Fallstudie av flytt och återuppbyggnadav en IT-utbildningsmiljö
This is a case study of the planning and building of a new IT education facility when thedepartment of Media Technologymoved its operation to Flemingsberg and the main campus, due tothe termination of Campus Haninge at Södertörn University, Stockholm, Sweden. The study isbased on a case study an on administrative material from the process such as emailscorrespondences, policy documents, contact reports etc. The material is analysed using qualitativecontent analysis and the different observations done are distilled into four recommendations,aimed at being able to contribute to a improved process in similar future situations, whereverneeded..
Leveranslogistik på byggarbetsplatsen
Problem: How do delivery logistics work in practice at the building site?
Where are the big problems? How to make building logistics more
effective? Do the site management and the haulers agree about
questions concerning both parties? What is possible to gain by
using better logistics? Is it possible to gain time with better
logistics and by that reducing the costs?
Purpose and aim: The purpose is to discover if there are any disagreements between
the site management and the haulers. If disagreements occur they
will be examined and probable measures based on the problems
will be suggested. Another intention is to bring key ratios
concerning time spent for deliveries forward. One aim is to update
a similar report made in 1972.
Bosnien en studie av OHR statsbyggande
This essay examines the international communitys intervention in Bosnia. The purpuse i to give the reader a deaper understanding of the problems appeared in re-building the bosnianstate. Office of the higher representive (OHR), was to become the koordinator of therecontruction of the institutions and governance. The theory used fore the examination isstate-building, whith an alingnment of state-building trough the international community.The second part of the essay examine the ideas of the High representive (HR) trough threedifferent dimensions. The idea-analysies search to present the core of ideas of OHR, nationalparties and the reconstuction of media.
Kundrelationsarbete i den industriella försäljningsprocessen
The purpose of this thesis was to examine how the build-up of customer relations can be characterized at the end of the industrial selling process and how companies engage their cross-functional selling teams into this relationship building effort. Through a case study of Omega, a multinational company engaged in the selling of products of an industrial character, it was revealed that the build-up and maintaining of the customer relationship is of acute importance, as it presents the company with a window of opportunities. Through its relationship with the customer the company can be able to sell other products, which are related to the original purchase made by the customer. For the company?s competitors the established relationship might also serve as a barrier when attempting to enter the market or increase market share.
Framtiden för gamla Habo ullspinneri
This report presents an investigation and a new design of Habo Ullspinneris old industrial premises. It is based on the owners visions and wishes, two questionnaires and also considering of the historical value.Habo Ullspinneri was founded in 1882 by Frans August Johansson and was moved to the location it has today, near Hökån in Habo, three years later. The electricity that the machines in the industry needed was extracted from the small river that is placed under the building. In 1960 there was a fire and the result became the end of the industrial activity that had taken place in the building.There is no steady activity in the building at the moment. It is nowadays temporarily used as an agriculture museum and as a store room.
Utvärdering av den bärande tegel- och betongstommen i en byggnad från år 1916
This Master thesis is about a postal- and telegraphic building in Eskilstuna, Sweden. The construction methods for the specific building and buildings in general from the same time are described. The purpose of the report is to describe the loads acting on the building and how it has been built and why it has been rebuilt during the years. After this, possibilities of reconstruction and adaptation for today?s demands can be evaluated.
Ekonomisk utvärdering av betonggjutformar
This report will try to evaluate the use of rented concrete casting moulds, which are used to build walls and system of joists. The evaluation is only examining the economical aspects.The cost of using concrete casting moulds is a big part of the total production expenses. Therefore it is important that the calculated price not exceeds the final costs of the casting moulds. The calculated price is the price used in the process of making an offer.The evaluation consists of a comparison of the calculated price and the final costs for three building projects. It also evaluates the exploitation of the concrete casting moulds for each project.The report is made by Sven Gynne and Anders Alexandersson at School of Engineering, Jonkoping University, in cooperation with PEAB Jonkoping.
Församlingshem, Bankeryd
This report presents a thesis project at the School of Engineering, Jo?nko?pingUniversity, where the task has been to develop a proposal for a parish communitycentre for the Swedish church?s parish community in Bankeryd.Background1 st of November in 2004 the parish in Bankeryd appointed a special commissionof inquiry called Framtidsgruppen (Future Group), to analyse the parishcommunity?s different activities during the past 5 years and analyse the futureactivities and needs for the upcoming 5-10 years. This analysis would underlie theneeds of building a new centre for the parish community.Implementation, results and conclusionThe main focal points which this report is concentrated on has been to develop abuilding that is well suited for the activities, well adjusted for disabled persons andthe building shall be appealing in an architectural point of view.Based on the information provided from the parish community, studies ofliterature, reference objects and discussions with the contact person at the parishcommunity and the instructor of this project, the programming has beendeveloped. The building?s programming has been the source for the continuedwork with floor plans and the building design..
Ombyggnation till passivhus
Energy issues are constantly increasing attention in today's society. People's impact on Earth isentered in more contexts. Many discussions are about how the entire social structure needs to bestreamlined in order to achieve sustainability. The residential and service sector accounts for 39 % oftoday's total energy consumption in Sweden and the increasing electricity prices have made buyersmore interested in energy issues.There are many buildings in need of refurbishment today, including all the apartments that werebuilt in the 1970s to reduce the housing shortage at the time. 650 000 apartments of one millionapartments were built during the so-called the one million program and is currently in need ofrefurbishment.
Litteraturstudie om möjligheterna att analysera och modifiera talsignaler
This bachelor thesis is a literature study of the possibility to analyze and modify speech signals and will act as a pilotstudy for future theses in speaker verification.The thesis deals with the voice anatomy and physiology, synthesizer history and the various methods available when thevoice is used as a biometric method.A search and evaluation of existing programs have been conducted to determine the relevance of the attacks on theparameters used for speaker verification.
Go Down Arts Centre : Nairobi, Kenya
The Go Down Arts Centre is a proposal for a new building to an existing organisation in Nairobi, Kenya. The proposal relates to the scale of the city by making a statement on a future urban path, and by welcoming the city in to the building. The proposal houses both activities affiliated to Go Down, such as studios and rehersal rooms, as well as opportunities for the visitor to meet and interact with the culture produced at Go Down, both in formal and informal settings. The building is closed to its surroundings, apart from a grand entrance towards the urban path. There, the city passes through the building to an inner courtyard, where the communication to all the rooms and activities takes place.
Nyutveckling av bakdörrar vid Sapa Building System AB
Sapa är en av de största tillverkarna i världen av aluminiumprofiler. Sapa Building System AB är ett dotterbolag till Sapa group och är en av de största leverantörerna i Europa på byggsystem. Några av deras produkter är bakdörrarna RD 3010 och RD 3020 för lastbilar, släp och trailers som från början var ämnade som sidodörrar. Som bakdörrar är de överdimensionerade då sidodörrar hade högre hållfasthetskrav. I dagens läge väger och kostar de mer än nödvändigt där av önskar Sapa Building System AB en nyutveckling av bakdörrarna.Målet är att omkonstruera bakdörrarna RD 3010 och RD 3020 så att de blir lättare, smidigare och billigare genom att konstruera en ny kantskoning till Sapa Building System AB:s befintliga aluminiumlämprofiler.Arbetet har resulterat i att ritningsunderlag för nya profiler har tagits fram där man valt att limma ihop dörrarnas delar istället för att nita.
Klimatskärmens funktion : En jämförande analys av projekterade nybyggnationer i Östra Salabacke, ur ett energi- samt fuktperspektiv
The design of the building envelope affects the energy consumption of a building. As the energy requirements for new buildings are becoming more demanding, the performance of the building envelope must be improved. Energy efficiency and durability are important attributes to consider.This report includes investigations of the building envelope, moisture and passive solar energy. It is based on the analysis of two different buildings with different designs. These buildings stand as reference for two of the companies who are working on a new, climate smart, residential area in Uppsala, Sweden.Studies and analyses on energy consumption and moisture transportation were made.
Företagsstudie om värmeöverföring : Beskrivning av värmeflöden hos en lagerbyggnad
The study took place at a food corporation in Växjö, Sweden. It describes a building that contains four tanks in which glucose syrup is stored. The purpose of the study was to calculate the amount of heat that leaves the building and the amount of heat that is supplied by the installed heating equipment. Before the calculations could be implemented, all the systems that supply the building with heat had to be examined. With a small amount of information from earlier studies, the work to gather all the data necessary for the calculations began.
Lufttäta byggnader
The viscosity of air buildings is a hot topic within the construction performers, which the industry feel they have too little knowledge about. This study is mainly aimed against air density in apartment buildings and airflow measurement. The study consists of a theoretical reference, educational visit, interviews and a survey conducted among construction workers at Magistratshagen in Linkoping.Earlier requirement in terms of air leakage through the climate screen was removed and today there are only energy requirement for a dwelling in Boverkets Building Regulations. The difference between a passive and a typical air tight construction is that the passive house have a maximum requirement of 0.3 l /s m2 of air leakage through the building climate screen. The requirement imposed on passive houses is to minimize the supply of power and energy for heating the building.Air tight constructions have heavy demands on the performance and accuracy of everyone involved with the project. The client must specify their requirements and also be prepared to pay for any additional costs. The architect and building planners have to design the building with regard to air tightness. Finally, the construction workers are required to do a careful work in order to get all the connections in the building air tight.The study suggests that an air tight building is a closed system where no forced ventilation exists. There are no reasons not to build too tight as long as there is a functioning ventilation. In this study the authors ask themselves how an air tight building changes over time. No theoretical information has been found on these changes, but the respondents assume that air density decreases with time. The deterioration is mainly assumed to be caused by construction materials changes over time. The study shows that construction workers knowledge of air tight construction is mixed, which they themselves admit in the survey..