Sökresultat:
8292 Uppsatser om Design water demand - Sida 22 av 553
Design och implementation av en webbsida med tillhörande administrationssystem
This report describes how the process has evolved during the creation of a new web page forthe company Scandinavian Travel Agent DMC. The design methods that have been used aredescribed and also how parts of the webpage have been created by using the design methodresults. Our reflections around design and functionality are explained and how usability hasbeen our main focus during the master thesis. We also describe how it has been to work withan external costumer and how the tasks constantly have changed and been added as theprocess has continued.The background to this work is that AB Scandinavian Travel Agent DMC need to improve theircurrent web page. This to give the clients better needed information about destinations, butalso to stand out in the competitive travel business.
Rimbo våtmark : en förstudie på förväntad kväveavskiljning och lämplig växtlighet
This study was made as a part of a feasibility study on a polishing wetland at Rimbo wastewater plant (wwp) in Norrtälje municipality. The wwp had to decrease the nitrogen discharge to reach the limit 15 mg tot-N/l. The nitrogen in the outlet was mainly in the form of nitrate, hence the wetland mainly ought to support denitrification. The proposed area for the wetland was situated right next to the wwp and was already in the municipalitys posession. One aim of this study was to examine what spieces of plants needed to achieve highest possible denitrification.
Analys, design och implementering av Orbit ones dokumenthanteringssystem
This report describes the development of a system for controlling documents. The report starts with a problem description which the company wants an intranet-based solution for. The report then continues to describe the development phase for the different parts of the system which results in a complete system. The company that wanted this system is called Orbit One and is located in Ronneby, Sweden. They have had a problem with old documents circulating in different versions and in different binders.
Kv. Vattenspegeln södra Munksjön, Jönköping : Hur kan ett attraktivt bostadskvarter utformas vid södra Munksjön?
The purpose is to understand the planning process for residential buildings and toinvestigate the consequences of the choices made in the process. The project will alsoprovide broader knowledge in the design and development under the current law andpractice.The goal is to present a proposal on how a city near the site where water can bedesigned from a sustainable perspective. How can a residential neighborhood be anenvironmentally sound and sustainable region? New systems and techniques havebeen presented previously in terms of sustainable environments and these are intendedof being used in the project Quarter Water-mirror.The project has been implemented on the computer program ArchiCAD in whichdrawings and visualizations have been carried out. These drawings are included asannexes to the report.For information, calculations and drawings, laws for physical planning and Swedishstandard have been followed.Residential buildings have been designed on a site, which is 2, 5 hectares.
Närsaltsdosering till luftad damm : en åtgärd för ökad TOC-reduktion hos Skoghalls Bruk luftade damm
In the process of making carton boards into Skoghall Mill, are great quantities of water being contaminated. This water has to be treated before it is possible to release into the recipient, Kattfjorden. One of the contaminations that is important to extract from the wastewater, is organic carbon (measured as TOC-total organic carbon) because microbiological breakdown can lead to the bottom becomig free of oxygen.The wastewater treatment at Skoghall Mill is done through an external wastewater treatment that is located at the factory. The biological treatment (aerated lagoon) is a 140 000 m3 water pool with surface aerator, which is give oxygen to the water. In the lagoon live microorganisms who performs the biggest part of the TOC-reduction.One problem with the lagoon is that the treatment of TOC is considerably worse during wintertime than during summertime.
New Business Model for District Heating Firms Stabilizing the National Energy System with a Future Variable Electricity Production
The aim of this thesis is to develop a new business model for district heating and cooling firms which can contribute to a stabilization of the Swedish national energy system. The business model is developed for a district heating and cooling firm and is exemplified with Fortum Heat. The theoretical investigation around the topic creates a rigid base for following qualitative empirical studies. Osterwalder?s canvas for business model generation is used together with a Casual Loop Diagram to identify a number of business opportunities which stabilizes the national energy system.
Integreringsanalys av robot och arbetsstation på ITT Water & Wastewater
ITT Water & Wastewater ställer höga krav på kostnadseffektiv produktion vilket är en starkt bidragande orsak till att företaget är världsledande på sin marknad. För att erhålla kostnadseffektiv produktion har kombinationen människa robot visat sig vara framgångsrik.Examensarbetets syfte var att ta fram underlag åt ITT Water & Wastewater för att ta beslut om frigörande av indirekt personal vid line 15:s isoleringsstation på Elmotorverkstaden. Syftets uppfyllande stöttades av de underbyggande syftena att försöka höja robotens utnyttjandegrad samt reducera isoleringsmaskinens omställningstid.Arbetet bygger på kvalitativa och kvantitativa data i form av mätningar, intervjuer och egna observationer. Med stöd av erhållen data lyftes fyra olika förslag fram. Förslagen understryktes bland annat av integrering av arbetsmoment, förhöjd automatiseringsgrad och outsourcing..
Referensvåtmarker för uppföljning av växtnäringsretention i anlagda våtmarker
One of the environmental problems today in seas, lakes and streams is eutrophication. This is often caused by nutrients such as phosphorus (P) and nitrogen (N) that leak from agricultural areas. A measure to partly prevent the nutrient discharge is to construct or restore wetlands.In order to control the efficiency of nutrient reduction of existing wetlands in the county, the administrative board in Västra Götaland wants to find different criterias for reference wetlands. These reference wetlands should represent other wetlands and be used in future evaluations of reduction of nutrients and design of constructed wetlands. According to the administrative board in Västra Götaland the reference wetlands should have a catchment area of about 50 hectare consisting of at least 70 % arable land, to represent wetlands created to remove nutrients.
Utveckling av högspänningskontakt
This report describes the development of a high-voltage connector at the request of Scandinova Systems AB in Uppsala. The development process is described from the making of a customer demand specification, to the making of drawings for the manufacturing of prototypes. Scandinova develops high-voltage modulators, hence the need for connectors that can handle very large power pulses. Their current connector has several weaknesses that may cause the connector to melt or catch fire. The development began with a number of studies that included the modulator structure and the current connector structure and functions.
Analys av nivåproblematik i dränagetank på Ringhals 1
The focus of this project has been on the drainage tank of the reheater on Ringhals 1. This tank has on two previous occasions received such a high water level that the system automatically emergency stopped. For this reason, events and various readings from these two occasions has been specifically studied and analyzed. In order to prove theories about what causes these problems a model of the system was created in the program Dymola. Using simulation results from the model, we have been able to demonstrate how the system's measured values should look likeunder normal conditions with respect to flows, pressures, temperatures, valve positions and water level in the drainage tank.
Jämförelse mellan våtkompostering och andra VA-system i omvandlingsområden : en fallstudie i Norrtälje kommun.
Eutrophication of the Baltic Sea and Swedish lakes remains a major problem despite many years of effort to reduce the emissions of nutrients. One major source is waste water systems, especially private sewage systems. These sewages accounts for a very large share of nutrients per capita in comparison with citizens connected to larger sewage treatment plants. Norrtälje community has the greatest number of private sewage systems in Sweden. Discharges of nutrients, especially phosphorus, to the Baltic Sea from these sewage systems are significant.
Beredskapsvattenförsörjningen på Sjukhuset i Varberg -En källa till problem?
The hospital in Varberg has a somewhat outmoded solution regarding the state of preparedness in its water sustentation. Today?s solution is both cause to a number of mishaps and high energy consumption.The report is initiated by looking into the present situation to get an insight to the problem.Today?s media depletion is measured and analyzed.Furthermore, it also looks into some earlier performed studies. These studies are followed up in order to see if measures have been taken.The report presents a number of arrangements which should be taken, amongst those a minor re-build of the current solution and a number of arrangements which leads to decreased water consumption..
Tillväxt hos Husmossa (Hylocomium splendens) i boreal skog och växthus : effekter av ökad vattentillgång
Hylocomium splendens (Glittering wood-moss) is a common species in the Nordic countries and can be found in many different types of boreal forests. It usually forms dense moss carpets on the forest floor. The shoots grow in segments and new segments form annually on the previous years growth. The size of the segments is probably regulated in a high extent by local micro environmental conditions. Previous experiments suggest increased growth of H.
Meeting, greeting & seating : a design proposal for Magomeni garden, Dar es Salaam, Tanzania
More than fifty percent of the world population today lives in cities, and the pressures of urbanisation are particularly present in developing countries. As landscape architects, it is important to gain knowledge about the effect of urbanisation and ways to prevent the negativities. Experiencing the effects in person in a developing country, as well as learning from and about other cultures, enhances the understanding for global situations.
Dar es Salaam is located in one of the most rapidly urbanising regions in the world, which puts pressure on the environment and the humans living in it. Lack of means to regulate land development has led to a situation where expansion of unplanned settlements occurs, with spatial disorder as a consequence. This has in the extension led to a decreasing amount of publicly available and qualitative green spaces, and degradation of the few ones that exist.
There are facts that strengthen the status of urban parks, which especially becomes relevant in developing countries where many people live in sparse and exposed conditions.
Växters förmåga att ackumulera metaller : Vass, bredkaveldun och gäddnate i Bergviks dagvattendamm
AbstractSurface-water includes different kinds of pollutants from traffic and roads. To prevent these pollutants to reach nearby lakes one can construct surface-water ponds on locations with heavy traffic. At Bergviks shopping centre in Karlstad, two ponds, one smaller and one bigger has been constructed in order to decrease the pollutant pressure from the receiving waters of Kattfjorden. Several heavy metals are essential for plants and animals in low concentration but when they occur in higher concentrations, they become toxic to the organism. The larger pond at Bergviks shopping centre has a sedimentation function so the heavy metals sink to the bottom thereby not releasing directly in to Kattfjorden.