Sök:

Sökresultat:

813 Uppsatser om Diameter measurement - Sida 22 av 55

Utveckling av leverantörsutvärderingar i stora byggföretag -En fallstudie hos PEAB

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Yttäckande nivåkontroll vid byggnation av vägar - en analys av mätutrustning

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Knacksensorplacering på lastbilsmotor

This work is an experimental study where knock sensor placements are investigated using engine tests. The aim is to studythe quality of the signal from knock sensors and how the signal for engine control is affected at different sensor locations on Scanias, engine DC13. To find out at witch position on the engine youcan get a usable signal for engine control, the engine is running while the knock sensors with advanced measurement equipment is connected to the engine. Evaluation of signals from the knock sensors are made in the computer program Matlab. The program is producing a seriesof plots, from these plots it is visually possible to draw conclusions and find connections.

Mätningar och undersökning av elkvaliteten i elnätet på reningsverket GRYAAB, i Göteborg

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Anpassade energisystemlösningar för passivhus - med hänsyn till byggnadens värmekapacitet

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Effektivisering av kvävereduktionen i en konstruerad våtmark avsedd att behandla avloppsvatten

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Utformning av utskovskanaler och nedströmsslänter : En jämförelse av energidissipation vid överströmning av fyllnadsdammar

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Miljöanpassade tjänsteresor. En kvalitativ studie av privata aktörers resepolicy

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Arsenikförorenad mark efter träimpregnering : fastläggning, spridning och efterbehandling

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Är företagets lönsamhet och finansiella ställning avgörande för beslut beträffande företagets expansion?

Even if the main purpose is to decide if the companies profitability and financial position is a determining factor for its growth, the purpose is to determine if there are any differences between big and small companies in there economical positions then they grow, in the selected industry. This thesis is mainly a quantitative study. The selected industry for the study is extraction of turf. The financial measurement that most clearly differ the growing companies from the not growing companies or the companies that didn?t change there amount of employees was the returns of the companies own capital.

Påverkan mellan ekonomistyrningen och inköpsfunktionen : En studie av Sandvik och Scania

AbstractTitle:The Impact of Management Control Systems on the Purchaser Function - A study of Scania and Sandvik Authors: Mohammad Reza Akhbari and Johanna Sullivan Svensson Published: 2011 Keywords: Management control, purchasing function, impact, control, control instruments, Key Performance Indicators, measurement, communication and organizational structure. Background and problem formulation: In order for a company?s business idea or vision to be fulfilled, the management of a company needs assistance from various means to intentionally affect the operation in the desired direction. Management control concerns activities of both financial and non-financial character in order to implement the strategy of a company and to reach profitability. Since the purchaser function is responsible of spending 50 percent of a company?s total revenue, the function has an optimal starting point to be a key actor in the shaping and execution of a company?s strategic plan.

Utvärdering av svensk vindkraft : Skillnaden mellan skogs- och traditionella placeringar

During the last years commercial Wind Power Turbines (WPT) has become larger regardingto the generator sizes and hub heights. Available hub heights around 100 meters is nowcommon, which has led to profitability for WPT located in forests where there normally are tolow wind speeds. The current knowledgement regarding turbulence and the variation in thewind profile for the outcome of the power production for the WPT in forests is limited.In this Master of Science thesis an investigation concerning forest located wind power plantshas been made. The purpose has been to investigate if plants located in forest perform lesscompared to wind power turbines located at more common locations.The analyses are based on statically material for determining the availability,production/generator size, production/hub height, production/swept area and how thetopography affect the production results.The analyses show that the variation in production result for WPT located in forest comparedto turbines located at other locations is small. The availability is high and the productionresults are good..

DSP-baserat instrument för fjärrmätning av larmnät

Fält Elektronik AB i Kalix utvecklar och tillverkar bland annat larmsändare för fast uppkopplade larmnät. Fast uppkopplade larmnät används för att åstadkomma övervakad och säker överföring av larm och annan information mellan tekniska system för skydd och säkerhet. Larmöverföringen är ständigt övervakad från larmanläggningen ända fram till larmcentralen. Ett problem som idag finns i larmnät är att om man tappar kontakten med en larmsändare så vet man bara att man tappat kontakten, men inte varför. Därför vill man nu utveckla ett instrument som kan mäta och kontrollera vad som orsakar att uppkopplingen bryts t.ex.

Utvärdering av Raman- och IR-spektroskopi, differentiell svepkalorimetri och dielektrisk spektroskopi för materialstudier på choklad

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Utveckling av dataanalysprogram för Opcon Powerbox

Opcon Powerbox is a product developed by Opcon together with the underlying company SRM (Svenska Rotor Maskiner) where surplus heat from the industry is used through an Organic Rankine Cycle (ORC)?process to produce electricity. An ORC-process is a thermodynamic circle process in which a refrigerant is used as the working fluid. The refrigerant makes it possible for the circle process to operate at lower temperatures than the conventional Rankine process.In this master?s thesis a data analysis software for the Opcon Powerbox has been developed in which measurement data is retrieved and handled from the Opcon Powerbox.

<- Föregående sida 22 Nästa sida ->