Sök:

Sökresultat:

1409 Uppsatser om Capacity calculations - Sida 14 av 94

Förstudie för en vindkraftpark på Malmölandet i Norrköping : En undersökning av förutsättningarna för en vindkraftpark på ett sen tidigare planerat område

This is a feasibility study that examines various aspects of building a wind farm on Malmön in Norrköping. The feasibility study deals with interests of conflict, park design, electrical connections, production calculation, financial calculations and operating- and timetable.The report is divided into two distinct parts. First a theoretical part, which deals with conflicting interests, park design and electrical connections. Second a part with simulations dealing with production calculations, and financial calculations.Opposing interests are mapped so that problem areas can be found, and help put focus on the right places at a future environmental impact assessment (EIA). There are a number of areas where planners have to assess on an EIA, this thesis point on the most important areas.

Analys och beräkning av emissionsfaktorer för växthusgaser

An increased awareness about the global warming has created a demand for more information on how the climate is affected by different activities.This master thesis was initiated by Tricorona, a Swedish company that offers its customers analysis and calculation of their climate impact. Tricorona also supplies climate neutralisation with CERs, in accordance with the Kyoto protocol and controlled by the UN. This work demands updated emission factors for greenhouse gases. An emission factor gives information about the greenhouse gasintensity of a service or a product [kg CO2-eq./ functional unit].The purpose of this thesis is to examine how electricity, district heating, hotels, taxis, food and materials affect the climate and how emission factors for these areas can be calculated.This was done by reviewing and comparing different studies and by interviewing experts. The information was evaluated and recommendations on calculations and emission factors were made.The consumption of energy is the main source of greenhouse gas emissions for district heating, electricity, hotels, taxis and materials.

Tätning eller ventilering mot fukt på kalla vindsutrymmen

This study was done regarding whether sealing or ventilation is the best solution to prevent moisture on cold attics. The authors of this report addressed the problem with moisture in attics when they started their cooperation with Peab.The methods included interviews with people, database research, and calculations of a project in Akersberga north of Stockholm. The conclusion is based on interviews and other information as they are analyzed in relation to the house of reference. The focus of this report is on problems with moisture in the attics known as cold attics.The background of the problem with moisture is that today?s slabs are usually insulated to save energy and that the attics nearly gives the climate as the outdoor climate.

Limträstomme till hallbyggnader : Utformning och dimensionering av momentstyva ramhörn och 3D-modell framtagning

Industrial buildings are increasing all over Sweden. Farmers are building new modern facilities and the government chooses to build new halls to invest i youth sports. Glulam is the most common framework but there are limitations because of the transport. Therefore, there is a need to develop new solutions to increase the use of glulam.The maximum torque in the eaves was found in the frame with a roof pitch of 18 degrees and a wingspan of 25 meters. Using hand calculations according to Eurocode and comparison with the computer software StatCon, the maximum torque, shear force and utilization rate is calculated.

Försäljningsorganisationen Stjärnägg : en utvärdering ur ett leverantörs och ägarperspektiv

Stjärnägg is a sales organization operating on the Swedish eggmarket, owned by nine Swedish packing companies. Those nine packing companies are not just owners of the sales organization, but at the same time competitors since they compete in the market when they do not sell the eggs through Stjärnägg.The purpose of this thesis is to evaluate the sales organization from a supplier and owner perspective. To answer the purpose of this study, qualitative interviews have been conducted with the owners of the egg packers. This has been done in order to get as fair picture of the sales organization as possible. From the answers of the interviews, a compilation has been made to be able to give Stjärnägg concrete proposals of improvements in the organization.

Krafter på rörsystem vid transient flöde : En jämförelse mellan RELAP5 och Fluent

At Forsmarks Kraftgrupp AB (FKA) forces on pipe systems due to transient flow are frequently calculated as a step to verify their structural integrity. In nuclear industries these forces are often calculated with a one dimensional thermal-hydraulic analysis-code called RELAP5. When calculations regarding more complex geometries are needed, the three dimensional code Fluent is often used. This code is highly time consuming and requires large computational power.This projects aim is to compare calculations of pressure, flow and forces carried out by RELAP5 and Fluent for an arbitrary pipe section during transient flow conditions. This has been accomplished by constructing a simple geometry for which a transient flow is simulated in both programs.

Kan kombinationen av dehydrering, kronisk stress och/eller endotoxemi vara orsaken till träningsinducerad lungblödning?

Thoroughbred racehorses have suffered from exercise-induced haemorrhage for over 300 years. Almost all competing horses develop exercise-induced pulmonary haemorrhage (EIPH) at some point but most horses don?t suffer from reduced competing capacity due to the disease. The cause of the exercise-induced haemorrhage is unknown. The most believed theory today is that EIPH is induced by pulmonary stress failure caused by pressure over 100 mmHg in the pulmonary arteries during exercise.

Att ta vara på solens fulla uppvärmningskapacitet

The purpose of this bachelor´s report is to expand the knowledge about heat supply of a small house in Malmö. The heat supply will be provided from solar panels in combination to two accumulator tanks which will storage the up heated water and a pellet boiler.The technique used here is warmth storage in water over seasons, which will provide the total need of heating for the house. Accumulator tanks in combination to solar panels gets more and more common in Sweden but this far it´s unusual to use it for storage over seasons. This report will highlight many of the difficulties associated whit heat storage and give information about a system's possible design and function.The design of this system is decided early on. An accumulator tank is placed 2 meters down in the earth on the backside of the house.

Utvärdering av möjligheten att tillvarata energi ur processvatten : En undersökning gjort vid Olofsfors AB på uppdrag av UMIA AB.

The company Olofsfors AB manufactures drive belts for forest machinery, known as ECO-Tracks, and abrasion-resistant steel and cutting edges for graders, excavators and tractors, known as Bruxite and SharqEdges. Manufacturing these products requires the steel to be heated and molded, then submerged in water and hardened. The water used in the hardening of steel is pumped to the process from pits below the floor and then pumped back to the pit after it?s been used. Since the temperature of this water rises after being used to harden the steel the temperature of the pumping pit needs to be adjusted to maintain its setpoint of 21°C.

Förändring i färdigvarulager och utlastningen av foder efter införande av en ny produktmix : En fallstudie på Lantmännen Agroetanol

This Master thesis was written for Lantmännen Agroetanol in Norrköping concerning the layout of their finished goods inventory and unloading of feed after introducing a new product mix. Lantmännen Agroetanol has two production lines which produces feed. Both lines lead to six silos, used as inventory of finished goods. The feed from the two production lines differ in terms of quality, where as Lantmännen Agroetanol wants to separate their finished inventory in order to charge a higher price, by selling the better product as a premium. With two different feed products the yearly revenue is expected to increase which motivates a research about the current capabilities and necessary changes to be made in the factory.

Fosforavskiljning i reaktiva filter vid småskalig avloppsrening

An excessive input of nutrients to lakes and other water bodies has created a problem with eutrophication in Sweden. Untreated, or partially treated, domestic sewage is a major source for discharge of phosphorus (P), which is the nutrient most frequently responsible for eutrophication of most fresh waters and the Baltic Sea. The waste water can be cleaned by filter materials, which have a high P-retention ability and which after saturation may be used as fertilizers. Four potentially suitable filter materials were tested in batch- and column experiments in this study. In the batch experiments, the following materials were shaken with waste water in time series ranging from 5 seconds to 60 minutes: coarse (1-4 mm) and fine (0-2 mm) Polonite® (heated bedrock from Poland); Filtralite® (light expanded clay aggregates with limestone added before burning); water cooled blast furnace slag (BF-slag) and BF-slag mixed with 10% burned limestone.

Dynamisk modellering av kärnreaktor

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Solvärme med säsongslager i Lyckebo

The purpose of this thesis is to investigate and clarify the facts surrounding one of Vattenfall's district heating plants; The "solar field" and associated rock cavern in Lyckebo, Storvreta. The plant was built in the '80s by the formerly municipal utility,Uppsalakraftvärme AB, as an experimental building. A ground water filled cavern would serve as seasonal storage of solar heat from an adjacent solar field. Since both the energy company and the facility itself has undergone major changes over the past 30 years, there was a great need to gather facts in order to provide a picture of its current condition and potential for continued use. The thesis investigates the plant's history and problems with the rock cavern losses, and how the operation developed. It also presents the calculations regarding the possibilities of again supplementing the facility with solar energy - which is not the case today - as well as the economic conditions for it. Regarding a re-launch of solar energy, primarily a concentrating solar collector has been studied, as it has the advantages of an integrated control system.

Självgående renslastare till sockerbetor :

Our greatest interest within crop farming is to grow sugarbeets, that?s why we want to write about something new in this sector. We heard that a new concept had come to Sweden so we wanted to find out everything about this machine. This new technique was a self-propelled cleaning loader for sugarbeets. This machine is supposed to replace a loader and a cleaning machine when the sugarbeets is going to be loaded, cleaned and delivered to the sugerbeet factory. The cleaning loader picks up the sugarbeets with rollers from the pile, which is placed close to the road.

Vindkraft eller kärnkraft - En jämförelse

The scope of this project is to make a comparison of costs associated with wind and nuclear power in order to decide which one of these is the most suitable in the case of an increased demand for electricity. It is also investigated if there are other factors that can influence the choice of energy source.An average cost is calculated in terms of kronor per kilowatt-hour (SEK/kWh) using cost of investment, operation & maintenance and taxes & subsidies. Total investment cost is recalculated to production cost using the annuity method at three different interest rates (6%, 9% and 12%).The comparison is made between three cases of wind power and two cases of nuclear power. For wind power there are two ocean-based (300MW and 100MW installed capacity, respectively) and one land-based (60MW) wind farm. For nuclear power there is one EPR-reactor (1600MW) and one AP1000-reactor (1100MW).

<- Föregående sida 14 Nästa sida ->