Sök:

Sökresultat:

7541 Uppsatser om Building design - Sida 13 av 503

Jönsaplan blir Östra torget : ett torg för sin tid

This project is about Jönsaplan in Landskrona. Jönsaplan is situated at the center of Landskrona in a part called Södra centrum which the municipality is developing, mainly by building new residential buildings. Today, Jönsaplan is not a functioning square. This is due to a ferry terminal and its many fences that block the way for people. In this project, I have assumed that the ferry terminal will be moved somewhere else so that Jönsaplan can be a real square. By studying The Concise Townscape by Gordon Cullen and Byens uttrykksformer by Thomas Thiis - Evensen and three reference places, Daniaparken, Raoul Wallenbergs torg and Norr Mälarstrand, I came up with a number of guidelines for my design proposal for Jönsaplan.

Effektivisering av LCA med hjälp av BIM

This thesis concerns how Sweden relates to life cycle assessment (LCA) in the construction process. LCA means analyzing a products impact and the analysis includes the whole life span of the product. A building has a high complexity and the combination with its unique shape will make the LCA more comprehensive, unlike e.g. aluminum cans. Recently there has been a development of a working procedure in the construction industry.

Utfackningsväggar ur lufttäthets- och fuktsäkerhetsperspektiv : En jämförelse mellan platsbyggda och prefabriceradeutfackningsväggar

The swedish national board of housing, Building and Planning,recommends that all stakeholders in the construction industryperform a moisture control design to make sure that the buildingachieves good moisture resistance. Since June 1, 2006 there are nospecific requirements or quantitative values for air leakage.Although the swedish national board of housing does presentrequirement that the building envelope must be sealed so that theclient?s requirements for specific energy consumption and installedelectric power for heating purposes are met. Despite this, studiesfrom SP shows that few buildings meet the client?s requirements inspecific energy, which increases the risk of occurrence ofcondensation-related moisture damage.This study aims to evaluate curtain walls connections from airsecurity and moisture safety.

Ombyggnation av ett stall för bundna mjölkkor till boxsystem för rekryteringskvigor

To reconstruct a building is a long-term investment for farmers and it is important that people with different qualifications are involved at an early stage for making the system adapted to the animals as well the animal keeper. Therefore, ethologists who can contribute with their expertise are needed to design the system and get it to function well for the animals.A Swedish farmer who planned to rebuild her stall for tied dairy cattle to a loose-housing system for recruitment heifers for milk production asked me as an ethologist to find a system which can be fit to her existing tie-stall barn for 30 dairy cows, considering the animal needs in terms of movement, social interactions and play behaviors, and to theoretically compare the system with other systems with respect to the behaviors mentioned.The theoretical comparison between different systems was made through a scientific literature review.In agreement with the animal keeper I set out to fit a system with feeding cubicles, a system with cubicles and a system with deep straw bedding to the barn. After measurements were taken and preliminary drawings were outlined it was found that only the feeding cubicle system was possible to fit to the barn.The space provided will limit the animals to perform some playing behaviors. To decrease aggressive interactions between animals even thought a limiting area it is possible to provide partitions between resources animals compete around to prevent that more than one animal can get success to the resource at a particular place at one time. To increase the animal movement in the system the water trays were moved to the outer wall instead of kept in contact with the stalls.Although this report provides guidelines for rebuilding, other competences regarding building construction and a pre-test of the suggested building solution according to Swedish legislation are needed before the rebuilding can start.The results are directed mainly to the owner of the barn, but the literature review can be used by other cattle farmers and might bring increased understanding of the possible effects of different building solution on the animals..

Tillbyggnad, Nationalmuseum

The project description is to draw an extension or annex to the existing Nationalmuseum building from 1866.The annex is designed to complement Nationalmusems activities and contain internal and public functions. Artentering the building must not be crossed by public visitors. Art and staff must be able to seamlessly move betweenthe extension and the main building. The new building includes a public study room for scholars working withthe collection of art on paper, workshops, conservation studios, art spaces and warehouses. Additionally, theannex is designed to host a large number of office spaces.With the renovation of Nationalmuseum they intend to open up the today built in south atrium.

Retargeting : När annonsering bygger lojalitet

ABSTRACT Title:                                                Retargeting- When display advertising builds                 loyalty Authors:                                           Mikaela Johansson och Anna Svensson Kjällberg Advisor:                                           Thomas Helgesson Level:                                               Bachelor´s in thesis in Marketing, (15 Swedish       credits) Spring 2014. Keywords:                                        Retargeting, branding Question:                                                    In branding, how should small e-enterprises            work with retargeting? Purpose:                                           The purpose with this essay was to identify how    retargeting should be used in small e-enterprises                             when branding. This was done by comparing two e-enterprises practical use of retargeting, with two                           brand consultants and two retargeting consultants theoretical knowledge within each expertise.   Method:                                            A qualitative method with a deductive approach    has been used to answer the problem statement.  Theoretical framework:                              Earlier theories about retargeting, brand building    and recommended practices, related to marketing                       on the internet, were presented in the frame of       reference. Empirical framework:                                 Primary data were presented by two respondents   representing each area: Companies, Retargeting                        consultants and Brand consultants.Conclusion:                                                   The          marketing tool allows companies and      their               brands to get the chance to appear in                        wide area                      networks on the internet.    The tool is primary used                                                                for a sales                      purpose but the tool also has potential in brand-                                                                       building purposes.

Vägen till produktionsanpassade arbetsinstruktioner

The purpose of this thesis was to investigate the need of working instructions in Derome Träteknik ?s industrial house-building factories. Furthermore we wanted to determine an appropriate way for developing working instructions adapted to the conditions in a certain production environment. In the construction industry today prefabricated building elements are frequently used. With this come repetitive work tasks that need to be carefully planned.

Systemutvecklares erfarenhet av arbete med Design Patterns

Design Patterns introducerades på 1990-talet och användningen sades medföra en rad fördelar som skulle hjälpa systemutvecklare i deras arbete. Bland annat skulle Design Patterns underlätta för systemutvecklarna att kommunicera med varandra samt ge en bättre överblick över och förståelse för systemarkitektur genom en höjd abstraktionsnivå. Systemutvecklaren skulle även få en ökad förståelse för god design. Två kritiska artiklar fick oss att vilja beskriva hur systemutvecklare som aktivt arbetar med Design Patterns upplever att centrala fördelar uppfylls. Vi genomförde fyra fallstudier där vi intervjuade erfarna systemutvecklare och vår slutsats är att de upplever att fördelarna med Design Patterns uppfylls.

Triangeldrama: Samarbetet mellan bibliotekspersonal, högskolerepresentanter och arkitekter i planeringen av högskolebibliotek.

This study investigates the planning process of a university library building. The study s major concern is the cooperation of the main participants in this process: librarians, architects and representatives of university colleges and universities. First the authors present the readers with an overview of the litterature concerning this subject. Then follows a presentation of the three case studies. The authors have interviewed representatives of the three different occupational groups at three different library-building projects: Malmö University, Halmstad University College and the department of social- and behavioural studies at Lund University.

Särskild planering för elever med fallenhet för matematik? : Eller för alla elever?

A current issue today is to try to implement creative design as a way to solve wicked problems in scientific contexts such as HCI. Since the problems are wicked, they have no given solution which makes the traditional methods inadequate. In these cases, creative design can be an alternative. Creative design is not used in scientific contexts because it is viewed as something unaccountable.In this essay we argue that creative design not necessarily have to be unaccounted. We discuss various views of creative design and translate theory to a practical context.

Projektering av ett småhus med fördjupning i uppvärmningssystem

This report aims to examine the design of a passive house. The design addresses the selection ofmaterial, sizing and selection of both building services systems and building technical features suchas load-bearing framework and moisture control. Interior layout is designed for a family of twoadults and one child.A big part of the report is devoted to an in-depth comparison of three different wall constructions ofpassive house standard. The structures that have been compared are a lightweight timber structure, aheavier concrete structure and a sandwich wall of the brand Weber Leca. The report covers variousaspects such as air flow, wall thickness, the risks associated with the construction, U-value, thermalbridges, power consumption, price, and assembly costs.

Implementera BIM i produktionen : Vilka produktionsparamterar krävs i en BIM-modell för att produktionsledare ska kunna tillämpa BIM som verktyg till sina arbetsuppgifter?

Detta examensarbete syftar till att exemplifiera vilka informationsparametrar som är nödvändiga för att Building Information Management på ett bättre sätt ska kunna implementeras i produktionsfasen. För att uppnå detta mål har vi analyserat utvecklingen och nyttjandet av Building Information Management genom tre olika datainsamlingsmetoder; litteraturstudie, observationer och intervjuer.  I detta examensarbete har vi fördjupat oss i för- och nackdelar samt hur Skanska Sverige AB kan tillämpa Building Information Management som hjälpmedel i arbetsberedningar. Denna fördjupning har lett till att vi kan analysera vilka produktionsanpassade informationsparametrar som en produktionsledare behöver i sin tjänsteroll för att dra nytta av Building Information Management.Vi anser att användandet av en BIM-modell kompletterar produktionsledarens ledaregenskaper, vilket gör det lättare för denne att nå fram med informationen till yrkesarbetarna, då visualiseringen underlättar förståelsen inför aktiviteten. I denna rapport kan läsaren ta del av de slutsatser vi kommit fram till..

Passivhus : En jämförelse mellan olika byggnadstekniska lösningar för ytterväggar

This report aims to examine the design of a passive house. The design addresses the selection ofmaterial, sizing and selection of both building services systems and building technical features suchas load-bearing framework and moisture control. Interior layout is designed for a family of twoadults and one child.A big part of the report is devoted to an in-depth comparison of three different wall constructions ofpassive house standard. The structures that have been compared are a lightweight timber structure, aheavier concrete structure and a sandwich wall of the brand Weber Leca. The report covers variousaspects such as air flow, wall thickness, the risks associated with the construction, U-value, thermalbridges, power consumption, price, and assembly costs.

Stomme i småhus ! : - En teoretisk studie av olika bärande vägglösningar !

This report aims to examine the design of a passive house. The design addresses the selection ofmaterial, sizing and selection of both building services systems and building technical features suchas load-bearing framework and moisture control. Interior layout is designed for a family of twoadults and one child.A big part of the report is devoted to an in-depth comparison of three different wall constructions ofpassive house standard. The structures that have been compared are a lightweight timber structure, aheavier concrete structure and a sandwich wall of the brand Weber Leca. The report covers variousaspects such as air flow, wall thickness, the risks associated with the construction, U-value, thermalbridges, power consumption, price, and assembly costs.

Inneluftsventileradekryprumsgrunder : en utvärdering av två tillverkare

This Diploma work investigates internal air ventilated crawl-space in respect to construction and damp. The Diploma work assumes from a general description of crawl-space and general dump problems in ground construction. An internal air ventilated crawl-space is a construction where you take the ventilation air from the building and bring it down to the crawl-space and lets the air circulate before it passes through a retaining aggregate on the way out from the crawl-space. In this matter you get a worm space under the building and a lot less dump problems in form of · Ground damp · Build damp The ground dump reduces through draining around the building, different layer of gravel between the ground and the building and ventilation of the crawl- space. The build dump reduces through ventilation of the crawl-space as fast as possible.

<- Föregående sida 13 Nästa sida ->