Sök:

Sökresultat:

3 Uppsatser om CODP - Sida 1 av 1

Kundorderstyrd tillverkning ? Påverkande faktorer, förutsättningar och problem : En övergripande studie om hur små och medelstora företag flyttar kundorderpunkten och går mot mer kundanpassning.

This study presents a holistic view of which factors small and medium-sized enterprises (SMEs) have to consider, in moving their customer order decoupling point (CODP) further from the customer, thereby becoming more customized. The study also investigate whether SMEs and larger enterprises differ in the strategic questions relating to what influences an enterprise to become more customized, which prerequisites are required and which problems enterprises should anticipate and prepare for. These questions are important, given that strategic change is challenging, and can take considerable time to accomplish; it therefore needs to be based on the right decisions. This study is motivated by the fact that the markets SMEs are selling to tend to become more and more complex and harder to anticipate. Increased globalisation and use of IT and ICT have lead to greater uncertainty in customer demand.

Analys av faktorer som påverkar interna leveransledtider : Dimensionering av lager

It is becoming increasingly important for companies to meet customer demands due to intense competition in today's global market, that forcing companies to improve their offerings and become better at managing their supply chain (Shen et al., 2006).  Long lead times can be reduced by using different methods and strategies shows various researches. Lead times occur in the planning, production, inventories and handling of products (Treville et al., 2003).The aim of the study is to develop a method to analyze the factors that affect the length of internal delivery lead time in manufacturing companies. The method also included suggestions for reducing delivery lead-time to internal customers.The main factors that influenced the length of the on delivery lead times has summarized to make a selection among the factors that can have the most significant impact. The selected elements will be used as a method to analyze how these areas affect a company?s length on internal delivery lead times.The study shows that the causes of the long delivery lead times was the location of the customer order point, uncertain forecasts, long material and production planning time, and long waits in the production and storage.The delivery lead time, according to this report?s suggested improvements reduced by centralizing CODP and makes more reliable forecasts.

CODP Co operative design process - from urban strategy to detail

This project investigates the cooperation between architect and engineer. The context of the investigation is the design of buildings for a sustainable society. The goal of the project is to further the development of the sustainable built society by increasing the knowledge of the interdisciplinary cooperation between these two fields. The focus is a close cooperation already from the start of a project. By involving both fields in the early design stages it is thought that the knowledge and skills of each field is better utilized.