Sök:

Sökresultat:

19 Uppsatser om Damper - Sida 1 av 2

Vridspjäll

Our education at Halmstad University was completed with a degree project. Our task was to improve an already existing pneumatic Damper to Nederman in Helsingborg. Overall we have made necessary calculations to make the design of the existing Damper smaller. When these calculations were done, we moved on with an analysis of the existing Damper in order to figure out what improvements could be made on each part of the Damper. The result of this project is a smaller and a more supple design of a pneumatic Damper. To this we have also created complete drawings, calculated material expenses; we have also created an assembly of a pneumatic Damper in Catia v5..

Dämplindningens inverkan på spänningens kurvform i en vattenkraftsgenerator

Harmonics are a well-known problem that has to be dealt with in the design of thegenerator. Internationally accepted standards limits the amount of harmonics allowedin the no-load voltage. These limits can be difficult to fulfill with integral slot winding,where the number of slots per pole and phase is an integer. The presence of theDamper winding often makes the problem with harmonics even worse and harmonicswith frequencies of order 6q±1 arise with significant amplitude. How the Damperwinding is designed affect the content of harmonics in the no-load voltage and the aimwith these ? has been to investigate in which extent design of the Damper windingaffects the contents of harmonics.Simulations with the 2-D finite element method have showed that if the Damper barsis centered in the pole shoe, the amplitude of the harmonics of order 6q±1dependsboth on the ratio between the stator slot pitch and Damper bars slot pitch and if theDamper bars are connected between the poles or not.If the Damper bars is displaced with ¼ stator slot pitch alternately, the amplitude ofthe harmonics of order 6q±1 is reduced and the influence of the ratio between thestator slot pitch and the Damper bars slot pitch will vanish.

Simulering av hydrauliska dämpare i borrslagverk

This master thesis consists of the creation of shock absorber models for percussive rock drills. A model of the rock was also developed. These models were connected to existing models of the rock drill to create a complete simulation of the rock drilling process.When the models had been created the rock model was evaluated by comparison with measured values from lab tests. The verified rock model was then used to evaluate the shock absorber models.Four new shock absorber concepts have been developed. Three of these have been modelled, while the fourth have only been sketched and described.The evaluation of the models showed the following:? Simulations of the single shock absorber don?t correlate to reality very well.

Broms- och styrsystem för möbeljalusier

This report is the result of a master thesis at the Department of Mechanical Engineering, Division of Industrial and Economical Development, at Linköping University of Technology. The project was carried out on behalf of Fanerami AB, Mjölby and includes 20 weeks of full time schedule work.Cabinets with vertical mounted roller shutters all share the same problem, namely weight balancing. A roller shutter has an equilibrium area where the sum of the different forces acting on the shutter equals zero. As the shutter leaves that area it will pick up speed as it falls towards the bottom. When the shutter hits the bottom of the cabinet there is a potential risk of getting fingers caught and in this project a solution to prevent this from happening was to be presented.In this project, three concepts have been generated with the following different purposes:?In concept 1 the risk of getting any fingers caught when the shutter closes was to be eliminated in an efficient and inexpensive way.?In concept 2 the roller shutter had to be balanced at all time providing the possibility to keep the cabinet open in any position.?The last and most challenging task was to create a remote controlled TV cabinet.

Utveckling och konstruktion av dämpare och låssystem för vågkraftverk

The division of Electricity at Uppsala University is developing a wave energy converter(WEC) consisting of a linear generator connected to a bouy at the water surfacethrough a wire cable called the connection line.During extreme conditions, the wave power plant will experience forces up to 500kN, which lead to unnecessary wear and will ultimately cause the failure of theconverter. To prevent this there is a need for a Damper.The wave energy converter works at a maximum efficiency when the translator?sare centered with respect to the stator. Due to tidal movements the position of thetranslator can deviate. There for a mechanical divice that will compensate for this isneeded.This report describes the further development of an earlier project where a tidalwave compensator for a wave energy converter of Seabased AB was developed.

Utveckling av spjäll till plattvärmeväxlare

Detta examensarbete handlar om utveckling och konstruktion av ett spjäll och spjällblad till en plattvärmeväxlare som ingår i Fläkt Woods AB:s produktsortiment.Bakgrunden till utvecklingen berodde på två problem med det nuvarande spjället. Ett problem var att det fanns vissa hygienproblem med befintlig konstruktion som behövde rättas till och ersättas mot en bättre lösning. Detta för att produkten ska kunna certifieras enligt normen VDI 6022. Det andra problemet var att den befintliga konstruktionen kändes gammal och behövde förbättras.Examensarbetet omfattar två stycken huvuddelar/mål. Den första delen är att finna ett material för att kunna täta i spjället på ett effektivt sätt.

Energideklarationer - Marknad och Kundkytta

The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.

Bygga hus i traditionell härjedalsstil

The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.

Svävare: Konstruktion av hytt till en svävare

 This report will describe a project between two students from Karlstad University and Markus Norström from Hovercraft solutions. The project aim was to develop a cabin for the hovercraft 380TD. The project was divided into two sub parts; one concerning the design of the cabin and one concerning the engineering. Throughout this rapport you can follow the engineering part of the project. The project has followed a systematic product development process resulting in optimized results for material selection and engineering solutions.

Barns datoranvändning i förskolan : Lärtillfälle eller tidsfördriv?

 This report will describe a project between two students from Karlstad University and Markus Norström from Hovercraft solutions. The project aim was to develop a cabin for the hovercraft 380TD. The project was divided into two sub parts; one concerning the design of the cabin and one concerning the engineering. Throughout this rapport you can follow the engineering part of the project. The project has followed a systematic product development process resulting in optimized results for material selection and engineering solutions.

Utredning av primärluftförvärmning till två avfallseldade pannor

The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.

Energieffektivisering av stenstadshusen - genom byggnadstekniska energisparåtgärder

The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.

Anpassning av passivhus för ett kallare klimat - teknisk och ekonomisk analys

The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.

Byggnadsfysikaliska riskbedömningar : Metod för tidig hantering av fuktsäkerhetsfrågor

The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.

Rationell produktion av platsgjutna stommar för flerbostadshus

The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.

1 Nästa sida ->