Sök:

Sökresultat:

18915 Uppsatser om Building information modelling - Sida 21 av 1261

IMPLEMENTERING AV ARBETSMILJÖLAGENS ÄNDRINGAR, GÄLLANDE FRÅN 090101, PÅ BYGGARBETSPLATSER

In the EU there are EC Directives that Member States of EU should follow. Sweden has undertaken to transpose EC Directives regarding the working environment to Swedish Provisions.  In 4 April 2006, the European Commission had some criticism against the Swedish implementation of the Construction Sites Directive. The Swedish Work Environment Authority has in response to this criticism reworked the Work Environment Act and related provision about building and civil engineering work. The changes came into force 1 January 2009.These changes have resulted in some working methods and even new responsibility subjects must be reviewed. The purpose of this exam project was to investigate if contractors and clients in the construction sector, had have time to update themselves on this front and adapt to these changes.

Enegiutredning Hotell Princess

This report will show the energy usage of Hotel Princess in Sandviken, Sweden. When the hotel changed owner an examination of the hotels heating, ventilation and sanitary systems were done. The report showed flaws in the ventilation system, and is why the new owner wanted a closer look at the energy use of the hotel. The original building was built in the 1930s and two major extensions have been built, one in the 1950s and the most recent in the 1980s. An assumption made is that the building parts were built to the restrictions during the time. Activities on the hotel include sleep over, conference, night club, massage and swimming in the hotels pool section.

Kontroll för ökad kvalitet - mallar för kontrollplan-PBL, egenkontroll samt riskanalys

There are problems with poor quality, poor scheduling and poor working climate in the Swedish construction industry. Many parts have been involved, trying to solve the problem.This spring a new planning and building-law becomes final. In this law, the requirements set on the controls are greater. Hopefully this will lead to fewer construction errors. The requirements set on the working environment have also increased, forcing consultants and contractors to focus on safe workplaces.For each project requiring a building permit, an inspection plan has to been drawn.

ENERGIEFFEKTIVISERING? Av lamellhus byggt på sextiotalet

TitleEnergy-efficiency ? of slab blocks built in the sixtiesAuthorsRichard Sandahl and Kim SöderbergEducationHalmstad University, Section for economy and technique Construction Engineering 180 ECTSSupervisorMargaretha Borgström, Universitylector construction physics, Halmstad UniversityContact person at HFABUlf Johansson Heating, sanitation and energy co-ordinatorReportExamination paper at the construction engineering program is performed in cooperation with HFAB (Halmstad real estate concern Inc.)AimThis examinations work is done in cooperation with HFAB and there project on the block around the street Maratonvägen. HFAB:s dwelling stock on this area are going through a bigger renovation and in relation to this they are looking on the possibilities to make this building more energy efficient. That is why this examination paper has as purpose to answer the question if it is possible to make slab blocks built in the sixties more energy efficient. This is done by calculate energy efficient measures on a chosen apartment block at Maratonvägen in Halmstad, in an energy and expense perspective.MethodThe examination paper is based on different methods, mainly calculation but also qualitative conversation studies, economic calculations and literature studies.

Ett aktivt beslut att renovera passivt : En ekonomisk jämförelse vid upprustning av miljonprogrammetsflerbostadshus

As a result of increased energy prices more and more energy-efficient homes are coveted. An energy-efficient alternative is passive houses, which is characterized by an extremely well insulated building envelope that recovers the heat without the use of radiators or under floor heating. But a passive house requires a higher investment cost than a conventional building project, since it will require more construction materials, training of construction workers, greater land area, and long construction period. But the lower operating cost expects to pay back the higher cost of investment. We therefore question how profitable a passive house is in relation to houses built according to modern conventional building techniques.The aim of our study is to investigate the viability of passive houses compared to convent­ional houses.

Transport av volymelement : Förutsättningar ur ett företags perspektiv

Building with volume element is relatively new and has started to increase more and more. The regulations that exist to regulate and determine how the transports of volume elements are to be conducted are diffuse and not very well adjusted to address the issues with transporting volume elements. Today there are a number of instances that a company has to turn to in order to get a somewhat different view, what regulations say and interpret it in order to know what applies and not applies regarding the transportation of volume elements. regulations. The rules that are in place make it tough for the volume element producing companies to develop and continue to be active on the market.

Prefabricerade Passivhus

European Union has made a new decision that all new built houses by 2020 shallbe near-zero energy houses. Boverket?s definition of near-zero energy housesintends buildings with good energy performance in which a proportion of theamount of energy that must be added to the building is made of renewable energy.Passive House is a set of requirements from FEBY designed to build energyefficient buildings. This is achieved by reducing loss of heat through the buildingenvelope and to take advantage of the passive heat from solar radiation,installation and heat sources like people living in the house.This project has been made with help of Anebyhus and one of their model houseshave been examined from the report?s issues, including Anebyhus?s energyperformance, requirements for the manufacturing and assembly, how theenvelope must be improved to fulfill the requirements for the Passive House andwhat energy calculation programs are available on the market.The report aims to provide solutions for energy efficient houses that are adaptedfor production of house building.Two visits to Anebyhus has been done to study their manufacture and assemblyof building elements.

Energieffektivisering i flerbostadshus : Undersökning av lönsamheten med energieffektivare ventilation

This thesis is based on a case study for the real estate manager Mimer in Västerås. Mimer provides a great deal of this city?s rental apartments. Many of their buildings have ventilation systems with a type of heat-recovery called ?heatpipe?.

En fallstudie om en fotbollsklubbs varumärke : ?Kall hjärna, varmt hjärta och rena händer?

Authors: Tobias Nilsson & Vedad LjeljakSwedish title: A case of a football club?s brand. En fallstudie om en fotbollsklubbs varumärke, ?Kall hjärna, varmt hjärta och rena händer?AbstractPurposeThe purpose of our study is to understand brand building of a Swedish professional football club. MethodThe method that has being used in the essay is a qualitative study where we have used semi constructed interviews to create a deeper understanding for brand building in a football club.

En yteffektiv och flexibel kontorsbyggnad : A space saving and flexible office building

Det kommunalägda fastighetsbolaget Videum AB som hyr ut och förvaltar lokaler på campus i Växjö ska uppföra en ny byggnad med totalytan 5000m2. För att underlätta i projekterandet åt Videum AB har en förfrågan av vilken form på byggnaden som är den mest vinstgivande för företaget undersökts i den här rapporten. I byggnaden ska det finnas kontorslokaler som Videum AB kan hyra ut till andra företag. Kravet är att planlösningen ska vara flexibel och kreativ. Uthyrningsprocenten ska vara högsta möjliga vilket undersöks med hjälp av utvalda nyckeltal.

Internationell Upphandling av Byggmaterial : En studie över materialimportens potentiella tillämpning hos medelstora och stora byggentreprenörer

High housing- and construction costs is a fact in Sweden today. Prices on building materials more rapidly than producer price index for industrial goods. Prices tend to rise during market boom but does not adapt during diminishing demand. The effects of fading demand can rather be deduced through discounts and quotations. During 1992-1998 when the Swedish construction sector found it self in severe crisis the prices of construction materials kept rising more rapidly than PPI for industrial merchandise.

Klätterladan -en rumsgestaltning för klättrare

I design a service building for the climbingcompany Klättertorpet.Klättertorpet is a small company that is situated outside Lysekil.Klättertorpet o!ers courses in climbing and campingsite."e new building will include kitchen, room for socialmeetings,gym, a small shop and safety lockers. "e starting point revolvesaround how to capture the companys values and philosophyin the design. "e purpose was to add value to the companythrough the design and for myself to get more experience ofworking with a client. During the project questions developedin to how to work with the hole lifecycle of the inertial in mindand how to make the place attractive to climbers. I worked withmodels, moodboards and sculptures to explore the form.

Servicekvalitet på Linköpings stadsbibliotek ? ur tre fokusgruppers perspektiv

The main purpose with this MA thesis is to examine how visually impaired, disabled and people with dyslexia define service quality at the public library of Linköping. The method that has been used is focus group interviews. A focus group consists of four to eight people who are joined together, without knowing each other before, to discuss a certain subject. The aim is to get a wide spread of answers. A secondary purpose is to examine how this method works.

Inventering av kulturhistoriskt intressanta byggnader och miljöer, västra Möckelnstranden, Karlskoga

The report is a building evaluation of an area south of Karlskoga`s urban area on the west side of the lake Möckeln, known as the western Möckelnstranden. The evaluation is carried out on the behalf of Karlskoga municipality.  The goal of the evaluation that is based on a mission statement is to create a basis for Karlskoga municipality for a detailed plan and exploitation of the area. The inventory contains suggestions on what should and should not be done with the environment and its buildings..

Relatinoship Building and Management - Aligning the Advertising Agency-Client Relationship

Title: Relationship building and management ? Aligning the Advertising Agency-Client Relationship Seminar date: 2006-01-13 Course: Bachelor thesis in Business Administration 10 Swedish credits. Authors: Ryan Eriksson, Louise Hagströmer, Peter Irinarchos. Advisors: Christer Kedström, Catharina Norén. Keywords: Relationship building and management, Transaction cost, Network theory, Resource based theory and Advertising agency.

<- Föregående sida 21 Nästa sida ->