyggande i Skövde fram till år 2025
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Ventilationssystem med variabla luftflöden - Optimal dimensioneringsmetod för VAV
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Koffeinets inverkan på prestationsförmågan vid styrketräning ? En systematisk översiktsartikel
AbstractTitle: The effect of caffeine on performance during resistance training ?A systematic overviewAuthor: Amanda Jonsson and Erica BenderSupervisor: Mette AxelsenExaminer: Anna WinkvistProgramme: Dietician study programme, 180/240 ECTSType of paper: Examination paper, 15 hpDate: 2015-03-31Background: Products with high content of caffeine has in recent years become popular for optimizing physical performance. Caffeine affects mechanisms in our body which can be beneficial to perform better during exercise, but the theories have not yet been systematically reviewed.Objective: The purpose of this review article, is to examine the acute effect of caffeine intake before strength training on athletic performance with the outcome muscle endurance.Search strategy: A systematic literature search in databases PubMed, Scopus and Cochrane using keywords: ?Caffeine?, ?strength?, ?muscle?, "resistance training", "muscle strength", "strength training", "athletic performance", ?repetitions to failure?, ?muscular endurance? and ?endurance training?.Selection criteria: Healthy subjects, 16-50 years old, with experience in strength training. Studies with a caffeine intake > 5 mg/kg body weight, which participants performed dynamic strength exercises on a weight > 60% of their 1 RM.
?Den stora förändringen?. En mönsterkollektion höst/vinter 2013
The big change is a project where I created patterns on fabric. It is a collaborative project with Lotta Niemi. She studied fashion and textile designers and tailors from the Swedish School of Textiles in Borås and University of Technology in Sydney. The collaboration was to create designs on fabric for her upcoming clothing line for women, Fall / Winter 2013. The clothes will be sold online, in stores in Sweden and Japan.For Lotta Niemi?s clothing line, I wanted to create exclusive designs, rich patterns that worked out handmade and digital.
Uppföljning av EcoDrivingutbildning
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Underhåll av asfaltbeläggningar. Utvärdering med inriktning mot årskostnad och livslängd
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Utvärdering av samverkansbjälklag. Stålbjälklagskassett jämförd mot plattbärlag och håldäcksbjälklag
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Strategier hos de stora svenska byggföretagen 1992-2006
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Solvärme för flerbostadshus. Utvärdering av EKSTA bostad ABs solvärmeanläggningar
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Studie av beräkningsmetoder för pålar i kohesionsjord med pågående marksättningar
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.