Sök:

Sökresultat:

147 Uppsatser om Assembly - Sida 6 av 10

Underlag för implementering av lean : För Atlas Copco Craelius AB

The Production Manager at Atlas Copco AB Craelius wants to adopt a lean approach to become more competitive. This thesis is an exploratory study of the subject and what it means for the business activity and its implementation process.The objective is to provide a basic understanding of lean to the company, and what this means for Atlas Copco AB Craelius. The report describes the industrial revolution in brief. This is because the company itself must understand where certain ways of looking at production management is derived from. Furthermore, it provides an understanding of Lean's origins.

Hjullyft

The graduation essay has been carried out in co-operation with Kalmar Industries in Lidhult, Sweden. The purpose of our essay was to develop a complete construction solution on a hoist that could lift a laying wheel, lift it up and then turn it 90 degrees. After that the wheel shall be placed in a special holder.The background of the essay is a record of reports of damage wheels when they been incorrect lifted with a forklift. The hoist shall be used together with the same forklifts that manage the wheels today. Together with our instructor at Kalmar Industries we developed a requirement specification and from that we got free hands.However this was not the main task from the beginning, then a simular hoist should be develop but used directly in the Assembly workshop without using a forklift.We started to find principle solutions that later was evaluated against the requirement specification.

Hugo Chávez Venezuela - en demokrati i praktiken eller bara på pappret?

AbstractIn this bachelor thesis I discuss and analyse the current situation of the Venezuelan democracy. By using a theoretical framework based on the theory of horizontal accountability, I focus on the interaction between different institutions and branches within the state of Venezuela. The analysis focuses on the strenghts and flaws of the newly accepted constitution, and to what extent the institutions of checks and balances remain true to the laws and the constitution of 1999. My conclusions are that in terms of vertical accountability, the Chávez-regime acknowledges a wide popular support for their governmental actions. In contrast, the incumbent administration shows almost no respect for horizontal accountability.

UTVECKLING AV BESLAGSSYSTEM FÖR SANDWICHPANEL : Ett designprojekt i samarbete med Paroc Panel System AB ®

En av Parocs produkter är sandwichpanel som är ett byggmaterial som kan variera i storlek och tjocklek och är funktionellt och smidigt. Uppdraget var att designa ett beslag för panelsystem som minst 50% av Paroc Panel Systems kunder skulle föredra framför de gamla, främst med avseende på estetiken, men även baserat på lätthet att montera och kostnad av beslaget. Projektet skedde i samverkan med företaget Paroc Panel System AB och ur förundersökningen framkom att utseende, monteringsmöjligheter, egenskaper såsom materials livslängd och hållfasthet och totalkostnad var viktiga krav som ställdes på produkten. Lösningsförslag med fokus på flera viktiga aspekter togs fram och kombinerades till olika koncept med hjälp av en så kallad morfologisk tabell. En konceptutvecklingsfas ingick där hållfasthetsberäkningar och materialval var avgörande.

Utvecklingsanalys av installationssystems montering vid industriellt träbyggande : Värme, vatten, ventilation, el och avlopp

The industrialized timber housing process is capable nowadays to build multi-storeyhouses since fairly new changes in the Swedish regulations where made after theadmission of the European Union in 1994.The industrialized process moves parts of the construction process into a highlyeffective factory where 3D-volumes of the building are prefabricated beforetransportation to the building site for assemble.The Assembly process is relatively effective compared to the completion of thebuilding service system and this is therefore the main focus in this thesis. This thesisattends problems with completion of the building service system, and thereforedemarcates from other aspects, such as technical and economic aspects, of thebuilding service system.The degree of completion of the flats differs from completion of the connectivepassages, for example hallways, in a way that suggests a need for further investigation.This thesis includes analysis of the possibilities to increase the prefabricatedconnective passages, to the extent of containing building service systems.An increase of the prefabrication of the building service system has a greatdevelopment potential, even though some restraining factors need to be solvedbefore implementation.This thesis was made in collaboration with two of Sweden?s leading companies on themarket of multi-storey industrialized timber housing, Moelven ByggModul AB andLindbäcks Bygg AB..

Förbättring av väggfäste för flatscreens

The project was carried out in cooperation with the department of product development IOS at IKEA. The work included improvements of a new existing product that Ikea soon will release on the market, Observatör, a wall bracket for flat screens. The product is supposed to fulfil the needs within this market for IKEA. However, since Ikea was not satisfied with it, our work was to carry out the improvements that were specified in the beginning of the project. Another task in the project was to develop a side-product that is supposed to be used together with Obeservatör for storage of DVD/decoders.The project included labour as problem definition to final technical drawings and a prototype.

Artikelbundna instruktioner : Layout och rutiner

This thesis is carried out on behalf of watermixer manufacturer Ostnor AB in Mora.The thesis deals with the area of Article Bound Instructions (ABI) at the company'sAssembly department, regarding the layout and management routines involved withthese instructions.In the current situation there are problems with no uniformity in the manner in whichthe ABI is written, then referred to both the civil structure, images and specificityrates in the text.Another problem is that operators do not make use of the ABI that are available inthe current situation, and that there are no clear procedures for who has theresponsibility to write, update and change these ABI.During this work has several people that were identified as key personnel of thethesis held in order to get a handle on how the current situation of the variousobjects of the work looks like, and to examine different desires about the future ofthese should look like from the different subjects perspectives been interviewed.During the work, a number of deficiencies, including that the current program that isused to write the ABI, Lotus Notes, do not possess near the prerequisites for being asimple program to deal with when writing the ABI, which is a condition since wishesare about to put the responsibility for the ABI generation to the departmentsoperators, since their main task is to assemble and do not bother with a program in acomputer.The result of this work has generated new layout and structure of the ABI, designedto be used continuously in the Assembly for evaluation, routines regardingresponsibility of the ABI for the Department of Production Engineering (PT),procedures for how the ABI should be written regarding amount of detaileddescriptions in the text and use of pictures.In addition, proposals for further work and improvements has been developed basedon experience during the work and presented at the end of the report..

Kvalitetssäkring för Scaniasmotorkomponenter : Jämförelse med andra företag

Quality assurance for Scania engine componentsScania engines have become one of the world?s most renowned corporations in themanufacturing of engines. This is mostly due to the quality and performance thatScania have shown. However, this does not stop Scania from trying to achieve moresuccess in the fields of development and research to assure the quality of theirengines.The purpose of this thesis is to show how Scania ensures the quality of the enginecomponents, both those who made externally and internally at Scania, also inclusivethe manufacturing and Assembly process.Three engine components were examined: D16 block engines, water pump andXP-Iinjectors. The study included the whole process from the step of supplying therow materials to the last step in production functional test.In this thesis an investigation of how other companies are working with qualityassurance was conducted.

Förskollärares tankar om förhållandet mellan verbal och icke-verbal kommunikation i förskolan : En studie om förskollärares uppfattningar om den icke-verbala kommunikationens betydelse för den pragmatiska delen av barns språkutveckling i samlingssituation

Detta examensarbete handlar om förskollärares tankar om verbal och icke-verbal kommunikation i samlingssituationer. Syftet med studien är att visa förskollärares upplevelser av förhållandet mellan verbal och icke-verbal kommunikation under samlingssituationer i relation till den pragmatiska aspekten av barns språkutveckling. Frågeställningarna som arbetet bygger på är: Hur ser förskollärares uppfattningar ut beträffande användandet av den icke- verbala kommunikationen i samlingssituationer på förskolan? Hur ser förskollärares uppfattningar ut beträffande användandet av verbal kommunikation i samlingssituationer på förskolan? Det empiriska materialet har samlats in genom intervjuer av verksamma förskollärare och utgör tillsammans med tidigare forskning samt relevant litteratur för ämnet grunden för resultatet och analysen. Analysen har sin utgångspunkt från Maurice Merleau-Ponty utifrån fenomenologin.

Effektiv partiformning : analys och tillämpning på Uppåkra Mekaniska AB

This paper is the result of a case study conducted at Uppåkra Mekaniska AB during the spring of 2006. The task that was presented by Uppåkra was to develop a basis for a decision for the planning activities at the company, so that in the future they can create lot-sizes which are based upon a total cost perspective. Total cost in regards to lot-sizing is defined as the sum of the administrative reordering costs and warehousing cost per stock keeping unit.To collect data a series of interviews and observations were conducted. This data was then used during the lot-sizing simulation and analysis. The 15 units that the simulation was conducted on were grouped into three item classes depending how many different machine setups they required during the production process.

Värmeåtervinning ur spillvatten. En utredning av möjligheterna med spillvattenvärmeväxlare.

This thesis is carried out on behalf of watermixer manufacturer Ostnor AB in Mora.The thesis deals with the area of Article Bound Instructions (ABI) at the company'sAssembly department, regarding the layout and management routines involved withthese instructions.In the current situation there are problems with no uniformity in the manner in whichthe ABI is written, then referred to both the civil structure, images and specificityrates in the text.Another problem is that operators do not make use of the ABI that are available inthe current situation, and that there are no clear procedures for who has theresponsibility to write, update and change these ABI.During this work has several people that were identified as key personnel of thethesis held in order to get a handle on how the current situation of the variousobjects of the work looks like, and to examine different desires about the future ofthese should look like from the different subjects perspectives been interviewed.During the work, a number of deficiencies, including that the current program that isused to write the ABI, Lotus Notes, do not possess near the prerequisites for being asimple program to deal with when writing the ABI, which is a condition since wishesare about to put the responsibility for the ABI generation to the departmentsoperators, since their main task is to assemble and do not bother with a program in acomputer.The result of this work has generated new layout and structure of the ABI, designedto be used continuously in the Assembly for evaluation, routines regardingresponsibility of the ABI for the Department of Production Engineering (PT),procedures for how the ABI should be written regarding amount of detaileddescriptions in the text and use of pictures.In addition, proposals for further work and improvements has been developed basedon experience during the work and presented at the end of the report..

Modellering och design av elmotor för mutterdragare

This thesis was carried out at Atlas Copco Tools and Assembly Systems. The purpose hasbeen to develop a design tool to be used for development of new electric motors for AtlasCopcos electric nutrunners. The focus of the thesis has been to increase productivity bydecreasing the power losses in an electric tool. The productivity is defined as themaximum number of tightenings a nutrunner can perform without becoming too hot.Before starting the development of this design tool an existing Matlab script, whichcalculates the losses in a slotless electric motor, has been studied and modified torepresent the real losses in a better way. The modification has been made by performingpractical studies of different losses and then adjusting existing parameters in the Matlabscript.Because design changes in one part of a mechatronic system can lead to a decrease inperformance of another part the choice of parameters that can be changed has been madeso that other parts of the system is affected as little as possible.A study of the existing tools efficiency during an entire tightening has been made toincrease the understanding of when and where the different losses appear and to comparethe modified Matlab script with the measured values.The design tool was formed so that it executes the Matlab script, that calculates thelosses, for a number of different design options and stores the alternative which producesthe least losses.

Automatiserad Konstruktion av Varmkanalsystem

The thesis has been carried out in cooperation with Master Flow AB, Västervik owned by the EWEBE Group. The company produces and sells hot runner systems that are tailor made for the customers.The problem that MasterFlow AB has encountered is in the construction of complex hot runner systems in SolidWorks. With several different lengths, fronts and endcaps that builds the nozzles of the hot runner systems, is affecting the problems for MasterFlow AB. The purpose of this work is to automate the design of hot runner systems so it does not overload the CAD-system SolidWorks.To gain an understanding of the problem, there have been several studies and observations at the company, where the focus has been on how the work is done with the design of hot runner systems. By using help from the corporate management, enough information has been collected to find a solution to these problems.The implementation of design automation has been based on a flowchart that was created.

Klicka hem din middag : En fallstudie om e-handelns värdeskapande för traditionella livsmedelsbutiker

The purpose of this study was to explore how interpersonal relationship can be affected by groing up in a New Religoius Movement such as Jehovah?s Withnesses and how it has affected them both in their youth and today. The aim was also to explore if there were people in the respondents' environment that was significant to them during their childhood and which support our respondents have received if they were in need of it.We have not found any previous research on children's social relationships within the Jehovah's Witnesses. We therefore believe that this study is of high relevance to both society and also for all the professionals who come into contact with these children. To discover a child in need, knowledge about how their social environment looks like is crucial.

Analys och förslag av layout av en verkstadsindustri.

Skillingaryds stålrörsindustri AB handles different kinds of steel pipes and got theirmarket mainly in the furniture industry and in department stores. At the momentthe company find themselves in a strong up going course. In a few years thecompany?s turnover has increased with over 10 million SEK. This has led to ademand for structure changes and reorganizing through the company.

<- Föregående sida 6 Nästa sida ->