Sök:

Sökresultat:

9839 Uppsatser om Building maintenance process - Sida 3 av 656

Miljöledning för underhållsteknik : Vilken miljökompetens behöver underhållspersonal?

The purpose with this article is to give examples how to remain and in a long run develop a higher interest in maintenance activities and knowledge. First reason is the changed age-distribution with more number of older employees among maintenance personnel staff and second reason is demand for education due the increasing demand in environmental responsibility.In spite of there is a lot of knowledge of maintenance in national organizations of interests it will not be used in a sufficient extent in many companies. This knowledge is an important base to use to re-built the missing or loosed skills in companies. The national organization UTEK is involved in European projects to validate knowledge of maintenance. Lost of or bad maintenance activities will always affect on the environment.Establish a network between companies is a good way to exchange information in their common business areas.

X-it :en studie om f.d. narkotikamissbrukares erfarenheter

The purpose of this study was to get a client perspective of the different ways to exit from a different role as a drugabuser, and furthermore, how to maintain a drugfree life.The questions of issue were:- What kind of social-psychological conceptions rules the process?- Which motive powers are essential to maintain drug-independence?- Are there any difficulties on the path to social adaptation?Our research was based on interviews with eight persons; five men and three women, from a treatment home in the south of Sweden. The method we used was semi-structured and with a thematic questionnaire. We chose this form due to the fact that we did not want to influence the interviews, as we wanted to know the persons opinions.The result of our study showed that the interviewed persons have some difficulties to adjust in the society and to find new friends especially the interviewed persons with maintenance treatment. Marginal problems as, for example, the lack of not having a work or a home can complicate a further development for the group with maintenance treatment.

Överklagande och dess roll inom bostadsbyggandet : En granskning av plan- och bygglovsprocessen

The aim of this diploma work was to obtain a review of the appeal process in Sweden under the Planning and Building Act and the possibilities of appeal in the planning and building permit process. The work was intended to identify potential problems surrounding the appeal process and possible efficiency measures. The goal was to form a report that provides a satisfactory overview of the appeal process in theory and practical application as well as provide relevant concrete proposals on how the appeal process can be streamlined.Background and facts surrounding the work were taken from different types of literature and through several interviews with representatives in government, industry and politicians.The main problems related to the appeal process are in the long processing times and the high number of appeals. There is a great interest to streamline the appeals process and the government is going to launch studies in which possible future actions will be investigated.It is possible to appeal for up to two instances before you need a so called ?leave to appeal? in order for your complaint to be passed on to the next instance.

Klassificering av processutrustning - en grund för riskbaserat underhåll

In this report a systematic working procedure for risk classification of processing equipment from a maintenance point of view is described. How this system has been worked out is also an important part of the report. The classification system is adapted for use in complex processing plants. Preemraff Göteborg has been subject for the underlying study and application of the system.The system aims to give a good overview of the maintenance related risks at the plant. Furthermore, the analysis result is a good motivation for the suggested maintenance activities and as motivation for extended or decreased maintenance resources in total.

Metodval i projekteringsfasen : Bostadshus Ljusbojen 1

This major project in Building Engineering has its focus on inquiring into what methods has been used in the planning process of the residential buildingLjusbojen 1. This project has been conducted in cooperation with Kadesjös Ingenjörsbyrå AB, an engineering contractor firm which also acts as the property developer. Initially several different general methods for planning residential buildings have been presented. After the methods from the process of building Ljusbojen 1 has been analyzed compared to the general methods presented in part 1. This shows what the determining factors are during the planning process; factors such as cost, quality, time management, know-how and environmental issues.

Ändrad användning av stationshus : fallet Ormaryds station ? ett stationshus med betydande kulturvärden

Acquiring a former station building can mean that the property owners must familiarize themselves with a lot of planning and building regulations. After the new Planning and Building Act code into force in 2011, the responsibility lie on the developer to ensure laws and regulations. Based on the regulatory framework that is available occurs sometimes balance issues, between care requirements and building codes. The station building in Ormaryd was acquired in 2009 by two individuals who intended to accommodate office and retail space in the building. In doing so a new local plan of the area was established, including regulations on how the building could be used. By including road safety and noise, the risk was not considered appropriate to use the station building for housing.

Underhållskostnader för tröskor :

Costs of maintenance on combines are a subject of interest thus it constitute a large investment and cost for the individual farmer. Therefore it is important to have up to date knowledge and the right facts to be able to do reliable calculations on one of the largest investments for a farmer. The aim of this study was to compare costs of maintenance on combine/threshingmachine with the computer program for advising environmental issues in agriculture, STANK. Interviews took place and data were collected by handing out questionnaires to 20 farmers. A similar study conducted by Neuman (2003) investigated costs of maintenance and compared these with STANK. The results of this study have also been compared and examined related to data from SLA - Skogs och Lantarbetsgivarförbundet. The result shows that 18 out of 20 combines were given a higher cost of maintenance when using STANK compared to the numbers in this study.

Jämförelse mellan gamla PBL och nya PBL : Med fokus på bygglovets överklagande och möjlighet att vinna laga kraft

This thesis provides a comparison of the old Planning and Building act (PBA) from 1987 with the new PBA, which entered into force in May 2011. The essay consists of a descriptive part that presents the regulation of both laws. The new PBA consists of several differences compared to previous regulation. This thesis will, however, primarily be centred around the regulation regarding building permit appeals and the possibility of building permit, to gain legal force.In the old PBL, there were no regulations that result in a building permit decision could be made effective. Instead, a building permit could, long after the decision had been made, be over-challenged.

Förbättring av Egenvärmehus : En fallstudie av ett flerbostadshus, Kv. Fyrtornet

Energy efficiency has become a very topical issue that has been discussed throughout the European Union for preventing negative environmental impacts that have been associated with the consumption of energy. In the residential sector have mainly municipalities set strict requirements for the reduction of energy consumption while the renewable energy has been asked. Different concepts of low-energy buildings have been developed to reduce the cost of operation and maintenance in existing buildings such as in new ones.This thesis has aimed to minimize the energy cost of a large building which has had low energy consumption features originally. Energy reviews has been initiated in order to be able for showing how the house electricity could be carried out even more efficiently.The work was initiated through a literature study to clearly increase the reliability on the energy subject. Different concepts of low-energy buildings have been treated in connection with its specifications, afterward those have been compared with the obtained results.

Driftkostnadsanalys i väginvesteringsprojekt

During its lifetime, a road goes through a number of different stages; pre-study,inquiry of the road, work plan, documenting stage, building stage and operatingstage. The operating stage is the one that takes the longest time and costs themost. Those have a tendency of becoming unnecessarily high because the projectengineers don?t always take the management and maintenance prerequisites intoconditions.To decrease the management and maintenance costs, the Swedish RoadAdministration SouthEast has been in need of a work procedure that makes theroaddesign engineers take the management and maintenance of the road intoconsideration. This shall be achieved by a checklist where the most commondesigns that lead to increased management- and maintenance costs are compiledand listed.Through interviews with project leaders in management, the most commonproblems have been identified, analyzed and summarized under the headlineswinter-road, vegetation, road equipment and road designs.To elucidate the problem from several points of view, interviews wereimplemented with project leaders in investment and roaddesign engineers.

Tillståndsbaserat underhåll till sjöss : Vad föranleder den begränsade användningen av tillståndsbaserat underhåll (CBM) till sjöss?

Today, maintenance is a big part of the daily life on board ships. It is also one of the bigger expenses a shipping company has and without any loss of quality tries to run as economically advantageous as possible. In the hunt for economical savings the shore-based industry has subsequently applied the use of condition based maintenance, CBM, were a component is maintained according to its actual state. This leads to a reduction of maintenance costs since no parts are unnecessarily replaced. However, within the maritime sector a periodical maintenance is still the most commonly used maintenance system.The purpose of this paper is to chart the factors that are the reason for the low implementation of CBM on board the Swedish merchant fleet's ships.

Att förebygga och undvika fuktskador i byggnader

Efforts to achieve a moisture proof construction process have proved to be considerably complicated, despite the knowledge and awareness that now exists within the moisture field. Materials, documents, templates and checklists are designed to be accessed but are not used anyway. This may be because such effort has not been prioritized and properly requirements have not existed from the commissioner of a building.This report illustrates how the commissioner of a building project can achieve a moisture proof building process by increasing knowledge, moisture proof planning, and implementation of security moisture routines. Proposals are given on how the commissioner of a building project can work to consistently bring a moisture proof building process in all stages. The difficulty with regular moisture proof efforts, the authors believe is mainly due to the following points:      Many different design solutions.      Lack of experience feedback.      Lack of communication.      Financial incentives.      Attitudes.The interviews in the report have conducted with the help of a qualitative analysis, while the survey has been done using a quantitative analytical method.

Continuing Airworthiness Management Exposition : For Priority Aero Maintenance

The economic crisis has affected the airline industry as much as it has affected all other industries in the world. The small airlines and maintenance organisations must find new opportunities and options in order to survive the harsh crisis. Priority Aero Maintenance is now an approved maintenance organisation performing maintenance on aircrafts, engines and components. The company sees economic gains in the future by becoming an approved organisation that follows the European Aviation Safety Agency guidelines (EASA) and meets the requirements outlined in the rules of Part-M.In order for the company to become an approved organization, responsible for continuing airworthiness of aircraft, a handbook should be presented to the local authority. This handbook describes the company?s responsibility for the continuing airworthiness in order for the authorities to get an insight into the company and its work.This thesis resulted in a draft of CAME (Continuing Airworthiness Management Exposition) and this draft has been approved by Priority Aero Maintenance.The CAME will in the future be used by the company as a basis for developing a more detailed manual to be presented to and approved by the Swedish Aviation Authority (Transportstyrelsen)..

Underhållskoncept : tillståndsbaserat underhåll på smörj- och hydrauloljesystem

AbstractThis report describes our ten week long thesis work which is the last task in our education in mechanical engineering at Linköpings University. The project has been performed at Siemens Industrial Turbomachinery AB?s service department. The company which is located in Finspång produces, sells and provides service for steam and gas turbines around the world.The purpose of this project is to help Siemens develop their maintenance programs for two of the auxiliary systems which are a part of the complete steam turbine system. These are lube and control oil systems.The project is restricted to two of Siemens maintenance products, No Stop Check (NSC) and the annual Safety Inspection (SI).

pm3-revision : En välgrundad metodutveckling av metod för revision av förvaltningsstyrning

In the field of maintenance management there are but a few models an organization can use. The one model that has risen to the status of being the de facto standard in Sweden is pm3(på maintenance management model). The aim of this study is to lay the groundwork for a new method of evaluate the use of pm3within organizations. Today there is no uniform way of performing such an evaluation, which is necessary in order to diagnose the performance of the systems maintenance organizations.In the process of creating our own method for performing this kind of pm3audit, we further developed the ideas from a study by Lagsten & Nordström (2013) that was performed at the county Region Skåne. The authors of that study had developed ideas about using method rationale as a basis of creating a method for pm3auditing.

<- Föregående sida 3 Nästa sida ->