Ventilationssystem med variabla luftflöden - Optimal dimensioneringsmetod för VAV

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Koffeinets inverkan på prestationsförmågan vid styrketräning ? En systematisk översiktsartikel

AbstractTitle: The effect of caffeine on performance during resistance training ?A systematic overviewAuthor: Amanda Jonsson and Erica BenderSupervisor: Mette AxelsenExaminer: Anna WinkvistProgramme: Dietician study programme, 180/240 ECTSType of paper: Examination paper, 15 hpDate: 2015-03-31Background: Products with high content of caffeine has in recent years become popular for optimizing physical performance. Caffeine affects mechanisms in our body which can be beneficial to perform better during exercise, but the theories have not yet been systematically reviewed.Objective: The purpose of this review article, is to examine the acute effect of caffeine intake before strength training on athletic performance with the outcome muscle endurance.Search strategy: A systematic literature search in databases PubMed, Scopus and Cochrane using keywords: ?Caffeine?, ?strength?, ?muscle?, "resistance training", "muscle strength", "strength training", "athletic performance", ?repetitions to failure?, ?muscular endurance? and ?endurance training?.Selection criteria: Healthy subjects, 16-50 years old, with experience in strength training. Studies with a caffeine intake > 5 mg/kg body weight, which participants performed dynamic strength exercises on a weight > 60% of their 1 RM.

Anledningar till staters anskaffande och behållande av kärnvapen och faktorer som påverkar staters kärnvapenpolitik

The purpose of this thesis is to explain why states obtain nuclear weapons and the role variousactors and interests play in the making of states´ nuclear policies. The main questions are asfollows: (1) What big theories exist concerning states obtaining nuclear weapon and nucleararmament in International Relations and what relevance do they have of the post cold-war period?,(2) What is the meaning of the perspective of the Military-Industrial Complex (MIC)?, and (3)Arethere empirical studies which supports the existence of a MIC in the United States?The focus lies on actors and driving forces that are internal to states and it is also important toinvestigate if the theories have relevance for the post 9/11-era. The study uses the method ofqualitative literature-study with some quantitative segments. It is claimed that states might beinterested in justifying their behaviour in a morally appealing way and that real reasons may behidden.

Uppföljning av EcoDrivingutbildning

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Underhåll av asfaltbeläggningar. Utvärdering med inriktning mot årskostnad och livslängd

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Solvärme för flerbostadshus. Utvärdering av EKSTA bostad ABs solvärmeanläggningar

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Utvärdering av samverkansbjälklag. Stålbjälklagskassett jämförd mot plattbärlag och håldäcksbjälklag

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Studie av beräkningsmetoder för pålar i kohesionsjord med pågående marksättningar

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Strategier hos de stora svenska byggföretagen 1992-2006

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Representativ valdemokrati? : Gör den valdemokratiska idealtypen rättvisa åt den representativa demokratin?

In modern, Swedish political science there are different ways of looking at ?democracy?. A very common distinction is that between three groups of democratic theories: electoral democracy, participation democracy and deliberative democracy.The nowadays frequently used concept of electoral democracy is often used as synonymous with the older concept of repre­­­­sen­tative or indirect democracy ? frequently regarded as a contrast to the direct democracy of ancient Athens. However, there are also important differences.

Projekteringshandbok i praktiken. En studie om hur en projekteringshandbok används och kan förbättras

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Laddningens påverkan på sprängskadeutbredningen

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Ekonomiska konsekvenser för energisparande åtgärder vid ombyggnad. Upprustning av miljonprogrammet

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Uppföljning av räckesreparationskostnader inom Vägverket Region Norr/Sydöst

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Mätning och undersökning av elkvalitén i elnätet på reningsverket GRYYAB, Göteborg

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.