Sökresultat:
11771 Uppsatser om Construction work - Sida 10 av 785
Identifiering av avgo?rande faktorer fo?r optimal intern bygglogistik : En fallstudie av tre byggarbetsplatser
Unlike the manufacturing industry, the construction industry is always in motion. Each new construction project brings new opportunities, and it requires a new plan, new organisation, and new suppliers. All construction projects are very different from each other and in terms of a logistical perspective, this is very weak as it makes it difficult to get a flow in the production and to make flawless routines. The way the external and internal logistics are managed, can effect the final product in the time taken to produce it, the quality of the product and the profit made from it. When internal logistics are handled poorly, it could result in materials not being at the right place at the right time, or information not going through to the right person.
Leveransproblem : Ett problem vid strukturerad produktion
When building large buildings, such as compartment buildings, there is a number of deliveries arriving on the construction site daily. In order to receive these deliveries without disturbing the rest of the work going on JM often books a fixed unloading time. When doing that they can be prepared when the delivery arrives. Making sure there is a suitable unloading area, someone to meet the delivery and when needed proper machines, such as a tractor or a crane, to help unload bigger deliveries. The person receiving the delivery is supposed to make an acceptance control where they check the delivered goods making sure nothing has been damaged in transport and that they have received what they were supposed to receive.
Utveckling av ett provtagningssystem för alkohol och aldehyder i fordonsemissioner.
A system for sampling of alcohol and aldehyde from diluted exhaust gases from vehicles powered by ethanol has been developed and tested. The major part of the work has been research of earlier work in the field and the construction of the sampling system.The part of the system constructed for the measurement of alcohol has been shown to work, however, more test should be performed. The part of the system constructed for the measurement of aldehyde was tested parallel to a commercially available system, based on the same principle of measurement, and has been shown to work well.Determination of the concentration of gaseous ethanol using a FID has shown the since earlier known fact that a FID is not able to measure a correct concentration of ethanol. Furthermore it has been shown that high concentrations of gaseous ethanol can not be kept in a bag more than a few minutes without a substantial decrease of the measured concentration..
Energiåtgång under tillverkning och produktion av byggnadskomponenter
This diploma work addresses the question of how much energy is spent whenmanufacturing the components of a building as well as of how much energy is used inthe production of a building. The object of the studies is BioCentrum at the SwedishUniversity of Agricultural Sciences in Ultuna just outside the city of Uppsala. The aimof the work was to investigate how much energy was consumed when manufacturingand production in relation to the management, how many years the production wasrepresented. It was also a study in how mature the construction industry is to answerhow much energy was consumed in manufacturing.In order to get these answers a question form was developed and sent to thesuppliers to BioCentrum. In this form they were to respond to the quantity suppliedto BioCentrum and the amount of energy was spent when manufacturing thecomponents.
BYGGBRANSCHENS EGENKONTROLLER - DERAS BETYDELSE UR ENERGISYNPUNKT
In order to accomplish that a construction is correctly built, it is critical to obtain a well functioning control mechanism throughout the project. The way to enable this is not by having an independent inspector constantly at your side. Today it is praxis to use check lists and have people responsible of quality to make sure that these are followed. This is where discretionary inspections play their part. These among others are documents needed to com-plete the check list.
Logistik i byggbranschen : Fo?r fo?rba?ttrad arbetsmiljo? och effektivitet
Logistics and supply chain management in the construction sector is an area with great potential for improvements. Today, a lot of the workers time is spent on non-value adding activities. Research has shown that waste is a large proportion of the total production cost in building projects today.The purpose of this report is to analyze problems concerning logistics in the construction sector. Two of Skanska?s construction projects in Uppsala have been analyzed to identify problems.
Lekens Betydelse : Barn och pedagogers tankar om styrd lek
How do we match our education with the needs of the construction line of business and the requirementsof the Swedish National Agency for education? Is there something that we have to change?In this study I have asked our former students about their opinion of our education and I have also asked them to give me their view on what a good teacher is like. I have been able to benefit a lot from their answers in my efforts to be that good teacher. This survey took place at Facebook.The answers showed that we carry on a piece of solid workmanship. But you can always improve, try harder.
ENERGIANVÄNDING PÅ BYGGARBETSPLATSER : Analys av införandet av energieffektiva byggetableringar
This report is the final step in the Bachelor of Science program in Building Construction Engineering, Department of Engineering Sciences, Uppsala University.The purpose of this study is to highlight the difficulties and possibilities that could involve the introduction of new energy efficient technologies and changing work around this technology. This study focuses on energy use at a construction site or other temporary workplace where so-called portacabins are in place to address the need for temporary facilities.The method for obtaining knowledge on the subject was mainly interviews with site managers working in Svevia AB's various activities. In conjunction with the interviews I visited construction sites and portacabins if it was possible.My most important suggestion to Svevia AB concerns a better organization in order to make poratacabins more efficient on energy and costs. The company should also evaluate and monitor the energy efficient portacabins that are in operation.Expected energy savings of new technology may not materialize if there are gaps in information, education, technical services and technical maintenance. It is very important to utilize the experiences of new technology.
Hur blir Peab ett mer attraktivt företag för kvinnliga ingenjörer?
The Swedish construction industry is dominated by men; however this is starting to change. The average age of Construction Engineers is high and approximately 40 per cent of the employees will retire by the year 2015. Currently, female engineers dominate the graduating classes of Swedish Universities but this is not reflected in the Swedish Construction industry.With so many female engineers available, why is this? Does it require a change in company culture and their condition of work to attract them? Is it the attitude towards women in the industry among the employees that has to be changed? Or is it a woman?s thoughts and prejudices of the industry that creates obstacles?The purpose of this final thesis is to describe how contracting firms in the construction industry can make themselves more attractive for female engineers. To reach the purpose, a study among salaried employees and craftsmen was conducted.
Kommunikations- besluts- och informationsflöden i byggprocessen
Construction projects are organized in different shapes and disturbances in the information flow in these processes can lead to problems, such as delays and/or a lower quality. Therefore, a well-functioning interaction between actors and a well thought out-communication at an early stage is of crucial importance. The main question is "How does the communication of decision and information flow in the building process and what barriers and opportunities can be observed?". This diploma work has been written with guidance from Bjerking AB and to answer this question, a collection of empirical data conducted via semi-structured interviews.
Konstruktionslösningar och deformationer i tre Östgötska medeltida sockenkyrkor
The purpose with this report is to illuminate the construction solutions and the deformations that could exist in medieval parish stone churches. But also to increase the writers understanding how activity forces effect the construction of the churches. With help from literature and a practical study, containing three churches the writers have collected the material that the conclusions and discussions are built upon in this report. The construction of the churches consists of three parts, the wall, the roof and the vault. The construction solutions are similar in the churches disregard of the roof, where the roof trusses are different.
Produktivitetsstudie Brobyggnad
The development of productivity in the construction industry has long been at a steady state compared to the manufacturing industry. Studies have shown that, amongst other things, waste on construction sites can reach up to one third of the total production cost. This has been observed from different aspects, and change is forthcoming.This thesis aims to provide a foundation for an increased productivity at production sites of building bridges. It is primarily based on a field study at Skanska, at a bridge construction site near Grängesberg. Via continuous interviews with the whole production crew, Construction workers and management, information on interference and possibilities of improvement at the work site has been documented.
Vindkraft för uppvärmning
This final thesis contains three major parts, which all have been time demanding:* Designing and construction of a small wind turbine.* Designing and construction of an electrical system.* Thesis with fundamental facts about wind, wind power and design.The thesis contains basic theory in wind power and the energy systems it can be combined with. Different types of wind turbines, which components they consists of and important issues to consider when designing is also mentioned. In the end of this report the technique of our wind turbine will be presented. In the end you can also read about our experiences during the time of designing and construction..
BIM Building Information Model : Hinder & Drivkraft
The construction industry is a costly business such in respect of capital for most construction defects which then require rework, tear down and rebuild again. This study is meaningful awareness of tools that can reduce this best through communication and information sharing between the parties. The construction industry is known as temporary projects organizations, where the construction project consists of several actors who have to communicate and share information between them to avoid mistakes later in the build time. These actors are bounded together thus for the duration of the project, then broken when the project has reached its end. The challenge here is for these actors to apply a tool that can help and simplify communications, information sharing, and perhaps the most important aspect is to create a routine for the association and the shattering of these actors. To implement such behavior using a tool such as BIM in the industry whose size perhaps is indescribable may be a very hard task. BIM (Building Information Model) could be seen as the solution to this problem because it acts as a portal where the actors involved must sign in and communicate, share information, and eventually create a behavior, a routine for this association and division of the actors following the end of the project. The technology could help the involved from the beginning of the project, already in the model stage, break down and prevent any construction barriers when the building has been placed in the works.
Möjliga tillämpningar av BIM vid miljöcertifieringsarbete
In the construction industry today there is a significant technological revolution goingon. New methods for automated processes and information management are developedcontinuously. Intense studies are currently taking place to ensure ways and means toembrace the new technology of BIM.At the present, environmental certification systems are considered cumbersome andchallenging. However, the increasing demands of sustainable development in the constructionindustry imply that the environmental certifications will not disappear. ThisMaster Thesis examines the possibilities to apply BIM technology within the field ofenvironmental certifications to streamline the processes.The applications that provide the best opportunities are:- To use BIM to be able to, during the design stage, dynamically evaluate the resultor score a certain building will achieve.- To avoid unnecessary work through collection of data for calculations directlyfrom a BIM-model.- To be able to automate certain time consuming calculations that are currentlyperformed manually.- To automatically examine the completed model to ensure that the demands arefulfilled.The possibilities to use BIM within these areas are however limited by the technologyitself.