Sök:

Sökresultat:

1694 Uppsatser om Building permit - Sida 4 av 113

Att bygga ett bibliotek : En studie av funktion och rörelse i tre nyinrättade biblioteksbyggnader - Kungliga tekniska högskolans bibliotek, Sambiblioteket i Härnösand och Vitterhetsakademiens bibliotek

A large part of research about libraries and library buildings in Sweden has been focused on how the building looks not how it functions with the library. The aim with this master?s thesis is to study how a library building is functioning and how its users are experiencing it. This is studied in three libraries, Kungliga tekniska högskolans bibliotek, Sambiblioteket in Härnösand and Vitterhetsakademiens bibliotek. With the questions of how they were planed, what did the libraries want from the new building and which of these demands were realized.

Leveranslogistik på byggarbetsplatsen

Problem: How do delivery logistics work in practice at the building site? Where are the big problems? How to make building logistics more effective? Do the site management and the haulers agree about questions concerning both parties? What is possible to gain by using better logistics? Is it possible to gain time with better logistics and by that reducing the costs? Purpose and aim: The purpose is to discover if there are any disagreements between the site management and the haulers. If disagreements occur they will be examined and probable measures based on the problems will be suggested. Another intention is to bring key ratios concerning time spent for deliveries forward. One aim is to update a similar report made in 1972.

Bosnien en studie av OHR statsbyggande

This essay examines the international communitys intervention in Bosnia. The purpuse i to give the reader a deaper understanding of the problems appeared in re-building the bosnianstate. Office of the higher representive (OHR), was to become the koordinator of therecontruction of the institutions and governance. The theory used fore the examination isstate-building, whith an alingnment of state-building trough the international community.The second part of the essay examine the ideas of the High representive (HR) trough threedifferent dimensions. The idea-analysies search to present the core of ideas of OHR, nationalparties and the reconstuction of media.

Framtiden för gamla Habo ullspinneri

This report presents an investigation and a new design of Habo Ullspinneris old industrial premises. It is based on the owners visions and wishes, two questionnaires and also considering of the historical value.Habo Ullspinneri was founded in 1882 by Frans August Johansson and was moved to the location it has today, near Hökån in Habo, three years later. The electricity that the machines in the industry needed was extracted from the small river that is placed under the building. In 1960 there was a fire and the result became the end of the industrial activity that had taken place in the building.There is no steady activity in the building at the moment. It is nowadays temporarily used as an agriculture museum and as a store room.

BIM-projektering i praktiken

The use of CAD, within the building industry came strongly, during the 1980?s and the 1990?s. The development has since then rapidly progressed and the using of 3D-models has in addition increased. We are now at the edge of next step of evolution. BIM, Building Information Model(ing), is here.

Församlingshem, Bankeryd

This report presents a thesis project at the School of Engineering, Jo?nko?pingUniversity, where the task has been to develop a proposal for a parish communitycentre for the Swedish church?s parish community in Bankeryd.Background1 st of November in 2004 the parish in Bankeryd appointed a special commissionof inquiry called Framtidsgruppen (Future Group), to analyse the parishcommunity?s different activities during the past 5 years and analyse the futureactivities and needs for the upcoming 5-10 years. This analysis would underlie theneeds of building a new centre for the parish community.Implementation, results and conclusionThe main focal points which this report is concentrated on has been to develop abuilding that is well suited for the activities, well adjusted for disabled persons andthe building shall be appealing in an architectural point of view.Based on the information provided from the parish community, studies ofliterature, reference objects and discussions with the contact person at the parishcommunity and the instructor of this project, the programming has beendeveloped. The building?s programming has been the source for the continuedwork with floor plans and the building design..

Go Down Arts Centre : Nairobi, Kenya

The Go Down Arts Centre is a proposal for a new building to an existing organisation in Nairobi, Kenya. The proposal relates to the scale of the city by making a statement on a future urban path, and by welcoming the city in to the building. The proposal houses both activities affiliated to Go Down, such as studios and rehersal rooms, as well as opportunities for the visitor to meet and interact with the culture produced at Go Down, both in formal and informal settings. The building is closed to its surroundings, apart from a grand entrance towards the urban path. There, the city passes through the building to an inner courtyard, where the communication to all the rooms and activities takes place.

Nyutveckling av bakdörrar vid Sapa Building System AB

Sapa är en av de största tillverkarna i världen av aluminiumprofiler. Sapa Building System AB är ett dotterbolag till Sapa group och är en av de största leverantörerna i Europa på byggsystem. Några av deras produkter är bakdörrarna RD 3010 och RD 3020 för lastbilar, släp och trailers som från början var ämnade som sidodörrar. Som bakdörrar är de överdimensionerade då sidodörrar hade högre hållfasthetskrav. I dagens läge väger och kostar de mer än nödvändigt där av önskar Sapa Building System AB en nyutveckling av bakdörrarna.Målet är att omkonstruera bakdörrarna RD 3010 och RD 3020 så att de blir lättare, smidigare och billigare genom att konstruera en ny kantskoning till Sapa Building System AB:s befintliga aluminiumlämprofiler.Arbetet har resulterat i att ritningsunderlag för nya profiler har tagits fram där man valt att limma ihop dörrarnas delar istället för att nita.

Klimatskärmens funktion : En jämförande analys av projekterade nybyggnationer i Östra Salabacke, ur ett energi- samt fuktperspektiv

The design of the building envelope affects the energy consumption of a building. As the energy requirements for new buildings are becoming more demanding, the performance of the building envelope must be improved. Energy efficiency and durability are important attributes to consider.This report includes investigations of the building envelope, moisture and passive solar energy. It is based on the analysis of two different buildings with different designs. These buildings stand as reference for two of the companies who are working on a new, climate smart, residential area in Uppsala, Sweden.Studies and analyses on energy consumption and moisture transportation were made.

Företagsstudie om värmeöverföring : Beskrivning av värmeflöden hos en lagerbyggnad

The study took place at a food corporation in Växjö, Sweden. It describes a building that contains four tanks in which glucose syrup is stored. The purpose of the study was to calculate the amount of heat that leaves the building and the amount of heat that is supplied by the installed heating equipment. Before the calculations could be implemented, all the systems that supply the building with heat had to be examined. With a small amount of information from earlier studies, the work to gather all the data necessary for the calculations began.

Lufttäta byggnader

The viscosity of air buildings is a hot topic within the construction performers, which the industry feel they have too little knowledge about. This study is mainly aimed against air density in apartment buildings and airflow measurement. The study consists of a theoretical reference, educational visit, interviews and a survey conducted among construction workers at Magistratshagen in Linkoping.Earlier requirement in terms of air leakage through the climate screen was removed and today there are only energy requirement for a dwelling in Boverkets Building Regulations. The difference between a passive and a typical air tight construction is that the passive house have a maximum requirement of 0.3 l /s m2 of air leakage through the building climate screen. The requirement imposed on passive houses is to minimize the supply of power and energy for heating the building.Air tight constructions have heavy demands on the performance and accuracy of everyone involved with the project. The client must specify their requirements and also be prepared to pay for any additional costs. The architect and building planners have to design the building with regard to air tightness. Finally, the construction workers are required to do a careful work in order to get all the connections in the building air tight.The study suggests that an air tight building is a closed system where no forced ventilation exists. There are no reasons not to build too tight as long as there is a functioning ventilation. In this study the authors ask themselves how an air tight building changes over time. No theoretical information has been found on these changes, but the respondents assume that air density decreases with time. The deterioration is mainly assumed to be caused by construction materials changes over time. The study shows that construction workers knowledge of air tight construction is mixed, which they themselves admit in the survey..

Prefabricerat trähusbyggande med moduler : För- och nackdelar samt förslag på vidareutveckling

The construction industry can contribute to a healthier sustainable community. A development that is going on right now is by using more prefabricated volume- and plan elements on the construction sites. Building with this method not only provides a benefit to the environment, but also reduces production rates by taking up to 80 percent less time to build. By building in this way it will be easier to recycle and keep all the material that otherwise would go to waste. Also by building inside a protected environment, the material retains its good quality.This report will take forward proposals on further development of prefabricated volume element of wood, by first presenting this construction methods advantages and disadvantages..

Mer hyresrätter åt folket! En studie om Hallands hyresbostadsmarknad. : - Att skapa lönsamhet för hyresrätter

A variety of demands have to be considered in the design of a new opera house in Galärvarvet. All possible viewpoints are important to be aware of, as is the need for the new building to be a contrast to the already existing opera house in Stockholm. The restricted site also makes a multitude of demands on the building's design.By rationalizing the layout and structure and also by making the footprint smaller, the complex building of over 30 000 square meters can be fitted and blended into the existing physical context. Unlike the existing opera house in Stockholm, the new opera house shows the rationality and the advanced technology that lies behind the scenes and becomes the character of the entire building. Through the dynamic façade, the new opera can convey any character it so desires, just like scenes do through different settings.

Byggnadsminnesförklaring : ett långsiktig hållbart skydd?

There are currently 2160 buildings in Sweden that are protected by law with the designation as a cultural heritage building, which is the strongest protection that can be obtained for a building of cultural historic significance. The purpose of this thesis is to research how strong and sustainable the protection of such a designation is and how you can motivate a revocation. Furthermore, this thesis aims to give an overall insight into all cases where there has been a revocation.To achieve the protection of a designation as a cultural heritage building, the object has to be of outstanding interest on account of its cultural historic value. In the first part, this thesis gives a short historic background of the cultural heritage law and its terms, like outstanding interest and cultural historic value. The County Administrative Board's documents about revocation are the main source for this research.There have been 24 cases of revocation and the frequency of such cases has increased in the past ten years.

Traumahantering hos nyanlända flyktingbarn i skolan : Ett krispedagogiskt perspektiv

To this date there are 14 major armed conflicts, four of which are defined as war. Every day several people come to Sweden as asylum  seekers and refugees looking for a residence permit in Sweden. This paper is about the children who receive a residence permit in Sweden and attend Swedish schools. Many of these children have experienced trauma ? damage to the psyche after a traumatic experience.From two qualitative interviews of a principal and a counselor at a school in Järfälla municipality, and three teachers at the same school, I studied what trauma management at this school looks like.

<- Föregående sida 4 Nästa sida ->