Planering och val av metod i byggprojekt

This report describes the Construction process and the aspects that should be taken into consideration. It includes models of decision and how these can be used in practice. Planning of a building project is very important for a successful execution. This will be the foundation of problems that will occur during the production. In the planning process people with different positions, search for the best suitable building methods.

BIM-PROJEKTERING FÖRFÖRBÄTTRAD LOGISTIK

The construction industry depends on functioning logistics; if the logistics isn?tworking the construction site will risk to be interrupted due to material shortages orproblems with deliveries. Despite this, the construction industry is battling logisticproblems daily. This problem is very time consuming and costly for the companies.These theses are written for Peab Bostadsproduktion and investigate if it is possibleto focus on logistics earlier in the building planning process to reduce the problemsthat occur. Peab has partnerships with three companies that could be helpful for themin the work of reducing logistic problems.

PlusTak

Today´s roofing of dwelling houses is a very time consuming procedure, which includes a lot of different steps on the construction site. Not only does it cost a lot of money, but often do problems with rot and mold occur in the attics of houses today. The use of prefabricated modules has seen a great breakthrough in the field of construction of dwelling houses; at least when it comes to foundations and walls, where this type of approach makes the Construction process way more efficient. What no one previous has succeeded to develop is a corresponding system for roofs that meets the demands of a dwelling house. Accordingly the goal of PlusTak has been to come up with a proper module system for roofing of dwelling houses, where the roofing is completed to meet the demands of the Scandinavian market. During the project a lot of effort has been put into customer contacts and the usability of the product, as well in the manufacturing process as on the construction site. This development has gone hand in hand with several practical tests and tryouts.

ARBETSMILJÖ OCH OLYCKOR I BYGGBRANSCHEN

The construction industry accounted for 19 % of all work-related fatalities in Sweden between 2010 and 2013. The exam report has been done to find out what underlying causes there are to the high number of fatalities and to the occupational statistics of the construction industry. Moreover it has been reviewed what improvements can be done to reduce accidents and fatalities in the construction industry. The report consists of a survey of statistics, laws and regulations affecting the work environment and of literature concerning the subject. It has been conducted an interview and a questionnaire survey at the construction company Asplunds Bygg and an interview with an inspector from the Work Environment Authority.

Konstruktion av specialmaskin för orientering och positionering av nyckelämnen

The thesis in product development ? mechanical design includes 15 credits and was carried out during the spring of 2014 at Semcon in Eskilstuna. The task is to construct a special machine for positioning and orientation of a key blank found in six different shapes, the construction is a part of a larger machine for encoding the key blank where a pick- and-place device or robot pick up the key blank and deliver it further in the process. The entire construction is designed for ASSA OEM Gothenburg.In order to accomplish the project the first step was to analyze the existing solutions to similar problems on the market in a current situation analysis to create an understanding of the problem. This was followed by a flow analysis and a functional analysis to get a deeper understanding of the problem and structuring the machine's process flow and its features.

Erfarenhetsåterföring :  

This thesis has been done in collaboration with Peab Stockholm Building 3, which is a region within the Peab Sverige AB. The report is based on a survey and studies of Peab business management systems and production literature. For general information gathering has literature from well-known sources collected in libraries and through the Internet. It shows through the work that Peab has routines for experience feedback in the Construction process, but that these procedures work in a small scale and the practical work experience feedback does not work at all. This is also something the construction industry in general also perceived as problematic. The questions in the report are of a wide scale and concerns construction errors cost, how the employees perceive that the company takes advantage of the skills and the mental stress in production line. The goal is to find how Peab Stockholm Building 3 will work on the experience feedback to allow for better productivity. In conclusion, the report author tries to demonstrate what can lead to increased productivity and improved work experience..

Ett nytt växtsortiment - för inglasade miljöer :

A new project has developed at the Swedish University of Agricultural Sciences in Alnarp during the spring of 2006. The garden design students has, during the course Interior Garden Design designed and built an construction with a new range of plants for Swedish conservatories. The plants are mainly from the cool temperate areas, instead of the tropical which often are the most common in public spaces. This means, among other things, that the cost for warming is very low. The working process and the construction carried on as workshops in the conservatory at Trädgårdslaboratoriet in Alnarp. During a few weeks the hole construction is completed.

Strategisk analys av den svenska byggbranschen- En studie av JM, NCC, PEAB OCH SKANSKA

Background: The construction industry is Sweden?s single most important industry branch with a significant influence on Sweden?s wealth. The political restrictions that once controlled the industry are today almost gone. This combined with an unbalanced supply and demand situation on the Swedish constructions market, caused by urbanisation, has led to increased pressure on the Swedish construction companies who now are forced to find new methods in their struggle to contain or increase their competitive advantage. Purpose: The purpose of this thesis is to survey: which strategic variables are of great importance in today?s Swedish construction industry with focus on the four main actors, JM, NCC, PEAB and Skanska.

Kommunikation, uppföljning och tidsplanering inom detaljprojekteringen : Hur projekteringsprocessen kan effektiviseras med små medel

Producing a building is a long and complex process. It consists of several parts, from the feasibility study and design stage onto the construction and finally the management of the building. The design process is a critical part of the process where construction plans are made. The quality of the plans affect the production phase in great extent and faulty plans can pose a risk for extra costs for all parts in the process. The cost of producing dwellings has increased the last years and the detail design process is one of many phases where improvements can mean cost savings within the whole building process.This report aims to point at parts within the detail design process which could be more efficient, regarding communication, follow-up and time planning, and to give suggestions for improvements.

Industrialiserat byggande : Fältfabrikens användning, utveckling och framtid

The construction industry is currently receiving much criticism for inefficiency and slow development while demands for reduced built in moisture and efficiency increases. This report examines whether the use of field factories can meet these requirements and what factors that will be critical for future use of field factories. Industrialized construction with field factory is compared with traditional loose timber construction and industrial construction in the fields of execution, logistics and working environment. The aim of this report is to provide a basis for field factories current and future use and development. To achieve the aim of the report, people with experience in the use of the various methods was interviewed and literature studies in the various fields done.

Arbetsmiljö och säkerhet : På mindre företag inom byggindustrin

The accident frequency in the construction industry has shown a downward trend every year but this trend was broken 2010th. It is often lack of precautionary measures within work environment and safety that is the cause of accidents. The big construction companies understand the importance of precautionary measures within work environment and safety, as they spend a lot of money and time on that matter. By examining the work environment and the safety of the small construction companies you can see how they work. The report will presents how these small companies work with work environment and safety, and also how they follow the safety instructions that are available and how they make use of safety equipment.

Observationer av PPU i praktiken och teorin: Konsten att inte planera med luft

The construction industry is often criticized to be an industry of narrowness and slow of change. The traditional Construction process is considered to create gasps of inferior quality, delays and increase of disputes. Meanwhile, productivity is lower compared to other industries and the prices are increasing. In this debate, it has been assumed that the reported figures are monitoring a reflection of reality, but there might be an error in the statistics which suggests that the focus is at the wrong place. A study of the monitoring and the measurements of the results are to consider, instead of spending time and resources on issues and actions The Last Planner System is an executive planning tool which creates a predictable workflow and creating value throughout all the different stages.

?Vård i annans hem? - användning av arbetsmaterialet i Huddinge kommuns hemtjänst/boendestöd och personlig assistans

AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.

Shooting Target - Design : Product Development

The project has involved the development of two kinds of shooting targets in partnership with Marcus Bergkvist and Christopher Åkerblom. The project from the client was divided into two parts. This thesis discusses solutions for hands-on transport, development of tripods and an overall design. The second thesis affect resetting systems for the products.The work was done with a process and methodology based on design perspectives. This process has involved the search of relevant data which has provided the platform and opportunity for appropriate and purposeful design work.Concept development has been done using hand sketches and Photoshop, where a simple visualization of different concepts for the tripods has been produced.

BIM i planeringsarbetet : Effective planning by using BIM

AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.