117 Uppsatser om Contractors - Sida 7 av 8

Ekonomisk värdering av användandet av underbett på timmerbilar

Holmen Skog has in some places in their operation area access to timber trucks with centre mounted scrapers. They make transportation more flexible and reduce reliance on Contractors for road maintenance. The trucks with centre mounted scrapers have a higher tare weight, making them less productive and therefore they receive compensation with a 0.75 % increase on transportation price. The purpose of this study was to investigate what actions a timber truck with centre mounted scraper can perform with acceptable quality in winter, and to examine if it is an economically profitable solution for the truck operator and charterer. The study was done in three stages; interviews, performance analysis of the transportations carried out and an economic analysis with the help of Sven Erik Gilles spreadsheet tool. The study included the districts Delsbo and Hudiksvall.

Data och metodik för utbytesberäkning - en studie på Medelpads Skogsförvaltning

To manage the industry?s need of wood assortments in a optimal and cost effective way the forest companies need to have knowledge of the actual standing volume and the yield of the planned clear cuts. The mean volume of the trunk is also important since it is important for the Contractors prices. Today the total volume are estimated either with Näslund (1940) or Brandels (1990) functions of volumes, and the yield is estimated with Rune Ollas (1980) function for trunks and stands. The purpose of this study has been to answer the following questions: How good is the yield forecast with data collected with currently used methods? How well can the yield forecasts became with data collected according to the instructions? How well can the yield forecast be with data collected according to the instruction and calculated with the program Aptan for theoretical bucking? The study has been initiated and financed by SCA Skog AB.The material consisted of a number of randomly selected objects ready for clear cut.

Potentiella armeringsfel inom byggproduktionen : En generell studie

Reinforcement is of great importance to fulfill the dimensioned strength of a concrete construction. This requires that the work needs to be carried out with adequate results that neither endangers the workers or the safety of the construction. Progressive development of the planning phase, construction documents, and construction methods is in constant need since the technology constantly evolves.In order for Contractors to be able to get acceptances from their quotations requires that they have to increase their working pace in order to be able to leave a quotation with a lower price than the competition.Due to the increasing pace the different parts involved in the construction process is subjected to time pressure. The design stage, construction documents, work preparation and the execution are all affected when everything has to be finished quickly. To avoid problems, it is required that all parts are able to deliver good quality solutions and results under the influences of time pressure, which is not always easy.

Visualisering av säkerhetsinformation på AB Wahlquists Verkstäder

Workplace accidents in Sweden have in recent years increased. Companies are at the same time putting a greater emphasis on preventing accidents and inform about safety and risks. Therefore there is a need to know how to visualize this safety information. This study is based on a part of a project proposed by the industrial company AB Wahlquists Verkstäder, in which they want to visualize their safety information for new employees and existing staff, and also for temporary Contractors and apprentices. The purpose of this study is to see what is required of the visualization of safety information and what guidelines that should be followed.

IMPLEMENTERING AV ARBETSMILJÖLAGENS ÄNDRINGAR, GÄLLANDE FRÅN 090101, PÅ BYGGARBETSPLATSER

In the EU there are EC Directives that Member States of EU should follow. Sweden has undertaken to transpose EC Directives regarding the working environment to Swedish Provisions.  In 4 April 2006, the European Commission had some criticism against the Swedish implementation of the Construction Sites Directive. The Swedish Work Environment Authority has in response to this criticism reworked the Work Environment Act and related provision about building and civil engineering work. The changes came into force 1 January 2009.These changes have resulted in some working methods and even new responsibility subjects must be reviewed. The purpose of this exam project was to investigate if Contractors and clients in the construction sector, had have time to update themselves on this front and adapt to these changes.

Fuktsäkert byggande : Sjönära bostäder i Östra Hamnen i Västerås

Housing construction very close to the lake Mälaren has become very popular today. One potential problem with these houses is the influence of the sea climate. Unprotected buildings are affected by strong winds and precipitation. So for that reason, it is very important to make an accurate climate investigation and use it for decision-making during the planning of the new settlement.It is very important with a good moisture protection regarding pelting rain, that is the combination of wind and rain. This is more important for buildings close to a lake, as this location normally means a higher exposure to wind.

Realisering av returer vid rundvirkestransport med lastbil : hinder, möjligheter, vinster och vinstdelning

Holmen Skog, region Norrköping, is located in an area with good potential for backhauling because a large number of geographically scattered mills. However, despite these factors there are many difficulties preventing the realization of this potential. The purposes of this study were twofold. First, from a hauling contractor perspective, to calculate backhauling profits and suggest a profit sharing scheme. Second, to identify and quantify obstacles and possibilities for realization of backhauls.The study required the use of three different types of methods.

Partnering på Carlstad Conference Center : En jämförelse åt Byggbolaget i Värmland AB

Partnering is a new and exciting way of cooperation in the Swedish construction industry. In countries like Denmark and the United Kingdom the concept has been developed during a number of years while the Swedish construction industry has been more reluctant.Partnering is seen by many as the solution to the problems that often occur in design and build contracts. Many others believe that it is a way for the big entrepreneurs to gain unfair advantage. Never the less the concept is fast getting more and more appreciation, especially in the region of Karlstad where many new buildings are built that way.We have focused on the new development of Carlstad Conference Center (CCC) which is currently built with a partnering concept. The main method that have been used in this thesis are interviews with personnel on different positions in the project.

Samverkan mellan totalentreprenör och projektör i stora byggprojekt

As a result of the so called ?Million Program? between the years 1965 ? 1975 the design-build contract had its breakthrough in Sweden. Since then, the contract form has become increasingly common and now holds a strong position on the Swedish market. In design-build contracts it?s usual that the design and production time is overlapping.

Hur ser Läget ut egentligen? : En studie om arbetsmiljön inom byggsektorn

This study includes several purposes which are to describe the concept of working environment, explain who is responsible for its functioning and how the working environment should look like. Other purposes the study have is to investigate how the working environment is in both Swedish and the two investigated companies construction sites and to share some operators proposing measures for the shortcomings and problems that exist in the construction sector working environment. To achieve these purposes was a qualitative study made with unstructured observations, interviews and survey where three construction sites were observed. The result shows that the concept of the working environment cover many aspects and is essentially about the environment we live in and experience in our work and this environment can be both an indoor as an outdoor environment. In this work, the concept is divided into four areas; it is the physical, the ergonomic, the psychosocial and the chemical.

Incitament för energibesparande åtgärder i den byggda miljön

More efficient energy consumption is essential to secure a sustainable future, not least within the building and real estate sector which answers for approximately 40 % of the EU countries total energy consumption. One part of EU: s work to reduce the energy consumption is the directive on energy performance of buildings which among other things have lead to stricter demands on energy performance in new and renovated buildings.One of the difficulties with making buildings more energy effective is that it often demands big investments and although it results in lower operating costs the extent of these savings and therefore also the repayment time can be difficult to decide beforehand. To make it interesting for property owners and also tenants to invest in energy efficient buildings powerful incentives are needed. Favorable loans to energy efficiency projects are one example of governmental instruments that have been tested in other European countries with good results.Reduced operating costs appear to be the main incentive for property owners to make their buildings more energy efficient. The best result of an energy efficiency project is usually achieved by cooperation between property owners and tenants but in order to make that interesting it is important that both parts can profit from the savings.

Hägn i skogsbruket :

This survey was made during the autumn of 2002 and the beginning of 2003, on commission from the National Board of Forestry. The purpose with the survey was to gather experience and knowledge in the organisation about fencing and this was made through interviews. The ambition was also to get knowledge from people outside the organisation that have great experience of forestry and fencing. The interviews were based on questions that have been composed by the author with help from the supervisors. The questions were the same to both the personal from the National Board of Forestry and to the foresters. Interviews were also made with private landowners, gamekeepers, game researcher, the County Administrative Board, the National Road Administration, pole and net retailers and Contractors. The target group for this work is the National Board of Forestry to be forwarded to persons interested in forestry with the ambition to spread knowledge about how to prevent damage on the forest by browsing animals. The deer populations are big in the south of Sweden and growing populations have increased the damage on plantations of broadleaves of the most species.

Professionell garantihantering : Ett arbete inom byggnadsbranschen

A business is always dependent on its customers. It is therefore important to ensurethat customers are satisfied with the product and the warranty included.The study was conducted in cooperation with the building contacting companySkanska Sweden. The aim is to use interviews to collect and process experiences in order to answer the question: How should the recovery process in the construction industry be performed to ensure a professional handling of warranty? The results have shaped my conclusions and I have turned them into a proposal that companies in the industry can benefit from. The study indicates that the industry is not geared for a five year warranty, which was introduced in 2004 and 2006.

Lean och värdeskapadnde sjukvården : En fallstudie

Now a day?s there is dramatic change from traditional to digital information processing in construction industry. This change can be visualized in the project concept stage where it now has accessibility to join all the data in one place. Location-based planning technique simplifies scheduling by visualizing the schedule efficiently and has many advantages such as might shortened the project period by about 10 - 20 % if the company uses location-based technology, reducing risks in many ways by maintaining production continuity and identify collisions between things etc. Vico Office software has been used for Location based planning technique and in this thesis.The purpose of this thesis work was to demonstrate how location -based planning technology change the scheduling stage in Peab, potentially reducing the project time.

Optimering av produktionstidsplan : Studie baserad på implementering av ny planeringsteknik i Peab Sverige AB

Now a day?s there is dramatic change from traditional to digital information processing in construction industry. This change can be visualized in the project concept stage where it now has accessibility to join all the data in one place. Location-based planning technique simplifies scheduling by visualizing the schedule efficiently and has many advantages such as might shortened the project period by about 10 - 20 % if the company uses location-based technology, reducing risks in many ways by maintaining production continuity and identify collisions between things etc. Vico Office software has been used for Location based planning technique and in this thesis.The purpose of this thesis work was to demonstrate how location -based planning technology change the scheduling stage in Peab, potentially reducing the project time.