Sökresultat:
4842 Uppsatser om Building project - Sida 9 av 323
Foldback System
This project concentrates on musicians who work in a professional music studio.The task of this project was to design a new headphone system called Foldback system.The advantage of this system is that all involved in a music project could influence their ownlistening during the project. With a couple of adjustments should each and everyone get theirown individual listening from their headphone station.This report shows different methods, theories and results that came along in development ofFoldback system. The project has resulted in a finished product that will be in use atStudiomega..
Projektering av fårstall :
The purpose of this work was to see if it was possible to rebuild an old dairy house into a house fore sheep production. The goals fore the work was to see witch kind of production model was suitable, how the actual drawing would look like and witch kind of interior was needed.
The building was built in the beginning of 1900. It is located on the mountain Kinnekulle in Sweden. It was a big production fore its time and hade about 60 dairy cows. It was a lot of hard work because the floor was built by big stone blocks and it was very hard to rebuild when some more automatic solutions came fore handling all the manure.
The idea of remaking the building came when we rebuilt the roof fore 5 years ago.
Klätterladan -en rumsgestaltning för klättrare
I design a service building for the climbingcompany Klättertorpet.Klättertorpet is a small company that is situated outside Lysekil.Klättertorpet o!ers courses in climbing and campingsite."e new building will include kitchen, room for socialmeetings,gym, a small shop and safety lockers. "e starting point revolvesaround how to capture the companys values and philosophyin the design. "e purpose was to add value to the companythrough the design and for myself to get more experience ofworking with a client. During the project questions developedin to how to work with the hole lifecycle of the inertial in mindand how to make the place attractive to climbers. I worked withmodels, moodboards and sculptures to explore the form.
BIM - Förvaltarens Framtid
For nearly twenty years people have been talking about Product models, but given that the building industry is so conservative, it is hard to implement new working methods. Product models are these days known as Building Information Modeling, BIM. People often say they work with BIM but they often forget the most important part, the information. A 3D model should be linked with characteristics and information. Information that can be invaluable for the facility manager.We have a vision that in the best of worlds the facility manager would be able to "walk" into the model and see what kind of installations are inside the wall or in the roof.
BIM på Trafikverket : Förslag till en utvidgad investeringsprocess
2013 a decision was made that all projects at the Swedish Transport Administration shoulduse BIM (Building Information Modeling) to some extent from 2015. BIM is an approachthat allows for streamlining of projects by the use of a 3D-model created in an early stage ofthe project. The 3D-model can carry information about the facility throughout its life cyclefrom planning to management. The use of a 3D-model can help the project to detect errors inearly stages of the project when it is easy and cheap to fix the error instead of finding theerror in the construction phase when it is costly and time consuming to fix it. 3D-models alsolead to improved communication both within the project groups and with the public.
Byggnads- och investeringskostnader : Robotmjölkning eller konventionell mjölkning?
This project is based on my fathers farm which lays outside Löberöd, twenty kilometres south
of Eslöv in Skåne.
While my family for some time have thought about building a new milkingstable with
AMS(Automatic milking system) I decided to compare the AMS with a conventional
milkingstable. We are abit concerned about how many cows we should have in the new
stable. Because of that I calculated with two different number of cows.
I have compared three different types of milking stables:
One alternative is 180 cows milked in a double eigth hearing bone milking stable.
The second alternative is 128 cows milked with two DeLaval VMS-robots.
The third alternative is 171 cows milked with three DeLaval VMS-robots.
One salesman from DeLaval and one salesman from A-betong helped me to get marketprices
on the milkingrobots, building, ventilation and prices on all the concrete. In all the costs
labour is included.
The rest of the costs are calculated in a softwareprogram called K-data 03 which is a program
with predicted costs. The calulations from the program showed that the price in the milkingpit
system was 51 000 sek per cow.
Byggnadsminnesförklaring - skyddsbestämmelser, ersättning och överklagande
In this report listed buildings, according to the Swedish Heritage Conservation Act, have been studied with a focus on cases where economical compensation has been given to the owner of the building and cases where the listing of the building has been appealed by the owner. In order for a building to become listed it needs to be particularly valuable from a cultural and historical standpoint. The listed buildings are protected through a list of regulations that determines which parts of the building can or cannot be changed, what methods and materials should be used for changes and repairs, and how the building should be maintained. These regulations should as far as possible be formulated in agreement with the owner, but a building can become listed against the owners will. To decrease the damage this causes the owner he can in some cases have the right to economical compensation. There is also a possibility for the owner to appeal the listing of the building.
Skola i Annedal
This project concerns a new lower and mid level compulsory school in the currently developing area of Annedal, northwest of central Stockholm. According to the given program, the school should hold 500 pupils and 100 pre-school children. As an addition to the given program, my suggustion holds a sports hall and a public library.In my project, my ambition has been to investigate how to create an inspiring and exiting place for kids to inhabit and, at the same time, create an activated, central place in a developing suburb. The latter has resulted in the two program-related additions, which purposes is to extend the hours during which the area is activated and to create additional incitements for visiting the building. Both additions are chosen based on lack of service in the area. Architectually, I've been inspired by the medieval castle which has been used as an inspirational resource for the parts of the school holding classrooms.
Varför BIM?
Is the new technology always the best? This final project tries to determine if BIM is the melody of today, or if traditional 2D drawing is recommended. Perhaps a compromise is necessary, utilizing both methods.In order to answer this question, different views from the industry have been retrieved through reports, producers of software and users. The approach has consisted in building a 3D model of the school Råslättsskolan, house 01, along with interviews with people involved in the building process.When working in 2D it is hard to include the third dimension, mistakes are done and collisions happen that must be corrected, in most cases at the construction site. BIM is an incredible help since the model allows you to detect collisions and correct them.
Utvärdering av befintliga passivhus : En byggnadsfysikalisk bedömning och mätningar om temperatur, och fukt analys på ytterväggarna
Energy price are on the way up to a high level that will not diminish in the future make us to focus more on the sustainable development for a better solution of residential houses. Passive house or low energy housing are one of the solution to make residential more environment friendly, in same time it´s a financial security using less energy, and saving money. The last 10 years in Germany and all around Europe the concept of passive house been developed, and people aim to know more about these concept that leading the market more attractive for passive houses. A passive house is a well designed building highly insulated and air tight with mechanical ventilated system for the whole building envelope that minimizes the use of energy for heating [1].The housing company Mimer has chosen to invest in low energy consumption in every new housing project. These future plan projects are decided to use less than 75 kwh per square meter annually in purchased energy [2].This thesis is about new constructed passive houses, and focuses on the evaluations of the temperature, and moisture condition for attic, external walls and joist.
En studie i begrepp inom byggnadsv?rden: samsyn och efterlevnad
The theory that concepts that are interpreted subjectively in building care creates problems in how the
concepts are defined in practice within the current governing documents and guidelines for building
care.
This essay has studied concepts in the building maintenance literature to investigate whether there is
consensus in compliance practice within the building process. In the study, 9 concepts have been
investigated through conversational interviews and questionnaires answered by practitioners with
extensive experience in building care processes. In the survey, an attempt is made, to measure how big
or small the consensus is between practitioners who often need to collaborate within the building
maintenance process. The investigation shows that existence of the concepts in building maintenance
is very common in the theoretical literature examined but is almost completely absent in the craft area.
Since laws, regulations, principles, and guidelines have defined concepts to support the decisions in
the building maintenance process, it can be concluded that there is a lack of practice for compliance.
Energieffektivisering av modern tillbyggnad till äldre skola : fallstudie från Österbyskolan i Österbybruk
The Swedish government has introduced a goal to reduce the energy intensity by 20% to the year 2020. To reach this goal actions need to be taken throughout the energy sector which includes residential and commercial buildings. This thesis considers the possibility to reduce the energy usage in a building located close to Uppsala. The analyzed building is a combined office, cafeteria and entrance and was completed about half a year before this project started. Therefore the measures presented for a more energy efficient building are presented as measures for future constructions.Simulations have been made in VIP-Energy, a dynamic energy calculation program.
Ombyggnation av gymnasieskola i stockholmsförort : Omvandling av gymnasieskola från 70-talet till framtida skol- och fritidscentrum.
The aim of the report is to develop a new design proposal for an existingsenior high school building in Skärholmens Center, Stockholm. Theschoolhouse is a result of the extensive residential project during theperiod between the years 1965-75 in our large cities peripheral and holdsanonymousand "gray face" that has characterized many houses from thesame era. Over the years, the number of students steadily declined andthe reason lies partly in the school's physical environment which cancertainly be regarded as substandard. This despite the fact that it islocated right next to Sweden´s largest trading block. A thorough analysisof the school building and the ambient area has been made incombination with a continuous dialogue with students and staff at theschool.
Träkolslera - en experimentell studie av blandningsförfarandet
Uppsats för avläggande av filosofie kandidatexamen iKulturvård, Bygghantverk, 22,5 hp, 2015..
Projektledning i virtuella teams - Förtroende, gemensam förståelse och groupwares
Virtual teams are teams where team members don?t sit and work in the same place, they canwork in different countries, cities and buildings. It?s not the distance between team members that defines a virtual team, it's the extent to which the team is dependent on information technology to communicate and carry out a task. Virtual teams is becoming more common in organizations, to use virtual teams organizations can reduced time and travel costs and create a larger knowledgebase.A project manager for virtual teams faces many challenges, they have to build trust with and among team members they rarely or never meet, create a common understanding of project objectives and manage the challenges that culture and information technology creates.