Sökresultat:
1703 Uppsatser om Cost Constraint - Sida 5 av 114
Effektiv partiformning : analys och tillämpning på Uppåkra Mekaniska AB
This paper is the result of a case study conducted at Uppåkra Mekaniska AB during the spring of 2006. The task that was presented by Uppåkra was to develop a basis for a decision for the planning activities at the company, so that in the future they can create lot-sizes which are based upon a total cost perspective. Total cost in regards to lot-sizing is defined as the sum of the administrative reordering costs and warehousing cost per stock keeping unit.To collect data a series of interviews and observations were conducted. This data was then used during the lot-sizing simulation and analysis. The 15 units that the simulation was conducted on were grouped into three item classes depending how many different machine setups they required during the production process.
Konstruktion av kostnadseffektiv fläkt till härdningsugnar
Scana-Booforge is a Swedish company which specialize in heat treatment of various metal. The treatments take place in quenching ovens, where fans are used to circulate the hot air. The fans used today do not have a satisfactory lifespan. This thesis aims to develop a new design of the fans for the quenching ovens, and the goal is that the new fans will bring cost savings for Scana-Booforge.The design development process started with mapping out the environment in which the fans operate, and with analysis of the existing fan structure and damages, in order to establish the cause of failure and of short durability. The performance of the fan were also established at this stage.
Triage - hälsoekonomi : resursallokering och kostnadsberäkning för olika proriteringsnivåer inom akutsjukvård
When a person arrives at the emergency ward at the Uppsala University Hospital with his or her symptoms he or she explains the problems and then a priority process starts. The staff evaluate at which emergency level the patient is located in a model called Triage. The Triage model helps to decide the priority need and is based upon templates which point out in which of the 5 categories a patient is to be placed, to eliminate any future risk regarding his or her health. A lower triage level means lower priority but implies better health when the evaluation takes place. To obtain optimal effect of the Triage model the evaluation of symptoms must be reproducible so that patients with the same symptoms are placed at the same triage level regardless of whom among the staff conducts the evaluation.
The purpose of the study was to see if the resources are allocated based on priority level of the patients.
Skapande av hög medvetenhet : En studie i hur ett företag med begränsade resurser kan skapa hög medvetenhet med kostnadseffektiva marknadsförings metoder
Title: Creating high awareness ? A study in how a company can create awareness with cost efficient marketing methods. (Skapande av hög medvetenhet ? En studie i hur ett företag kan skapa medvetenhet med kostnadseffektiva marknadsförings metoder).Authors: Alexander Edlund and Fredrik HanssonAim: Our aim is to reveal the pros and cons of cost efficient marketing and decide which cost efficient method works best in creating awareness. We also want to determine if the methods can be integrated in a successful way to achieve greater awareness.Method/Material: We have made a qualitative approach by conducting three in depth interviews with the company Bluetooth SIG?s marketing director Anders Edlund.
Optimering av OTEC-system
Ocean Thermal Energy Conversion, OTEC, is a sustainable energy conversion technology that is not yet commercialized. OTEC is a technology that utilizes the temperature difference in oceans between the warm surface water and the cold water at 1 000 m depth to run a Rankine Cycle. This technology can produce electricity and provide synergies like fresh water, air conditioning and aquaculture. A simulation program for three alternative OTEC systems has been created in order to decide which OTEC system is most profitable; closed, open or hybrid system. In this simulation a production cost analysis is performed in order to investigate and decide which one of the three systems that has the lowest production cost. The production cost analysis also analyzes if the profitability is affected by the size of the facility. After these analyzes, the most profitable of the three different OTEC-systems is expanded by an installation of solar collectors in order to see if the thermal efficiency is improved. The result shows that the most profitable system varies with the size of the facility.
Drivarens produktivitet vid lossningsarbete :
During the last few years the harwarder has developed from a prototype into a market product. Holmen Skog owns two harwarders and uses two more owned by entrepreneurs. In previous studies it has been shown that the harwarder was a slow and expensive forwarder. In this study the unloading at road-site was studied. The goal was to describe the differences in time consumption between unloading two-sided or single-sided (only from side of the road) and also the difference between unloading with three and four assortments in the carrier.
Betjäningskostnader i olika distributionskanaler: En fallstudie av ett svenskt bokförlag
In a time of economic turmoil and financial crisis profitability matters rise higher and higher on company agendas. Many companies are pressured to find profitability to avoid layoffs or even bankruptcy. Profitability essentially depends on the margin on the product or service sold and the costs associated with selling these products or services and hence these areas are of vital importance if companies are to improve profitability. Previous research has focused, for the most part, on product profitability while customer profitability has received less attention. This study is based on a case study of a Swedish publishing house and aims to investigate how the company?s Cost-to-Serve varies between its distribution channels.
SCA Skogs arbetsmetoder för att fastställa nyttan av en väginvestering
The basis of road investments is to minimize the transportation cost. The forest industry wants roundwood to be available during the whole year. One way of determine which road to invest in is to do a cost/benefit calculation.
SCA Forest lacks a uniform approach to determine the utility of a road investment. The goal of this report is to describe how the organization works today and find areas of improvement.
The data collection was done through interviews.
Brandteknisk dimensionering av oskyddade träförband : En jämförelse mellan Eurocode 5 och alternativa metoder
AbstractThe assignment were assigned by Camatec Industriteknik AB. Camatec is a Karlstadlocated consulting company, they make everything from pilot studies to complete projects in mechanical design and calculation. They even have their own patented product, Camcoil. It is a winder for steel strips and is used for example with hardening of the steel strip. The assignment has been to solve the problems encountered by some customers within this product.
Avskaffande av revisionsplikten : - Alternativkostnader som kan uppkomma för de mindre företagen
This essay deals with the topic options costs and whether such costs would arise for smaller companies now when they have the opportunity to choose not to have an auditor. Small companies are defined as companies that fulfill at least two of the following three criteria?s: less than 1,5 million SEK in balance sheet, less than three employees and turnover less than 3 million SEK. The decision regarding internal revision does not only affect the company itself but also other parties such as the taxation authority, banks and others that can be influenced by the decision. This essays main focus is on the influenced parties, especially the taxation authority and the banks as these have been highlighted in debates in media and because the small companies themselves may have difficulties to foresee the consequences of the new changes. The opinions from accounting companies will be considered in the essay as they can be considered as experts regarding the different aspect within this area.
Konstruktion av efterbehandlare
The purpose of this report is to examine various roof structures that can operate in a warehouse with large spans. The building that is examined in the report is currently under construction, and the roof construction has already been selected. The selected roof system will therefore be compared with some other structures and materials that have been possible. The report will evaluate three different frame materials, two insulating barriers and two overlaying materials. Another important part in major construction projects is the roof safety.
Vad kostar ett vunnet kvalitetsjusterat levnadsår? En cost-utility-analys av en ickefarmakologisk blodtrycksbehandling
Samhällets resurser är begränsade och en prioritering av olika verksamheter nödvändig. Cost-utility-analysen är en typ av ekonomisk utvärdering som syftar till att utgöra en del av beslutsunderlaget vid prioriteringsbeslut. Uppsatsen gör en cost-utitlity-analys av den ickefarmokologiska hypertonibehandling som genomförts vid Vindelns hälsocenter på individer där traditionell behandling inte haft önskvärd effekt på blodtrycket. Det sänkta blodtryck deltagarna på internatet erhöll minskar riskerna att drabbas av hjärtinfarkt eller stroke. Cost-utitlity-analysen inkluderar både till behandlingen relaterade kostnader och inbesparingar samt framtida till behandlingen orelaterade kostnader, som en följd av att individiden lever längre när riskerna minskar.
Uppföljningsarbetet av efterkalkyler på Portsystem 2000 AB
This thesis is carried out at Portsystem 2000 AB who manufactures and markets industrial doors and docking systems. The background to this thesis is that the company?s management considers that their follow-up process of cost accounts is not fully functioning.The aim with this report is to investigate and describe the present procedure of the follow-up process concerning the time of operations and come up with suggestions for improvements. This thesis is performed within the range of the following areas: Information systems, quality, processes and cost calculation. The main method we used were semi structured interviews with a fairly opened framework.
Upprustningsmetoder för en bankropp : En jämförelse ur ett LCC-perspektiv
In recent years, the Swedish railway track system has been neglected in terms of capacity and maintenance. To adapt the existing system to current traffic load there is a great need for extensive improvement and maintenance. Shortcomings are especially occurring on older embankments running over soft subgrades. To select the most suitable method for reinforcement of the embankment, it is important to evaluate different solutions from a life cycle cost perspective. In long-term perspective, it is often shown that a method with low investment cost causes a higher maintenance cost and a shorter technical lifetime.
Ekonomisk styrning och kostnadskontroll vid IT-outsourcing
Background: Many companies have outsourced their IT-operations and their expectations of what this IT-outsourcing will contribute to the business are high. Cost cuts are not always a natural outcome of IT-outsourcing. Many companies that have outsourced their IT-operations consider it to be problematic and complex to exercise management control and reach cost control which was the purpose of the IT-outsourcing. Purpose: To describe and analyze what affect IT-outsourcing has on a company?s management control system and a company?s possibility to exercise cost control.