Sökresultat:
4842 Uppsatser om Building project - Sida 59 av 323
Relining ur ett beställarperspektiv
This report is focusing upon relining from a client?s point of view. Potential buyers are given a presentation of the different methods available today together with a general briefing describing the process. An important part of this report are the interviews that took place with already established customers. Property owners, managers, pipe cleaners, and project managers whom all been in contact with relining have answered the questions given along with their own thoughts and have also given recommendations of other persons to talk to.
Utvärdering av energiberäkningsprogram : Att användas i tidigt planeringsstadium för byggnader
The regulations for energy consumption are consistently getting more and morestrict. This leads to a higher customer demand for energy analysis early in the buildingdesign process. Many building planners and architects use powerful modeling softwareto visualize their projects. These digital models contain sufficient information aboutthe building?s physical characteristics for reliable energy analysis.
Metoder för lastprioritering i fjärrvärmecentraler
A problem in the field of district heating is the oil burners needed to provide power when a peak load occurs. One possible way of reducing the needed amount of oil is to reduce the power demand for space heating in the district-heating substations when the need for district heating water exceeds a certain limit. This can be done by use of a locally working controller function.In this Thesis the options concerning load priority are evaluated. To evaluate the potential for using controller functions concerning peak load priority an experiment was brought out in a chosen district-heating substation. The impact on the indoor thermal comfort during a heat reduction was also taken into account.
Kulturvårdscentrum 1986-2001
Kulturvårdscentrum was a project that had great significance for local folklore societies in Bohuslän.Bohusläns museum was i charge of the project that lasted from 1987 until about 2001 when most ofthe original staff have retired. The staff was mainly recruited from a large shipyard, Uddevallavarvet,at it's closure due to recession. Financing was largely made by the government to help outthose unemployed who otherwise should have a hard time finding a new job. At start there was about25 employees who where trained for one year by staff from Swedish museums, conservation studios,and teachers the university. The education was aimed at serving local folklore societies, and dealingwith their special problems.
Prototyputveckling i SharePoint
This report is about intranets and SharePoint. It explains how user?s expectations can affect an implementation of an intranet and what companies want to get out of an intranet. It?s also about risks that may occur when an intranet is developed and how to avoid these problems.SharePoint is a collaborative platform and publishing system from Microsoft that assists developers in the implementation of an intranet.
Utfackningsvägg i fältfabrik : en studie av arbetsmiljö och enhetstider
Construction companies are frequently criticized for high prices and long construction time. At the same time, statistics shows that construction workers are on the sick-list for occupational injuries or casualties more than other groups at the labour market.Skanska built a block of flats with tenant-ownerships in Gävle. The construction consists of concrete walls with in-fill walls in the front. The purpose with this degree project is to perform a risk analysis in work environment with focus on repetitive strain injuries and control the time report for in-fill walls manufactured in a field factory. The result of this project will help to make more realistic cost predictions in the future.This degree project has been performed in cooperation with the construction company Skanska.
Energiåtervinning från gjuteriprocess till fastighet, undersökning för ökat utnyttjande av spillvärme
This diploma work on D-level is made in cooperation with Varnäsföretagen AB in Eskilstuna. The company performs contract manufactured aluminium goods. This work is a continuation on earlier diploma work in Varnäsföretagen AB. Even if the industry process consumes much energy for melting the aluminium goods, they consume a great amount of oil to warm up the building. The purpose of this work is to examine some places in the building and the process to see how much energy it is possible to recycles to the heating system and reduce the costs for heating.
Light Explosion : rekonstruktion av en akrylarmatur
This report presents thesis of Liisa Kokkonen in collaboration with Muovikilpi Oy.The project?s goal is to find a new construction for an existing lamp made of acrylic. Form and design retains and the manufacturing occurs at Muovikilpi Oy. The project contains the new construction and manufacturing of the lamp and also a proposition for a set with floor and wall lamp. The paper gives an outline of acrylic as material and how it reacts with light.
Efter Energiutmaningen : Vad hände med undervisningen i fysik?
The purpose of this thesis is to try to find out what effect subject oriented projects like Energiutmaningen has on the teachers, with a focus on teachers? physics education. What was the experience for the teachers who participated and what effects did the project have on them. Four teachers were interviewed through qualitative interviews. From the result it showed that the most experienced teachers, who have been teaching physics for many years, gained a new perspective of their teaching, through their participation a development showed in their education.
Flexible Snowboard System
The project, Flexible Snowboard System, has been carried out by the project group independently and is a module developed for snowboarders, ski rentals and ski schools. The problems of today?s solutions are that they cause the user an inconvenient standing position when riding the ski lift or skating the transportation slope, also mounting, adjustments and disassembling of the bindings are time consuming and brings undesired wear to the screws and screw holes. In addition any adjustments require that the user steps out of the bindings and have tools at hand. Flexible Snowboard System is a universal module which means that it can be assembled with all of today?s snowboards and bindings.
Kartläggning och analys av tjänsteprocessen i IKEA-varuhus ur kundens perspektiv
This thesis has been done in collaboration with Peab Stockholm Building 3, which is a region within the Peab Sverige AB. The report is based on a survey and studies of Peab business management systems and production literature. For general information gathering has literature from well-known sources collected in libraries and through the Internet. It shows through the work that Peab has routines for experience feedback in the construction process, but that these procedures work in a small scale and the practical work experience feedback does not work at all. This is also something the construction industry in general also perceived as problematic. The questions in the report are of a wide scale and concerns construction errors cost, how the employees perceive that the company takes advantage of the skills and the mental stress in production line. The goal is to find how Peab Stockholm Building 3 will work on the experience feedback to allow for better productivity. In conclusion, the report author tries to demonstrate what can lead to increased productivity and improved work experience..
Requirement Specification for Information Security to Health Systems, Case Study : IMIS
During 2001-2002 a prototype, IMIS (Integrated Mobile Information System) was developed at BTH (Blekinge University of Technology) to demonstrate how mobile IT-systems can be used in healthcare. The prototype was based on the activity theory of Engeström. An ongoing project started in spring 2003. The purpose of the project is further development of IMIS with special focus in the diabetes healthcare. Participants in the project are scientists and students at BTH, ALMI Företagspartner, Blekinge FoU-enhet, Barndiabetesförbundet Blekinge, Blekinge Diabetesförening, Vårdcentralen Ronneby and Vårdcentralen Sölvesborg.
Ämnena Bild och Musik ur ett historiskt perspektiv
This research project is about how the subjects` art and music has been described under the 20th century in the Swedish school until today. The purpose with this research project is to do a text analysis that describes these subjects now and the last century, to illustrate the differences between today and the last century. Hence the size of this subject I have chosen some random samples out of the 20th century until today. I started to take these random samples from the first lyric I found about these subjects, and continued with these random samples in other lyrics from the middle of the 20th century until the year 2006. I just took these random samples from what I had found because I did not found some lyrics from earlier period of the 20th century.
UML som stöd vid småskalig utveckling av ett inbyggt system
This project aims at investigating if the use of UML as a support to small-scale development ofan embedded system is relevant. The investigation is conducted by using UML during the initialphase of the development ofTelfafill, a filling machine by the company ?Telfafill AB?. The aimof the development of Telfafill is to separate the user interface from the control unit. In additionto this main objective, Telfafill AB would like possible changes to, and additions of,functionality of the filling machine to be investigated.Within the boundaries of this project, the development of Telfafill reached a full requirementspecification of the proposed system, and contact was made with potential external developers.No prototype construction had been started when the project ended.
Urban Building vid Hornsbruksgatan
Mitt mål var att skapa västra söders identitet och samlingsplats, vilken helt saknas idag. Utmaningen var också att transformera Hornsbruksgatan från en baksida till en tillgänglig plats. Högalidsparken förlängs ner till gatunivå - Hornsbruksgatan blir en blandning av park/ torg genom ett specifikt grönt plattsystem. Nya stråk och ramper binder ihop nuvarande gatu- och parknivån. Bebyggelsen är småskalig och nätt, ändå är programmet större än förslagit proram.