Sök:

Sökresultat:

713 Uppsatser om Calculations - Sida 33 av 48

Externa kostnader för viltolyckor

The objective of this paper is to estimate monetary and non-monetary costs for the huntercaused by deer-vehicle collisions in Sweden. These costs include losses in hunting value as wellas time and money efforts related to the handling of wildlife casualties. The Calculations arebased on available statistics from 2004 on deer-vehicle collisions involving moose, deer, roedeerand wild boar and on telephone interviews with hunters involved in the tracking of injuredanimals. Altogether, the annual loss in hunting value for moose was assessed to approximately30 million SEK based on the 2004 accident statistics. For roe-deer and fallow deer, thecorresponding figure was approximately 56 million SEK and 1.2 million SEK, while wild boaraccounted for 1.3 million SEK, respectively.

Energikartläggning hos RostiGP i Gislaved

In today?s modern age, energy consumption has become a major issue, both from an environmental viewpoint and cost perspective. Because of a rapid technologic change and increased costs of production of electricity, the demand to develop effective methods for energy efficiency industries have grown.The electricity-intensive industries, such as plastic industry, the demand to reduce energy consumption has grown significantly over the past 10 years, which have led to the development of different methods to determine and locate energy-consuming parts in the industry. This also means being able to prioritize and organize activities in the industry.In this study the measurements of voltage, current, power and PF performance on injection molding machines (K-TEC 275 form Ferromatik Milacron in Germany) with a focus to locate, within a machine, various measures that could improve energy use in the plastics industry, in this case RostiGP in Gislaved. These measurements have been carried out with the help of a power quality clamp meter to carry out time logs of the machines for some time during normal word rate.

Visuellt typinstrument : en metrologisk studie

Visual Type Instrument - VTI, is a tool containing a typeface and a set of geometric Calculations that generates numerical data in spreadsheets. The data is determined from the typefaces visual dimensions and is used to calculate leading, type size, margins and format. The aim is to offer, for all of those working with typography and design, a practical way to manage text, image and format in relationship to visual size. Instead of using point measurements, VTI uses a new device called Edo. An Edo is the same as one twelfth of a millimetre.

En utvärdering av IT-investeringar på banker med fokus på IT-styrningsmetoder

This report discusses the IT archetypes "governance strategy" and how it could be linked to the IT benefits at the company. The study is based on IT investments that have taken place in ten banks operating in Sweden today, where the reality was modeled on the basis of a questionnaire survey and an additional interview. The aim was to examine whether it is possible to find any correlation between the governance in the banks and obtained benefits for an IT investments.While the competition is intensifying in most companies there is a greater demand for efficiency in IT. The need for IT solutions is greater than ever and the number of IT investments is increasing significantly in most workplaces today, especially on banks. But even if the investments are increasing in numbers it does not necessarily mean that all types of investments are effective and beneficial to the company.

Skapandet av ett byggnadsfysikaliskt detaljbibliotek åt byggnadskonstruktörer : fokus på fukt- och värmetillstånd  i köldbryggor

Det konstrueras i stor utsträckning bristfälliga detaljlösningar på byggnader i dagsläget. Den bärande stommen i konstruktionen prioriteras ofta medan det inte ägnas lika mycket fokus åt att tillgodose de byggnadsfysiska aspekterna. Anledningen till de bristfälliga detaljerna är även att den som utför arbetet saknar rätt kunskap och tid. För att skapa en förbättring behövs ett hjälpmedel!Kunskap och erfarenhet om hur bra detaljer skapas finns redan i företag, svårigheten är dock att sprida kunskapen till de som är i behov av den.Målet med denna rapport är att skapa en metodik som blir startskottet för ett omfattande arbete kring framtagandet av ett detaljbibliotek, vars syfte är att sprida byggnadsfysiska kunskaper inom företaget och inspirera konstruktörer till att konstruera bra detaljlösningar. Biblioteket ska innehålla byggnadsfysiskt utredda detaljlösningar som analyserats enligt den utarbetade metodiken.

Pilotmodeller till flygmekanisk simulator för JAS 39 Gripen

AbstractSAAB has for a long time used user controlled pilot models in ARES. ARES is a simulation tool used in the desktop environment for simulations and Calculations of the JAS 39 Gripen fighter and other aircraft. ARES stands for ?Aircraft Rigid body Engineering Simulation?. To work with these pilot models has been both time-consuming and inefficient.

Montageplattform : För inredning av två vertikala ventilationsschakt i Garpenbergs gruva

The company Bergteamet, Boliden, Sweden, is installing ventilation shafts of the Garpenberg mine. For such work a platform is needed which you can stand on and work from. The Shaft Reinforcement Team at Bergteamet performs the installation work and is the sponsor of the platform. The project described in this report is performed at the department MEC, Mining Equipment Construction, which has been given the task to design and construct the platform, customized for the current shaft. After this the platform is manufactured and inspected at the workshop at Bergteamet.The design work was carried out as follows:- After an initial meeting a requirement specification was worked out, describing the problem and previous experiences of platforms and requirements for the design and equipment.- A concept sketch was developed with consideration of surrounding factors.- A constructed 3D model was presented along with the choice of materials.

Fortsatt gran eller självföryngrad björk efter stormfällning? : en ekonomisk analys

The southern part of Sweden, Skåne, is frequently exposed to storms causing great damage to Norway spruce (Picea abies L. Karst.) stands. A storm during the winter 1999/2000 raised the attention of the problem. A lot of forest owners got large areas of spruce stands wind thrown during this storm. Can naturally regenerated birch (Betula sp.) be an alternative on these wind-exposed sites? This was the main question I was facing when discussilig the problems with Esben Möller Madsen, Söderåsens forest district. The aim of this master thesis was to present an economic analysis of Norway spruce versus birch.

Att ta vara på solens fulla uppvärmningskapacitet

The purpose of this bachelor´s report is to expand the knowledge about heat supply of a small house in Malmö. The heat supply will be provided from solar panels in combination to two accumulator tanks which will storage the up heated water and a pellet boiler.The technique used here is warmth storage in water over seasons, which will provide the total need of heating for the house. Accumulator tanks in combination to solar panels gets more and more common in Sweden but this far it´s unusual to use it for storage over seasons. This report will highlight many of the difficulties associated whit heat storage and give information about a system's possible design and function.The design of this system is decided early on. An accumulator tank is placed 2 meters down in the earth on the backside of the house.

Utvärdering av möjligheten att tillvarata energi ur processvatten : En undersökning gjort vid Olofsfors AB på uppdrag av UMIA AB.

The company Olofsfors AB manufactures drive belts for forest machinery, known as ECO-Tracks, and abrasion-resistant steel and cutting edges for graders, excavators and tractors, known as Bruxite and SharqEdges. Manufacturing these products requires the steel to be heated and molded, then submerged in water and hardened. The water used in the hardening of steel is pumped to the process from pits below the floor and then pumped back to the pit after it?s been used. Since the temperature of this water rises after being used to harden the steel the temperature of the pumping pit needs to be adjusted to maintain its setpoint of 21°C.

Dimensionering av bärverk av stål : En jämförelse mellan Eurokod och BKR

The design regulations of Boverket (BKR) have long been the mandatory standard for construction design in Sweden. However from the end of the year 2010, the BKR will be replaced by the European standard Eurocode (EC). The transition to EC has been delayed and it is not until the second of May 2011 that the use of EC will be mandatory. Because EC and BKR differ from each other it is highly interesting to investigate and explain these differences.The purpose of the thesis is to compare the two standards and investigate how they give different results or not for the dimensioning of structures of steel with associated loads. The current project HVC (Pets Science Center) in Uppsala is used as a model for the design of the steel structure used in this study.

Den globala uppvärmningen : vad kommer att hända med morgondagens värld?

Mankind faces a serious threat. Its activities, for example the burning of fossil fuels, have led to an enhancement of the greenhouse effect - something that has given rise to a global warming. The climate is becoming warmer, a change that has important effects on the nature as well as for humans and their society. Sea level rising, extreme temperatures are becoming more common, glaciers and other ice caps melt and storms becomes more intense when they appear. The main cause is the emission of greenhouse gases into the atmosphere - carbon dioxide in particular.

Hur byggnadsdetaljer ändrar fasadens uttryck

An energy study has been performed on two blocks in an area called Gävle Strand. The buildings are owned by a tenant-owner?s association called brf Carolina and were built by the company Skanska 2008. The builder as well as brf Carolina are pussled by the fact that electricity use is higher than expected while heating is less. Skanska is also very interested in finding out how much heat recovery from stale exhaust air through a geo-thermal heat pump is contributing to the general heating requirement and energy balance in four out of the ten buildings located on the properties.To find possible answers to the higher electricity use a literature survey on user behaviour was conducted.

Kv. Vattenspegeln södra Munksjön, Jönköping : Hur kan ett attraktivt bostadskvarter utformas vid södra Munksjön?

The purpose is to understand the planning process for residential buildings and toinvestigate the consequences of the choices made in the process. The project will alsoprovide broader knowledge in the design and development under the current law andpractice.The goal is to present a proposal on how a city near the site where water can bedesigned from a sustainable perspective. How can a residential neighborhood be anenvironmentally sound and sustainable region? New systems and techniques havebeen presented previously in terms of sustainable environments and these are intendedof being used in the project Quarter Water-mirror.The project has been implemented on the computer program ArchiCAD in whichdrawings and visualizations have been carried out. These drawings are included asannexes to the report.For information, Calculations and drawings, laws for physical planning and Swedishstandard have been followed.Residential buildings have been designed on a site, which is 2, 5 hectares.

Vindkraft eller kärnkraft - En jämförelse

The scope of this project is to make a comparison of costs associated with wind and nuclear power in order to decide which one of these is the most suitable in the case of an increased demand for electricity. It is also investigated if there are other factors that can influence the choice of energy source.An average cost is calculated in terms of kronor per kilowatt-hour (SEK/kWh) using cost of investment, operation & maintenance and taxes & subsidies. Total investment cost is recalculated to production cost using the annuity method at three different interest rates (6%, 9% and 12%).The comparison is made between three cases of wind power and two cases of nuclear power. For wind power there are two ocean-based (300MW and 100MW installed capacity, respectively) and one land-based (60MW) wind farm. For nuclear power there is one EPR-reactor (1600MW) and one AP1000-reactor (1100MW).

<- Föregående sida 33 Nästa sida ->