Sökresultat:
2275 Uppsatser om Building integrated PV - Sida 5 av 152
Utvärdering och åtgärdsförslag av energianvändning i kontorsbyggnad
AbstractEmbla 5 is an office building which has done a large improvement. The clients of this building has made an order of WSP and the student Anders Kempe to calculate the use of energy for the building, and after that result proposing further measures which can decrease the energy use of Embla 5.The ground for this report is when calculation of the present energy use of the building is stated. To make that information of a number of parameters such as envelope, the heating system and ventilation has been located and set in to the simulation program IDA ICE which calculate the energy use.To improve the energy use further this project has been concentrated to change the system of ventilation. Today the ventilation system is of the kind CAV (constant air volume) and the air flow is dimensioned for after recommendations from BBR and Arbetsmiljöverket in the office spaces. Consider that Embla 5 is an office building where the people only staying for 8-10 hours/day so was the ide to see how much energy saving if the air flow is reduced the time people not being in the building.
Att bygga ett bibliotek : En studie av funktion och rörelse i tre nyinrättade biblioteksbyggnader - Kungliga tekniska högskolans bibliotek, Sambiblioteket i Härnösand och Vitterhetsakademiens bibliotek
A large part of research about libraries and library buildings in Sweden has been focused on how the building looks not how it functions with the library. The aim with this master?s thesis is to study how a library building is functioning and how its users are experiencing it. This is studied in three libraries, Kungliga tekniska högskolans bibliotek, Sambiblioteket in Härnösand and Vitterhetsakademiens bibliotek. With the questions of how they were planed, what did the libraries want from the new building and which of these demands were realized.
Leveranslogistik på byggarbetsplatsen
Problem: How do delivery logistics work in practice at the building site?
Where are the big problems? How to make building logistics more
effective? Do the site management and the haulers agree about
questions concerning both parties? What is possible to gain by
using better logistics? Is it possible to gain time with better
logistics and by that reducing the costs?
Purpose and aim: The purpose is to discover if there are any disagreements between
the site management and the haulers. If disagreements occur they
will be examined and probable measures based on the problems
will be suggested. Another intention is to bring key ratios
concerning time spent for deliveries forward. One aim is to update
a similar report made in 1972.
Bosnien en studie av OHR statsbyggande
This essay examines the international communitys intervention in Bosnia. The purpuse i to give the reader a deaper understanding of the problems appeared in re-building the bosnianstate. Office of the higher representive (OHR), was to become the koordinator of therecontruction of the institutions and governance. The theory used fore the examination isstate-building, whith an alingnment of state-building trough the international community.The second part of the essay examine the ideas of the High representive (HR) trough threedifferent dimensions. The idea-analysies search to present the core of ideas of OHR, nationalparties and the reconstuction of media.
Art in Healthcare A study of the Art in Diagnostic Center (DC) University Hospital in Malmö.
The role of Art in Healthcare and its requirements through a study of Diagnostic Center (DC), a Hospital with Art and Architecture integrated.Issues: Who selected Art for DC and on what foundations? How are Art and Architecture integrated, and what is the established knowledge of Art in Healthcare?Studies of reference material, theses, research articles and interviews. Hermeneutic and discourse analyses were used.Theorists: Barthes, Bourdieu, Foucault, Arnheim, Sjögren, Rasmussen.Results: A regional group selected local Art, mainly nonfigurative, and integrated it early in the architectural process. A stimulating non-traditional hospital environment with a modern design and two artists created work specifically for the environment.Art affects our Health and Caring Sciences is a scientific field that is studying how art affects patients and staff. It is relatively new but it is growing into a vast field of research, learning more about Art's effect on Health..
MENINGSFULLT SPELANDE I DIALOGSYSTEM : En jämförande studie
Syftet med denna studie har varit att söka finna ett samband mellan dialogsystem designade enligt designmönstret Gameplay Integrated Conversations och meningsfullt spelande. Två prototyper har skapats där den ena haft stöd för tidigare nämnda designmönster och den andra inte. Dessa testades på två grupper om fem personer som återgav sina upplevelser genom ett frågeformulär. Resultaten visade att gruppen som spelade prototypen med Gameplay Integrated Conversations inte upplevde de unika egenskaper som det medförde. Dessutom visade undersökningen att gruppen utan stöd för designmönstret upplevde mer meningsfullt spelande.
Framtiden för gamla Habo ullspinneri
This report presents an investigation and a new design of Habo Ullspinneris old industrial premises. It is based on the owners visions and wishes, two questionnaires and also considering of the historical value.Habo Ullspinneri was founded in 1882 by Frans August Johansson and was moved to the location it has today, near Hökån in Habo, three years later. The electricity that the machines in the industry needed was extracted from the small river that is placed under the building. In 1960 there was a fire and the result became the end of the industrial activity that had taken place in the building.There is no steady activity in the building at the moment. It is nowadays temporarily used as an agriculture museum and as a store room.
Församlingshem, Bankeryd
This report presents a thesis project at the School of Engineering, Jo?nko?pingUniversity, where the task has been to develop a proposal for a parish communitycentre for the Swedish church?s parish community in Bankeryd.Background1 st of November in 2004 the parish in Bankeryd appointed a special commissionof inquiry called Framtidsgruppen (Future Group), to analyse the parishcommunity?s different activities during the past 5 years and analyse the futureactivities and needs for the upcoming 5-10 years. This analysis would underlie theneeds of building a new centre for the parish community.Implementation, results and conclusionThe main focal points which this report is concentrated on has been to develop abuilding that is well suited for the activities, well adjusted for disabled persons andthe building shall be appealing in an architectural point of view.Based on the information provided from the parish community, studies ofliterature, reference objects and discussions with the contact person at the parishcommunity and the instructor of this project, the programming has beendeveloped. The building?s programming has been the source for the continuedwork with floor plans and the building design..
Go Down Arts Centre : Nairobi, Kenya
The Go Down Arts Centre is a proposal for a new building to an existing organisation in Nairobi, Kenya. The proposal relates to the scale of the city by making a statement on a future urban path, and by welcoming the city in to the building. The proposal houses both activities affiliated to Go Down, such as studios and rehersal rooms, as well as opportunities for the visitor to meet and interact with the culture produced at Go Down, both in formal and informal settings. The building is closed to its surroundings, apart from a grand entrance towards the urban path. There, the city passes through the building to an inner courtyard, where the communication to all the rooms and activities takes place.
Hur håller jag i 30 år? Vad krävs av mig som lärare?
AbstractThe future of ethanol is depending on good solutions for the production. ENA energy power plant produces electrical power and district heating by heating biofuel. By building an integrated bioenergy plant surplus steam could be used to produce ethanol as fuel to vehicle.This would mean that ethanol is produced renewable energy and the energy for the process derives from the surplus of power. ENA energy, MDH (the University of Mälardalen) and the energy authority has initiated a research project were different bioenergy combinations integrate with existing power plant. As a part of the project which size an integrated factory should be to gain the best efficiency for the plant was investigated. Consideration will be taken to the cost of the production in order to be competitive to the price of imported ethanol. Etanolens framtid vilar på bra lösningar för framställning. I ENA energi kraftverk i Enköping produceras el och fjärrvärme genom eldning av biobränsle. Genom att bygga ett integrerat bioenergikraftverk där skulle man kunna använda överskottsånga till att framställa etanol som fordonsbränsle.
Nyutveckling av bakdörrar vid Sapa Building System AB
Sapa är en av de största tillverkarna i världen av aluminiumprofiler. Sapa Building System AB är ett dotterbolag till Sapa group och är en av de största leverantörerna i Europa på byggsystem. Några av deras produkter är bakdörrarna RD 3010 och RD 3020 för lastbilar, släp och trailers som från början var ämnade som sidodörrar. Som bakdörrar är de överdimensionerade då sidodörrar hade högre hållfasthetskrav. I dagens läge väger och kostar de mer än nödvändigt där av önskar Sapa Building System AB en nyutveckling av bakdörrarna.Målet är att omkonstruera bakdörrarna RD 3010 och RD 3020 så att de blir lättare, smidigare och billigare genom att konstruera en ny kantskoning till Sapa Building System AB:s befintliga aluminiumlämprofiler.Arbetet har resulterat i att ritningsunderlag för nya profiler har tagits fram där man valt att limma ihop dörrarnas delar istället för att nita.
Klimatskärmens funktion : En jämförande analys av projekterade nybyggnationer i Östra Salabacke, ur ett energi- samt fuktperspektiv
The design of the building envelope affects the energy consumption of a building. As the energy requirements for new buildings are becoming more demanding, the performance of the building envelope must be improved. Energy efficiency and durability are important attributes to consider.This report includes investigations of the building envelope, moisture and passive solar energy. It is based on the analysis of two different buildings with different designs. These buildings stand as reference for two of the companies who are working on a new, climate smart, residential area in Uppsala, Sweden.Studies and analyses on energy consumption and moisture transportation were made.
Företagsstudie om värmeöverföring : Beskrivning av värmeflöden hos en lagerbyggnad
The study took place at a food corporation in Växjö, Sweden. It describes a building that contains four tanks in which glucose syrup is stored. The purpose of the study was to calculate the amount of heat that leaves the building and the amount of heat that is supplied by the installed heating equipment. Before the calculations could be implemented, all the systems that supply the building with heat had to be examined. With a small amount of information from earlier studies, the work to gather all the data necessary for the calculations began.
Lufttäta byggnader
The viscosity of air buildings is a hot topic within the construction performers, which the industry feel they have too little knowledge about. This study is mainly aimed against air density in apartment buildings and airflow measurement. The study consists of a theoretical reference, educational visit, interviews and a survey conducted among construction workers at Magistratshagen in Linkoping.Earlier requirement in terms of air leakage through the climate screen was removed and today there are only energy requirement for a dwelling in Boverkets Building Regulations. The difference between a passive and a typical air tight construction is that the passive house have a maximum requirement of 0.3 l /s m2 of air leakage through the building climate screen. The requirement imposed on passive houses is to minimize the supply of power and energy for heating the building.Air tight constructions have heavy demands on the performance and accuracy of everyone involved with the project. The client must specify their requirements and also be prepared to pay for any additional costs. The architect and building planners have to design the building with regard to air tightness. Finally, the construction workers are required to do a careful work in order to get all the connections in the building air tight.The study suggests that an air tight building is a closed system where no forced ventilation exists. There are no reasons not to build too tight as long as there is a functioning ventilation. In this study the authors ask themselves how an air tight building changes over time. No theoretical information has been found on these changes, but the respondents assume that air density decreases with time. The deterioration is mainly assumed to be caused by construction materials changes over time. The study shows that construction workers knowledge of air tight construction is mixed, which they themselves admit in the survey..
Prefabricerat trähusbyggande med moduler : För- och nackdelar samt förslag på vidareutveckling
The construction industry can contribute to a healthier sustainable community. A development that is going on right now is by using more prefabricated volume- and plan elements on the construction sites. Building with this method not only provides a benefit to the environment, but also reduces production rates by taking up to 80 percent less time to build. By building in this way it will be easier to recycle and keep all the material that otherwise would go to waste. Also by building inside a protected environment, the material retains its good quality.This report will take forward proposals on further development of prefabricated volume element of wood, by first presenting this construction methods advantages and disadvantages..