Sök:

Sökresultat:

1973 Uppsatser om Building simulation - Sida 8 av 132

Go Down Arts Centre : Nairobi, Kenya

The Go Down Arts Centre is a proposal for a new building to an existing organisation in Nairobi, Kenya. The proposal relates to the scale of the city by making a statement on a future urban path, and by welcoming the city in to the building. The proposal houses both activities affiliated to Go Down, such as studios and rehersal rooms, as well as opportunities for the visitor to meet and interact with the culture produced at Go Down, both in formal and informal settings. The building is closed to its surroundings, apart from a grand entrance towards the urban path. There, the city passes through the building to an inner courtyard, where the communication to all the rooms and activities takes place.

Fejans vandrarhem ? En studie om isolering och uppvärmningsalternativ

During the last decennium climate issues have become more and more important. Many steps towards an adaption of efficient energy supply systems have been taken all around the world. These steps have been created to ensure the next generation?s energy demand. In EU and Sweden objectives have been set to ensure that the energy consumption decreases by 20% year 2020 and by 50% year 2050 compared with the energy consumption levels of year 1995.

Nyutveckling av bakdörrar vid Sapa Building System AB

Sapa är en av de största tillverkarna i världen av aluminiumprofiler. Sapa Building System AB är ett dotterbolag till Sapa group och är en av de största leverantörerna i Europa på byggsystem. Några av deras produkter är bakdörrarna RD 3010 och RD 3020 för lastbilar, släp och trailers som från början var ämnade som sidodörrar. Som bakdörrar är de överdimensionerade då sidodörrar hade högre hållfasthetskrav. I dagens läge väger och kostar de mer än nödvändigt där av önskar Sapa Building System AB en nyutveckling av bakdörrarna.Målet är att omkonstruera bakdörrarna RD 3010 och RD 3020 så att de blir lättare, smidigare och billigare genom att konstruera en ny kantskoning till Sapa Building System AB:s befintliga aluminiumlämprofiler.Arbetet har resulterat i att ritningsunderlag för nya profiler har tagits fram där man valt att limma ihop dörrarnas delar istället för att nita.

Klimatskärmens funktion : En jämförande analys av projekterade nybyggnationer i Östra Salabacke, ur ett energi- samt fuktperspektiv

The design of the building envelope affects the energy consumption of a building. As the energy requirements for new buildings are becoming more demanding, the performance of the building envelope must be improved. Energy efficiency and durability are important attributes to consider.This report includes investigations of the building envelope, moisture and passive solar energy. It is based on the analysis of two different buildings with different designs. These buildings stand as reference for two of the companies who are working on a new, climate smart, residential area in Uppsala, Sweden.Studies and analyses on energy consumption and moisture transportation were made.

Företagsstudie om värmeöverföring : Beskrivning av värmeflöden hos en lagerbyggnad

The study took place at a food corporation in Växjö, Sweden. It describes a building that contains four tanks in which glucose syrup is stored. The purpose of the study was to calculate the amount of heat that leaves the building and the amount of heat that is supplied by the installed heating equipment. Before the calculations could be implemented, all the systems that supply the building with heat had to be examined. With a small amount of information from earlier studies, the work to gather all the data necessary for the calculations began.

Lufttäta byggnader

The viscosity of air buildings is a hot topic within the construction performers, which the industry feel they have too little knowledge about. This study is mainly aimed against air density in apartment buildings and airflow measurement. The study consists of a theoretical reference, educational visit, interviews and a survey conducted among construction workers at Magistratshagen in Linkoping.Earlier requirement in terms of air leakage through the climate screen was removed and today there are only energy requirement for a dwelling in Boverkets Building Regulations. The difference between a passive and a typical air tight construction is that the passive house have a maximum requirement of 0.3 l /s m2 of air leakage through the building climate screen. The requirement imposed on passive houses is to minimize the supply of power and energy for heating the building.Air tight constructions have heavy demands on the performance and accuracy of everyone involved with the project. The client must specify their requirements and also be prepared to pay for any additional costs. The architect and building planners have to design the building with regard to air tightness. Finally, the construction workers are required to do a careful work in order to get all the connections in the building air tight.The study suggests that an air tight building is a closed system where no forced ventilation exists. There are no reasons not to build too tight as long as there is a functioning ventilation. In this study the authors ask themselves how an air tight building changes over time. No theoretical information has been found on these changes, but the respondents assume that air density decreases with time. The deterioration is mainly assumed to be caused by construction materials changes over time. The study shows that construction workers knowledge of air tight construction is mixed, which they themselves admit in the survey..

Prefabricerat trähusbyggande med moduler : För- och nackdelar samt förslag på vidareutveckling

The construction industry can contribute to a healthier sustainable community. A development that is going on right now is by using more prefabricated volume- and plan elements on the construction sites. Building with this method not only provides a benefit to the environment, but also reduces production rates by taking up to 80 percent less time to build. By building in this way it will be easier to recycle and keep all the material that otherwise would go to waste. Also by building inside a protected environment, the material retains its good quality.This report will take forward proposals on further development of prefabricated volume element of wood, by first presenting this construction methods advantages and disadvantages..

Rayleigh-Bénard konvektion.

AbstractConsider a ?uid being heated from below. The heating leads to an upward convectiveforce that is counteracted by the viscous forces of the ?uid. If the convectiveforce is large enough in comparison to the viscous forces the ?uid will be put in anunstable state.

Mer hyresrätter åt folket! En studie om Hallands hyresbostadsmarknad. : - Att skapa lönsamhet för hyresrätter

A variety of demands have to be considered in the design of a new opera house in Galärvarvet. All possible viewpoints are important to be aware of, as is the need for the new building to be a contrast to the already existing opera house in Stockholm. The restricted site also makes a multitude of demands on the building's design.By rationalizing the layout and structure and also by making the footprint smaller, the complex building of over 30 000 square meters can be fitted and blended into the existing physical context. Unlike the existing opera house in Stockholm, the new opera house shows the rationality and the advanced technology that lies behind the scenes and becomes the character of the entire building. Through the dynamic façade, the new opera can convey any character it so desires, just like scenes do through different settings.

Byggnadsminnesförklaring : ett långsiktig hållbart skydd?

There are currently 2160 buildings in Sweden that are protected by law with the designation as a cultural heritage building, which is the strongest protection that can be obtained for a building of cultural historic significance. The purpose of this thesis is to research how strong and sustainable the protection of such a designation is and how you can motivate a revocation. Furthermore, this thesis aims to give an overall insight into all cases where there has been a revocation.To achieve the protection of a designation as a cultural heritage building, the object has to be of outstanding interest on account of its cultural historic value. In the first part, this thesis gives a short historic background of the cultural heritage law and its terms, like outstanding interest and cultural historic value. The County Administrative Board's documents about revocation are the main source for this research.There have been 24 cases of revocation and the frequency of such cases has increased in the past ten years.

Tekniken bakom den digitala filmtekniken : Vilka tekniska faktorer ligger till grund för den digitala revolutionen inom den professionella kameratekniken?

This thesis of 15 hp has been implemented at Halmstad University, incollaboration with Saab Dynamics in Linköping. Saab Dynamics is a companyoperating in the defence industry where competition is tough. This necessitatesnew ways to increase efficiency in the company, which is the basis for this thesis.Saab Dynamics wants to introduce simulation driven design. Since SaabDynamics engineers have little experience of simulation, required a usermethodology with clear guidelines. Due to lack of time, they chose to assign thetask to students, which resulted in this thesis.The aim of the thesis is to develop a methodology in mechanical design, wherethe designer uses the FE analysis early in the design process to develop thestructures' mechanical properties.

Energiåtgång under tillverkning och produktion av byggnadskomponenter

This diploma work addresses the question of how much energy is spent whenmanufacturing the components of a building as well as of how much energy is used inthe production of a building. The object of the studies is BioCentrum at the SwedishUniversity of Agricultural Sciences in Ultuna just outside the city of Uppsala. The aimof the work was to investigate how much energy was consumed when manufacturingand production in relation to the management, how many years the production wasrepresented. It was also a study in how mature the construction industry is to answerhow much energy was consumed in manufacturing.In order to get these answers a question form was developed and sent to thesuppliers to BioCentrum. In this form they were to respond to the quantity suppliedto BioCentrum and the amount of energy was spent when manufacturing thecomponents.

Enstudie om lågtempererat värmesystem i vägg : -Fokus på inomhusklimatet och energianvändning

Today the human being see energy as a matter of course but the resources that is used for extract energy is today not enough for the world demand. Of all the energy that is used in Sweden today approximately 40 % goes to the building stock. This number will most likely increase if not necessary actions will be made on the already existing building stock since new houses constantly are built which will be added up on the already existing energy supply. This takes cause of action on the already existing building stocks, to fulfill the demands of the future use of energy that has been set by the authority. At the same time the thermal conditions cannot be influenced by the necessary changes that must be made.

Energi och klimatanalys O-huset på Campus i Halmstad

AbstractThe indoor environment affects the human performance. Noise pollution, poor lightning and coloring are some of the factors that affect our work performance. The human is also affected by the air change and temperature, these factors are in most buildings possible to adjust and through this make economic savings. To find out about the indoor environment in the O-building a questionnaire was handed out, measurements/surveys and an interview was also made. 108 questionnaires where handed out to employees and students.

Simulering av hydrauliska dämpare i borrslagverk

This master thesis consists of the creation of shock absorber models for percussive rock drills. A model of the rock was also developed. These models were connected to existing models of the rock drill to create a complete simulation of the rock drilling process.When the models had been created the rock model was evaluated by comparison with measured values from lab tests. The verified rock model was then used to evaluate the shock absorber models.Four new shock absorber concepts have been developed. Three of these have been modelled, while the fourth have only been sketched and described.The evaluation of the models showed the following:? Simulations of the single shock absorber don?t correlate to reality very well.

<- Föregående sida 8 Nästa sida ->