Sök:

Sökresultat:

18902 Uppsatser om Building Information Modeling - Sida 10 av 1261

Förbättring av Egenvärmehus : En fallstudie av ett flerbostadshus, Kv. Fyrtornet

Energy efficiency has become a very topical issue that has been discussed throughout the European Union for preventing negative environmental impacts that have been associated with the consumption of energy. In the residential sector have mainly municipalities set strict requirements for the reduction of energy consumption while the renewable energy has been asked. Different concepts of low-energy buildings have been developed to reduce the cost of operation and maintenance in existing buildings such as in new ones.This thesis has aimed to minimize the energy cost of a large building which has had low energy consumption features originally. Energy reviews has been initiated in order to be able for showing how the house electricity could be carried out even more efficiently.The work was initiated through a literature study to clearly increase the reliability on the energy subject. Different concepts of low-energy buildings have been treated in connection with its specifications, afterward those have been compared with the obtained results.

Utvecklingsanalys av installationssystems montering vid industriellt träbyggande : Värme, vatten, ventilation, el och avlopp

The industrialized timber housing process is capable nowadays to build multi-storeyhouses since fairly new changes in the Swedish regulations where made after theadmission of the European Union in 1994.The industrialized process moves parts of the construction process into a highlyeffective factory where 3D-volumes of the building are prefabricated beforetransportation to the building site for assemble.The assembly process is relatively effective compared to the completion of thebuilding service system and this is therefore the main focus in this thesis. This thesisattends problems with completion of the building service system, and thereforedemarcates from other aspects, such as technical and economic aspects, of thebuilding service system.The degree of completion of the flats differs from completion of the connectivepassages, for example hallways, in a way that suggests a need for further investigation.This thesis includes analysis of the possibilities to increase the prefabricatedconnective passages, to the extent of containing building service systems.An increase of the prefabrication of the building service system has a greatdevelopment potential, even though some restraining factors need to be solvedbefore implementation.This thesis was made in collaboration with two of Sweden?s leading companies on themarket of multi-storey industrialized timber housing, Moelven ByggModul AB andLindbäcks Bygg AB..

Uttorkning av lera : Orsaker och följder

When building a house or similar the stress on the ground increases and deformations can arise. The deformations create a foundation that the building is not constructed for and damages on the building arise. The increased stress on the ground can be derived back to the building, but it is possible that the increased stress may well derive from different sources such as other buildings or trees.       The building is an older property, built in the late 19th century alternatively early 20th century, and is today used for rental housing and has suffered severe damages due to subsidence. The goal of the thesis is to find possible causes for these subsidences. The thesis was executed as a combination between literature- and casestudie. After careful studies it has been found that a probable cause for these subsidences is trees. Through field- and lab studies it has been found that the trees has effected the ground through there accumulation of water.

SANNINGENS ÖGONBLICK En komparativ undersökning av ett stadsbiblioteks och en byggvaruhandels arbete med att möta sina besökare

The purpose of this thesis is to discuss how a Swedish public library approaches their costumers. I will show how a library interacts with their costumers compared to a business, which has a different economic work frame, a building materials supplier. My aim is to pinpoint differences and explore new methods for the library in order to improve their service.The theoretical frame of the thesis is based on Richard Norman's notion the Moment of truth. The moment of truth is the moment when a business has to convince their customer that they offer both the product, proficiency and service that the customer needs. Service encounters at two organizations have been observed and their differences and similarities compared.

Arboga Mekaniska Verkstad : Förslag på saneringsåtgärder gällande gjuteriet och plåtverkstaden

The industrialization in Sweden has increased the large number of areas that have been contaminated with various types of pollution. One of those sites are the property Höjen 3:24 in Arboga where ?Arboga Mekaniska Verkstad? once been. The property wants to increase the use of the old former foundry building with the adjacent ?plate-workshop? and believe there are two options for the building: That the building either should be used as a warehouse/concert hall, or rebuilt into a cultural center. An environmental evaluation has shown that the levels of heavy metals are over the Swedish environmental protection agency guidelines of less sensitive land.

Förändringar av arbetssätt vid implementering av BIM : En kvalitativ studie av två traditionella projekteringars arbetssätt och tid- och resursplanering samt vilka förändringar som är nödvändiga vid implementering av BIM

I en rapport från 2005 framtagen av FoU-Väst i samverkan med Centrum för management i byggsektorn (CMB) konstateras att en betydande del av allt slöseri i byggsektorn är kopplat till fel och konsekvenserna av dessa, med andra ord felkostnader. Studien visar att felkostnader står för cirka 10 % av ett projekts produktionskostnad.   Byggsektorn står nu, år 2012, inför förändringar i sitt arbetssätt för att minska antalet fel, öka kvaliteten och effektiviteten. BIM ? Building Information Modeling, möjliggör ett smartare sätt att skapa, använda och förvalta information genom hela bygg- och förvaltningsprocessen. BIM ger möjligheten att anpassa informationen i varje delprocess och därigenom effektivisera arbetet.

Bedömning av loggbok : Bedömning av loggbok med en uppgiftsspecifik matris

The purpose of my independent work was to develop and test a task-specific assessment matrix to the students writing logs that occurs in connection with their APL (workplace-based learning). The matrix is based on upper secondary school subject plan House building from The Swedish National Agency for Education and the four courses House building process, House building 1, House building 2 and House building 3 - conversion. Due to the matrix structure, I used the example matrix of Malmö University. The task-specific assessment must both serve as a guide for students in the implementation of the log writing, and in the evaluation of the assessment work. Both students and teachers then get a common assessment tool for evaluation.

Ombyggnation till passivhus

Energy issues are constantly increasing attention in today's society. People's impact on Earth isentered in more contexts. Many discussions are about how the entire social structure needs to bestreamlined in order to achieve sustainability. The residential and service sector accounts for 39 % oftoday's total energy consumption in Sweden and the increasing electricity prices have made buyersmore interested in energy issues.There are many buildings in need of refurbishment today, including all the apartments that werebuilt in the 1970s to reduce the housing shortage at the time. 650 000 apartments of one millionapartments were built during the so-called the one million program and is currently in need ofrefurbishment.

Energihushållning och varsamhet för äldre byggnader : Chefsbostaden i Strömsholm, ett timmerhus från 1900-talets början

This report is the result of a degree project in building engineering, at an advanced level. The project evaluated a building from a technical and historical point of view, and focused on its energy consumption, particularly the energy used for heating. The building in question was a small apartment building in Strömsholm, Sweden. It was made in 1902, from vertical logs, a not so common form of the traditional log house. The goal of the project was to evaluate if the energy consumption could be reduced in accordance with building preservation regulations, that is without damaging any of the building?s cultural or historical values.The building was surveyed with the help of archive and literature studies, interviews and inspections.

Utredning av fastighetsel i ett äldre och ett ombyggt flerbostadshus i Gävle

The residential and service sector in Sweden accounts for approximately 38% of the total energy usage and Sweden has an aim to reduce the total energy use by 20% by 2020 compared to 2008, which means residential sector will have to improve energy efficiency. As part of that a law was instituted by the Swedish parliament that all properties must have an Energy Performance Certificate (EPC) to thereby give the property owners a greater insight into energy use in their buildings and propose recommendations for energy-efficiency measures. On the EPC, a value on the building's energy performance in terms of energy use in kWh / m2 per year is declared, of which electricity is a share of it. Instructions on what to include in the amount facility electricity for running the facilities is regulated by the authority for building, Boverket while SVEBY has made an interpretation of the regulations in their report "Brukarindata bostäder" where they have a table on what should be included in the amount and what not to include.This report is a study of two similar apartment buildings, where one of the buildings recently underwent renovation, to see if the declared amount of energy for electricity, in the EPC, is consistent with the measured value, and whether there has been any reduction in facility electricity in the renovated building after the renovation.The result shows that the measured value of the building electricity was 2.6 kWh / m2 per year, 28,8 %, lower than the declared value in the building that have not undergone a renovation. Calculation of values from previous years (2011) by the same percentage of facility electricity as in the results of the measurements, 56.7%, it becomes clear that the declared value for facility electricity in the EPC of the renovated building do not correspond with reality and that there has been an increase in use of facility electricity after the renovation..

Cykelgatan

Mitt arbete innefattar en "Urban building" med bostadsrätter och kontor där utgångspunkten har varit cykeln då jag ansett den vara det mest stadsmässiga elementet. Placeringen för byggnaden är Hornsbruksgatan på Södermalm där det med projektet blir till 130 nya bostäder och 1200 kvm kontor som är väl anpassade för cykling såväl som cyklister..

Byggnationsskillnader i Sverige, Finland och Tyskland

This paper is written as an examination paper at the University of Jönköping. The subject is chosen by Peab Sweden in Jönköping with whom further cooperation has been hold. The aim is to compare building methods and building materials in Sweden, Finland and Germany for further inspiration for Peab?s own market.BackgroundThe development of the construction industry develops new materials and methods to the market which has been forced by shorter construction times and the environment aspect. To pursue the development, further knowledge exchange should exist between the countries.

3D-modellering i AutoCAD -att skapa en digital huskonstruktion

3D-modelling in AutoCAD This thesis is done in cooperation with LB-Hus in Bromölla, and have aimed to establish a digital AutoCAD model of one of the company?s house types and to find out what opportunities there are to do visualisations in the form of images directly from the programme. Modeling has been carried out so that the very construction of the house is included. Interiors and installations, with the exception of the ventilation system, have been left out in the model. The model has been created with solid models after a comparative study made between solid models and surface models to find out which option in this case was the easiest to handle and took up the least space.

Solel till Akademiska sjukhuset : möjlig genererad effekt och solcellers estetiska konsekvenser

Today many buildings and it´s nearby surroundings are designed to achieve some kind of environmental goal.The issue concerning energy consumption is currently at focus and it is relevant that we start increase the share of renewable energy. Solar energy is an infinite resource and should therefore be considered when selecting an energy supplier. Uppsala University hospital is facing major restructuring when parts of the existing buildings will be refurbished and a large new building will be constructed. White Architects have developed a study concerning the new building and for some of the existing buildings on the hospital campus. Uppsala County requires tough energy measures and wants the new building to be classified as an eco-building in Whites following work. The classifications will involve high energy source requirements. This work has been conducted to see if solar power can be envisaged as a supplementary energy source for the University hospital and also to investigate the aesthetic impact of solar cells on the new building.

Konstruktion av kolfiberarmerad motorcykelram

The project description is to draw an extension or annex to the existing Nationalmuseum building from 1866.The annex is designed to complement Nationalmusems activities and contain internal and public functions. Artentering the building must not be crossed by public visitors. Art and staff must be able to seamlessly move betweenthe extension and the main building. The new building includes a public study room for scholars working withthe collection of art on paper, workshops, conservation studios, art spaces and warehouses. Additionally, theannex is designed to host a large number of office spaces.With the renovation of Nationalmuseum they intend to open up the today built in south atrium.

<- Föregående sida 10 Nästa sida ->