Sökresultat:
5004 Uppsatser om Construction project - Sida 10 av 334
Planering, förutsättningar ocheffekter av implementering avsolceller i stadsutvecklingsprojekt.
Today, buildings utilize 40 % of the total energy consumption. New energyrestrictions and directives have entered the construction industry. Photovoltaic is asustainable, clean and quiet solution that integrates well in the urban environment buthave not yet reached a breakthrough on the Swedish market. The conditions for solarenergy production are often set in the early planning stages where they rarely arebeing prioritized.This master of engineering project focuses on identifying problems regardingimplementation of photovoltaic in city development projects and giving suggestions topossible improvements in the planning- and construction process. It also givesrecommendations on how the conditions for energy production can be optimized inthe early zoning stage.By conducting simulations with PVsystV5.21, on three ongoing city developmentprojects in Umeå, Malmö and Stockholm and by carry out and analyzing interviewswith city planners, constructors and architects, some conclusions have been made.Several improvements, both politically, with changes in the subsidization systemand/or instatement of a new law with feed-in tariffs, and within the solar- andconstruction industry itself, with better communication between different parts of theprocess as well as better use of experience, can be made.
Identifiering av avgo?rande faktorer fo?r optimal intern bygglogistik : En fallstudie av tre byggarbetsplatser
Unlike the manufacturing industry, the construction industry is always in motion. Each new construction project brings new opportunities, and it requires a new plan, new organisation, and new suppliers. All construction projects are very different from each other and in terms of a logistical perspective, this is very weak as it makes it difficult to get a flow in the production and to make flawless routines. The way the external and internal logistics are managed, can effect the final product in the time taken to produce it, the quality of the product and the profit made from it. When internal logistics are handled poorly, it could result in materials not being at the right place at the right time, or information not going through to the right person.
Konstruktion och design av hjul
The task given to us was to develop an industrial wheel with new thinking in terms of fresh design and construction, with the ability to brake. While the produced wheels of today only own the property of total braking, a wish was made to integrate the ability of directional locking.The time spent working with the project has been filled with multiple sketches of ideas and function analysis.Choices of material and ways of construction have been verified by calculations, tests and prototype building. The goal of this thesis has been to develop a unique caster with well thought-out design that would be adaptable to different areas of applications.The result was a hubless wheel with the ability of directional locking before total braking.A prototype of the wheel has been made to show the design and functions..
BIM på Trafikverket : Förslag till en utvidgad investeringsprocess
2013 a decision was made that all projects at the Swedish Transport Administration shoulduse BIM (Building Information Modeling) to some extent from 2015. BIM is an approachthat allows for streamlining of projects by the use of a 3D-model created in an early stage ofthe project. The 3D-model can carry information about the facility throughout its life cyclefrom planning to management. The use of a 3D-model can help the project to detect errors inearly stages of the project when it is easy and cheap to fix the error instead of finding theerror in the construction phase when it is costly and time consuming to fix it. 3D-models alsolead to improved communication both within the project groups and with the public.
L?gkonjukturens p?verkan inom byggf?retag
The purpose of this study was to gain a better understanding of how medium-sized construction companies adapt and how they choose to reorganize their operations in relation to the recession. The study has as its theoretical starting point theories about organizational learning, the impact of the economy on construction companies and strategies for dealing with recessions. The
method used to conduct the study was semi-structured interviews with representatives from 15 different construction companies. The results of the study show that they used several strategies to adapt and reorganize the business in accordance with the recession. Some construction companies had to make cost savings as a result of the recession.
Nödlösning i fickformat - stående kissande för kvinnor
The product "urinal funnel" for women has fascinated me for a long time. Not only because it solves a practical problem in a simple way, but also because it challenges our definitions of gender and behaviour. This report describes the process of making a new design for a funnel, taking material, ergonomics and construction in consideration. It also includes structuring a launching of the product in Sweden. It starts up with a large amount of information gathering, both by interviewing testgroup-perticipants, but also by researching and evaluating the range of existing funnels.
Logistik i byggbranschen : Fo?r fo?rba?ttrad arbetsmiljo? och effektivitet
Logistics and supply chain management in the construction sector is an area with great potential for improvements. Today, a lot of the workers time is spent on non-value adding activities. Research has shown that waste is a large proportion of the total production cost in building projects today.The purpose of this report is to analyze problems concerning logistics in the construction sector. Two of Skanska?s construction projects in Uppsala have been analyzed to identify problems.
Design av jolleindragare
This project has been about making a design suggestion for a boat accessory that adjuststhe distance between a sail-or motorboat and the dinghy, which is connected by a rope inthe stern. Today this is all done by hand and can lead to problems when it comes tostressful situations such as harbors and narrow passages.A company called Sailsafe came up with the idea and the construction, which they alsohave tested. I found them through an acquaintance at Dacat AB where I did an internshipin the fall of 2010.Using sketching as the primary tool I?ve worked in an almost-real design project with theaim to develop my skills and give the company a relevant design suggestion. Dacat thenhelped me with a 3d model in Alias, which was printed in 3d and painted in thepaintworkshop at school..
A foreign aid dilemma : a study of budget support versus project aid
Foreign aid is a very debated and controversial topic. The most recent studies have focused more on GDP growth and foreign aid correlation, however not much of the debate has focused on what kind of foreign aid should be given. The most common foreign aid is budget support, often a bilateral funds transfer between two countries. This kind of foreign aid can be both conditional and unconditional from the donors? perspective.
Effekter av nya PBL : En studie av processen från handläggning av bygglovsansökan till slutbesked
It has now passed two years since the new site- and construction law, PBL, went into force. It replaced the previous PBL applicable since 1987, and it involves relatively large changes in many different areas of the construction sector. The ambitions of the new law are for instance to simplify and clarify the legal text, increase efficiency in the permitting processes and improve the quality of construction. To achieve this, a variety of changes was made. Some of the most important are: inserted deadline in the processing of building applications, extended assessment of building applications, revised rules about controlplan and quality manager, a certificate is required to start and end the project, an additional meeting is inserted and the construction management of the municipalities will have to do a mandatory visit at the work scene.
Konstruktion av värmeelement
This report aims to describing the work behind the development of a masonry heater.The masonry heater is developed in collaboration with the company Transient Design KB that is a product development company located in Alingsås. The company sees a possibility to cover a market segment where modern technology and design are missing.The report presents those methods and approaches that have been used and gives an overview to how the project has been carried out. It describes how the ideas behind the final results have produced and how they have been developed during the project's time. In the report you can also read about the final concept with its choices of construction and materials.The report is completed with a presentation of a final concept and a ground for possible future production..
BYGGBRANSCHENS EGENKONTROLLER - DERAS BETYDELSE UR ENERGISYNPUNKT
In order to accomplish that a construction is correctly built, it is critical to obtain a well functioning control mechanism throughout the project. The way to enable this is not by having an independent inspector constantly at your side. Today it is praxis to use check lists and have people responsible of quality to make sure that these are followed. This is where discretionary inspections play their part. These among others are documents needed to com-plete the check list.
Slöserijakt i betongdjungeln : En tidseffektivisering av monteringsprocessen inom stål- och betongprefab
The different aspects of each individual construction project such as the general conditions, design and economic restrictions as well as many more factors mean it is difficult to standardize building processes or plan in detail based on past experiences. As a result operational efficiency is often reduced, and unnecessary waste is generated. To make an organization more efficient and therefore reduce waste production everybody involved needs to appreciate and understand the improvements that can increase the organization?s efficiency. To investigate these improvements a time study was performed on two different construction sites, both of which involved buildings being constructed of prefabricated steel and concrete elements.
Varför BIM?
Is the new technology always the best? This final project tries to determine if BIM is the melody of today, or if traditional 2D drawing is recommended. Perhaps a compromise is necessary, utilizing both methods.In order to answer this question, different views from the industry have been retrieved through reports, producers of software and users. The approach has consisted in building a 3D model of the school Råslättsskolan, house 01, along with interviews with people involved in the building process.When working in 2D it is hard to include the third dimension, mistakes are done and collisions happen that must be corrected, in most cases at the construction site. BIM is an incredible help since the model allows you to detect collisions and correct them.
Faveo Project Management Tool : Framtagning av verktyg för projektstyrning
There are several Project Management Softwares onthe market today. These tools are powerful andextensive to the degree they become too timeconsumingand complex and therefore often defeatits original purpose. This is the case especiallywhen the project manager is inexperienced and/orthe scope of the project is moderate.The purpose of this thesis arose from this context,there seems to be a gap between a home-made MSExcel spread sheet and the advanced softwaresavailable. The thesis and the product has beendeveloped in alliance with Faveo ProjectManagement with the shared goal to create a toolwhich is easy to use but still covers the essentialareas of project management theory. The tool willbe used internally by Faveo-employees as well asexternally together with Faveo?s clients in aneducational purpose.