Sökresultat:
3334 Uppsatser om Building industry - Sida 2 av 223
Luftläckage I Småhus : Hur de upptäcks och attityderna till dem
Air tightness in new buildings has been discussed for several decades. But the knowledge in the subject is low. With tougher requirements from the Swedish government about energy consumption for a new building required competences how these shall be met. It's not only the thick mess of insulation that are important, it's also the air tightness. This report is about air leakage in Swedish houses.
O?verla?mnandet inom byggarbetsmiljo?samordning : Riktlinjer och konsekvenser
The concept of building work environment co- ordinator is a relatively new concept that has its origin in the amendment to the Working Environment Act which came into force on 1 January 2009. The terms; building work environment co-ordinator appointed for planning and design and building work environment co-ordinator for the execution of building or civil engineering work ushered in the industry. Once these disciplines complement one another, you can achieve a smooth handover to ensure a good and healthy working environment.In this thesis, we study a company in Uppsala and their operations and handover by interviewing the relevant staff in question. The result shows that there are currently no present guidelines for how and when the handover should take place, it is up to each individual to provide themselves with the relevant information.If the handover of the work environment would occur to the extent it should it would lead to minimized proportions of unforeseen risks and events that may occur during the production phase, which ultimately leads to a better and healthier working environment..
BIM Building Information Model : Hinder & Drivkraft
The construction industry is a costly business such in respect of capital for most construction defects which then require rework, tear down and rebuild again. This study is meaningful awareness of tools that can reduce this best through communication and information sharing between the parties. The construction industry is known as temporary projects organizations, where the construction project consists of several actors who have to communicate and share information between them to avoid mistakes later in the build time. These actors are bounded together thus for the duration of the project, then broken when the project has reached its end. The challenge here is for these actors to apply a tool that can help and simplify communications, information sharing, and perhaps the most important aspect is to create a routine for the association and the shattering of these actors. To implement such behavior using a tool such as BIM in the industry whose size perhaps is indescribable may be a very hard task. BIM (Building Information Model) could be seen as the solution to this problem because it acts as a portal where the actors involved must sign in and communicate, share information, and eventually create a behavior, a routine for this association and division of the actors following the end of the project. The technology could help the involved from the beginning of the project, already in the model stage, break down and prevent any construction barriers when the building has been placed in the works.
Lufttäta byggnader
The viscosity of air buildings is a hot topic within the construction performers, which the industry feel they have too little knowledge about. This study is mainly aimed against air density in apartment buildings and airflow measurement. The study consists of a theoretical reference, educational visit, interviews and a survey conducted among construction workers at Magistratshagen in Linkoping.Earlier requirement in terms of air leakage through the climate screen was removed and today there are only energy requirement for a dwelling in Boverkets Building Regulations. The difference between a passive and a typical air tight construction is that the passive house have a maximum requirement of 0.3 l /s m2 of air leakage through the building climate screen. The requirement imposed on passive houses is to minimize the supply of power and energy for heating the building.Air tight constructions have heavy demands on the performance and accuracy of everyone involved with the project. The client must specify their requirements and also be prepared to pay for any additional costs. The architect and building planners have to design the building with regard to air tightness. Finally, the construction workers are required to do a careful work in order to get all the connections in the building air tight.The study suggests that an air tight building is a closed system where no forced ventilation exists. There are no reasons not to build too tight as long as there is a functioning ventilation. In this study the authors ask themselves how an air tight building changes over time. No theoretical information has been found on these changes, but the respondents assume that air density decreases with time. The deterioration is mainly assumed to be caused by construction materials changes over time. The study shows that construction workers knowledge of air tight construction is mixed, which they themselves admit in the survey..
Varumärkesbyggande inom småföretag: en fallstudie om hur småföretag skapar värde genom sitt företagsnamn
This thesis intended to examine how small enterprises within the retail industry work with brand building of their corporate name. More specifically it intended to examine how they do to choose corporate name and corporate logotype, and how they work to create a desired corporate image. A case-study was performed with three case-companies from different industries. The method was deductive as the empirics were brought in with starting-point in the theoretical frame of reference. The study showed that there are differences in the way small enterprises within the retail industry work with the brand-building of their corporate name.
Hallbyggnadsteknik - en effektivisering av småhusproduktion
Syftet med det här examensarbetet är att undersöka om det är möjligt att överföra hallbyggnadsteknik till produktion av småhus för att sänka produktionskostnaderna. Studien visar att hallbyggnadsteknik enkelt går att överföra till en villa. Dessutom blir det billigare att bygga klimatskalet med vårt byggsystem jämfört med ett traditionellt prefabricerat småhus. Genom detta system kan den totala byggkostnaden för villan i jämförelsen sänkas med 3-10 % beroende på vilket fasadmaterial som väljs..
?Vård i annans hem? - användning av arbetsmaterialet i Huddinge kommuns hemtjänst/boendestöd och personlig assistans
AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.
BIM i planeringsarbetet : Effective planning by using BIM
AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.
Miljöcertifierade byggnader Värde för investeraren
This bachelor thesis describes why investors should invest in environmentally certified buildings instead of non certified buildings. The report provides an overview of possible factors influencing an investor in the investment process of an environmentally certified building. The report explains why building companies find incentive to build green buildings and how a cash flow method can be adapted so it can be used in the valuation process of an environmentally certified building. Environmentally certified buildings are used as a strategy to reduce emissions that threaten the environment as well as a strategy to obtain market shares for the building companies. This report focuses on the economic advantages of an environmentally certified building.The construction- and real estate industry stands for approximately 40 percent of the energy consumption in the world.
Konkurrens inom hotellbranschen : En jämförande studie om uppfattad konkurrens utifrån två perspektiv
The hotel industry in Stockholm is characterized by intense competition, and within the next couple of years the construction of a number new hotels is planed. As the number of hotels in Stockholm increase, the competition will increase and the importance of having well functioning strategies will become vital. The purpose of this essay is to examine how two hotels within the hotel industry in Stockholm experience and handle the competition. The two hotels that are included in the study are Clarion Hotel Stockholm and Scandic Continental. The essay derives from models and theories that are related to marketing and competition.
Metodval i projekteringsfasen : Bostadshus Ljusbojen 1
This major project in Building Engineering has its focus on inquiring into what methods has been used in the planning process of the residential buildingLjusbojen 1. This project has been conducted in cooperation with Kadesjös Ingenjörsbyrå AB, an engineering contractor firm which also acts as the property developer. Initially several different general methods for planning residential buildings have been presented. After the methods from the process of building Ljusbojen 1 has been analyzed compared to the general methods presented in part 1. This shows what the determining factors are during the planning process; factors such as cost, quality, time management, know-how and environmental issues.
Ämnet Idrott och hälsa som grund för ett längre arbetsliv
The purpose of this study is to examine how well the teaching of physical education meets the needs of a future life in the building and construction industry. In order to answer the survey's purpose, we have carried interviews with teachers for the subject Physical education and health as well as with teachers for the Building- and construction program in order to through their experience gain understanding of common health problems in the profession, but also to gain a deeper understanding of the importance of the subject Physical education and health for this profession. We have reported and described previous research and then analyzed it during our processing of collected data material. The result of the interviews showed that the teachers as far as possible are trying to adjust the lessons to suit this practical program. They also indicate several aspects to consider in order to further customize the education for students in the Building- and construction program.
Utredning av grundavlopp på broar
AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire Building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.
Utvärdering av byggsektorns miljöbedömningssystem BASTA
AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire Building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.
Reglering av laborationsprocess med Matlab/Simulink
AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire Building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.