Sök:

Sökresultat:

7541 Uppsatser om Building design - Sida 9 av 503

Nyckelfaktorer för en designs slutskede

The final stage of a designers work is always a bit tricky. Design is an abstract phenomenon and no one can tell when a design is really finished. The design process that designers work within has been thoroughly studied but cannot be truly mapped with strict constraints which the designer can follow to succeed. Therefore, in this paper we take a look at the final stage in the design process. The main goal is to get more knowledge and highlight key factors about what designers face when they are about finish their design or what forces them to leave a project that can stay in development for eternity.

Kartläggning av energianvändning under byggfasen vid nyproduktion av flerbostadshus

The energy consumption in the sectors of residential and public buildings is 40 % of the total energy consumption in Sweden. The main part, 85 %, of the energy use in these sectors is for operation of the buildings. The rest is used in the building process. When energy-efficiency measures are taken the energy use during the operation time decreases and the fraction of energy consumption during the building time increases. This project is carried out in cooperation with JM AB and concerns the energy use during the building time of production of blocks of flats at the building site.The main part of the electricity that is used during the production of apartment buildings goes into the heating of portacabins and illumination of the building during the construction phase.

Höga hus med deformerbara fundament på pålar : Pålkrafters avvikelse visavi klassisk teori samt förskjutningar beroende av vindlast

When forces in foundation piles are calculated according to classic theory, thefoundation are assumed to be infinitely rigid which means that the foundation will notbend. High buildings need their whole width to be stable and use the ground floorwall as a foundation. But when, for example windows are needed in the ground floorwall, the stiffness of the foundation decreases which change the forces in the piles. Inthis report the difference of pile forces versus classic theory has been analyzed, and ifpile forces can be calculated as in classic theory. Further on, the effects of the wallmovement were analysed and how the buildings crack safety would be affected by themovement at the ground floor.

Återuppbyggnad av en kollapsad stat - En fallstudie av återuppbyggnaden av staten Afghanistan

The purpose of this thesis is to explore and analyze the processes and efforts involved in rebuilding the war-torn state of Afghanistan. The examined period span from the fall of the Taliban regime in 2001, to the elections in 2005. This period, commonly known as the Bonn-process, sets out the initial time for the reconstruction of the state.A theoretical framework, which considers the necessary mechanisms for successful state-building, will be used to analyze Afghanistan's re-building process. The mechanisms include the prerequisite of a stable security environment, emerging from a cease-fire, together with the development of a well-functioning economy, re-introduction of rule of law and rejuvenating civil society.The failure to establish a secure environment has had a devastating impact on all analyzed aspects of the re-building process. It is therefore crucial that the international society continuing to assists the Afghan government in its efforts to strengthen its capacity, in order to improve the security situation.

Camp Vamp - Att ljussätta en dansföreställning med skiftande förutsättningar

I work on a lighting design for a dance performance to be on tour. A lighting design adapted for three different conditions was made: - One comprehensive where I allow myself a great deal of creative freedom, adapted for the stages with major technical conditions. - One smaller version for stages with less equipment and with less time for preparation on site. - One design for very simple conditions. I also examine the specific differences between typical theatrical lighting design and typical dance lighting design, and the best way to prepare for the hands-on stage design phase..

Energikrav i upphandling av bygg- och anläggningsprojekt

The building and plant sectors represent a large part of Sweden?s energy use. Putting energy requirements in public procurement as a tool for reducing energy consumption in the building and plant sectors is therefor an opportunity that operators can take advantage of. The aim of this thesis was to map the energy requirements in procurement that operators in the public sector use today in building and plant projects. The analysis was made with respect to if the energy requirements corresponded to the parts with large energy use in building and plant projects and also in which way energy requirements in procurement are written in the contract.

Värdefull eller värdelös? - Kulturhistorisk värdering och färjestationen i Helsingborg

This essay in historical archaeology deals with cultural-historical values of buildings and inthis case the old train- and ferrystation in Helsingborg. The building has from the day of itsopening in 1898 been exposed to threats of demolition since its original purpose was as atemporary building with intension of being replaced within a couple of years. After havingseen two World Wars, eventhough Sweden never participated, and the ferrytraffic with its upsand downs the station was an important part of Helsingborg. All the ferrytraffic over the straitto Denmark was handeled by the old train- and ferrystation untill 1955, when a competativeferrycompany was built close to the old station. After a hundred years of service the oldstation was closed down when a new station was built i Helsingborg in 1991 with theintension of gathering all travelers in one building.

Miljöcertifierade byggnader Värde för investeraren

This bachelor thesis describes why investors should invest in environmentally certified buildings instead of non certified buildings. The report provides an overview of possible factors influencing an investor in the investment process of an environmentally certified building. The report explains why building companies find incentive to build green buildings and how a cash flow method can be adapted so it can be used in the valuation process of an environmentally certified building. Environmentally certified buildings are used as a strategy to reduce emissions that threaten the environment as well as a strategy to obtain market shares for the building companies. This report focuses on the economic advantages of an environmentally certified building.The construction- and real estate industry stands for approximately 40 percent of the energy consumption in the world.

En jämförelse mellan fyra olika energisystemlösningar : För ett hus byggt efter passivhusstandard i Karlstad

AbstractWork to develop the Eurocodes started in 1975 by the European Commission adopted a program to eliminate trade barriers within the construction area. The goal was to create common European design standards that would replace the member countries' own rules. Eurocodes will replace The National Board of Housing Building and Planning, National Rail, The National Road Administration and other agencies' calculation rules for the buildings structures. The transition to the use of Eurocodes looks like this:Eurocodes set to Swedish standards  between 2002 ? 2007They can be used parallel with national standards 2006 - 2009 The total transition is at the end of 2010/2011.Right now is going on a lot of work for replacement of the existing standards to Eurocodes.  The transition to the new calculations` standards, many construction companies and consulting firms facing a big changes and competitions.

Inverkan av försvagningar på bärförmåga för stålbalkar med långa spännvidder : En jämförelse mellan Eurokod och BKR

The purpose of this thesis is to investigate the degree of influence of holes in the web of steel beams with long spanson weakening of their bearing capacity. Making holes in the web of the beam generally reduces the bearing capacity of the beam. However, it might be necessary seen from both an architectural perspective as well as from a building services perspective by creating an opportunity for building installations.The objective of this thesis is to examine how much an I-beam can be weakened without sacrificing safety and functionality. The investigation has been done by using Finite Element Method through commercial software.The regulation for structural design of building structures in Sweden used to be specified in the document known as BKR. But this was replaced by the European norm Eurocode back in May 2011.

Utformning av riktlinjer för trafiksäkerhet i mindre stadscentrum : fallstudier i Bollnäs och Sandviken

Several cities have implemented various projects to improve traffic safety in city centers.During 1970s and 1980s the city centers changed as the suburbs grew and large shopping centers were located outside the center. At the same time, several projects were initiated with construction of pedestrian streets and restriction of traffic in the center. In year 1994,shared-used areas were introduced in Sweden and these areas are often used in center environments.In Sweden, municipalities are responsible for integrating security in public places and in comprehensive plans and detailed development plans. The National Board of Housing,Building and Planning is the authority for administrating planning issues and develop general guidance about planning. Traffic is one of their key issues, although today there are no concrete guidelines from the National Board of Housing, Building and Planningfor the design of traffic safety in city centers.Traffic safety in city centers affects many people because the city center is a public place.It is therefore important that there are current guidelines available that are helpful for changes and improvements in traffic safety in the city center.The purpose of this report is to formulate guidelines for planning city centers from a traffic safety perspective.

MIKROVÄRMEKRAFTVERK för hemmabruk

My questions at issue for this report has it´s beginning in the growing problems of thenegative effects of burning fossile fuels and the rapidly growing energyprices.1. Is it possible to design a micro scale powerplant?2. Is it economically interesting for a potential customer to by such a product?The aim with this report is therefor, with the help of design work and calculations, to answerthese questions and to create a platform for building a fully functional micro scale powerplant.The material used in the report is mostly product catalogs from various industries but alsostudy course littrature about steam engines.The result of the report is that it is fully possible to design a fully functional micro scalepower plant.

Synchronous Latency Insensitive Design in FPGA

A design methodology to mitigate timing problems due to long wire delays is proposed. The timing problems are taking care of at architecture level instead of layout level in this design method so that no change is needed when the whole design goes to backend design. Hence design iterations are avoided by using this design methodology. The proposed design method is based on STARI architecture, and a novel initialization mechanism is proposed in this paper. Low frequency global clock is used to synchronize the communication and PLLs are used to provide high frequency working clocks.

Lastkupan på stallet i Österäng - ett rekonstruktionsförfarande

Uppsats för avläggande av filosofie kandidatexamen i Kulturvård, Bygghantverk, 27 hp, 2010.

Förbättring av Egenvärmehus : En fallstudie av ett flerbostadshus, Kv. Fyrtornet

Energy efficiency has become a very topical issue that has been discussed throughout the European Union for preventing negative environmental impacts that have been associated with the consumption of energy. In the residential sector have mainly municipalities set strict requirements for the reduction of energy consumption while the renewable energy has been asked. Different concepts of low-energy buildings have been developed to reduce the cost of operation and maintenance in existing buildings such as in new ones.This thesis has aimed to minimize the energy cost of a large building which has had low energy consumption features originally. Energy reviews has been initiated in order to be able for showing how the house electricity could be carried out even more efficiently.The work was initiated through a literature study to clearly increase the reliability on the energy subject. Different concepts of low-energy buildings have been treated in connection with its specifications, afterward those have been compared with the obtained results.

<- Föregående sida 9 Nästa sida ->