Sök:

Sökresultat:

1771 Uppsatser om Air-water heat pump - Sida 5 av 119

Effektmätning i pump

The interest for power and energy measurement has greatly raised with todays increasing electricity prices and enviromental awareness. In the search for energy efficient solutions, the measurements are more complex due to increasing of non linear components. Harmonics and non sinusoidal voltages put high demands on sampling and filtering. Meanwhile, the price must be controlled so the customer still will find it interesting to invest in smaller plants. ITT W&WW asks for a robust, heat resistant power meter with compact dimensions to allow mounting inside the casing of a pump.

Ökad resurseffektivitet i kraftvärmesystem genom säsongslagring av värme

Increased resource efficiency in an energy system could result in large economic and environmental benefits. Tekniska verken i Linköping AB (Tekniska verken) is responsible for the district heating network in Linköping. Their vision is to create the world?s most resource efficient region. An important step towards this vision is more efficient usage of produced heat, something which could be achieved through integration of a seasonal heat storage in the energy system.

Värmeslag hos hund : Förebyggande åtgärder, djurägarråd och omvårdnad

The objective of the essay was to identify the nursing care required by a dog suffering from heat stroke and how to educate and advice the owners how to start treating their dog and prevent the condition from occurring in the first place. The essay is based on a literature study. Several databases were searched for scientific research to try find answers to the issues. Keywords concerning the subject were used and mixed in different combinations to sort out the suitable studies. The results of the study indicate that the dog should be cooled by the owner directly after detection. The most crucial issue is to reduce the body temperature as quickly as possible or the morbidity will worsen.

Energikartläggning av biogasanläggningen, Kungsängens gård

The purpose of this thesis was to make an energy survey and quantify energy flows of individual unit operations associated with the biogas production in Uppsala Vatten och Avfall AB:s biogas plant, located at Kungsängens gård. Moreover, large consumers of energy would be identified and analyzed. The objective of this energy survey was to obtain a detailed understanding of the energy use in the biogas production.The energy survey was divided into two parts: electricity and heat. Each part was treated separately and with somewhat different approach. To estimate the electricity usage during the projcet the rated power of each selected unit operation was noted and multplied with thenmeasured time of usage.

Energikartläggning vid biogasanläggningen, Kungsängens gård

The purpose of this thesis was to make an energy survey and quantify energy flows of individual unit operations associated with the biogas production in Uppsala Vatten och Avfall AB:s biogas plant, located at Kungsängens gård. Moreover, large consumers of energy would be identified and analyzed. The objective of this energy survey was to obtain a detailed understanding of the energy use in the biogas production. The energy survey was divided into two parts: electricity and heat. Each part was treated separately and with somewhat different approach. To estimate the electricity usage during the projcet the rated power of each selected unit operation was noted and multplied with the measured time of usage.

Enegiutredning Hotell Princess

This report will show the energy usage of Hotel Princess in Sandviken, Sweden. When the hotel changed owner an examination of the hotels heating, ventilation and sanitary systems were done. The report showed flaws in the ventilation system, and is why the new owner wanted a closer look at the energy use of the hotel. The original building was built in the 1930s and two major extensions have been built, one in the 1950s and the most recent in the 1980s. An assumption made is that the building parts were built to the restrictions during the time. Activities on the hotel include sleep over, conference, night club, massage and swimming in the hotels pool section.

Gynnar eller motverkar kommunerna kostnadseffektiv miljöstyrning : en studie av kommunala taxor och avgifter

Local charges may induce people to change their pattern of consumption by influencing investments and acts in certain directions. Some charges could for example give people incentives to use less natural resources. This study investigates four different local charges and whether they benefit an economical management with natural resources or not. This is carried out by investigating whether there is a polarity between local charges that may influence environmental actions or goods, and effective pollution control set to achieve certain nationally determined environmental goals. The study includes two economic perspectives and investigates on the one hand whether local charges counteract governmental subsidies and on the other hand whether the charges vary between the different municipalities since large differences may lead to cost inefficiency.

Produktutveckling av dryckespump

This work is a product development of a product which facilitates enduro drivers swallowing fluid while driving. My own experience of the problem and a custom survey gave me some frames and requirements of how such a product would look. To obtain the different concepts the method of brainstorming was used where I outlined the various proposals. The basic concept was that some kind of pump would build pressure in the liquid and when the user opens the nozzle the liquid will come out without the need to use the mouth to suck. The screening phase consisted of two steps.

Konceptstudie av Waste Heat Recovery System på Tunga Fordon

In today?s fast growing and closely connected society, a reliable and energy efficient transportation system is more than ever desirable. Nowadays the significant part of the transportation sector?s energy demand is supplied by fossil fuels.Improving energy efficiency in combustion engines will result in reduction of fuel consumption and CO2 emissions. A modern internal combustion engine has an efficiency of 30-45 %, where the most energy loss occurs as result of heat losses in the exhaust and cooling systems.

Solvärme för en skola i Lerum. Studier av olika systemalternativ.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Konvertering från luft till vätskekylning av elektronik

A Swedish electronics company wants to make the cooling of one of their electronic components more efficient. They propose that a retrofit liquid cooler is the way to achieve this goal. The current air cooling has high energy cost due to the high amount of power needed to power fans and heat exchangers. Using high volumes of air for cooling also leads to noise pollution. The conversion from air to liquid cooling would possibly make the operation of the electronics more cost efficient and less noisy.The purpose of this project is to theoretically evaluate different concepts of drawing the heat generated by the electronic component in to a fluid, using numerical calculations in Matlab and FEM simulations in ANSYS.

Kylapotentialen i Drefviken för Vattenfall Heat AB

Vattenfall Heat AB is a district heat provider in Drefviken, but has yet to establish any cooling systems in this area. This thesis examines the potential client base within the area today and over the coming 20 years. The feasibility of the most common cooling technologies is evaluated and results show a total potential for an installed capacity of 30 MW providing 50 GWh of cooling per year. One of the examined areas shows good prospect for heat driven absorption chillers during the summer months when the heat load is limited..

Brunnsviken : Utvärdering av åtgärder för förbättrad vattenkvalitet

Periods of hypoxia are a recurring issue in Brunnsviken. Main factors that trigger hypoxia in Brunnsviken are eutrophication  due to anthropogenic emission of nutrients, stratification in the water column due to salinity and temperature differences  that prevents mixing and a sill inlet that prevents water exchange. As an attempt to improve the oxygen levels, bottom water is pumped from Brunnsviken causing aerated surface water to flow back into the basin.  The objective of this Master?s thesis was to study the change in dissolved oxygen levels due to pumping.

Energieffektivisering av ventilationssystemet i konsthallen Sandgrund Lars Lerin

Uppsala County has ambitious environmental aims for the planned residential area inÖstra Sala backe. In this thesis different energy sources have been evaluated todetermine which system that would be most favorable given currently availableinformation about the project. Planned energy usage has been divided into tap waterheating, space heating and power. Three base case scenarios were made with districtheating, small scale bio fuel and heat pump. Solar power and solar heating were thensimulated and the production from the two could individually be deducted from theenergy need in the base cases, constituting 9 different scenarios.

Flexibel isolering av fönster för att minska energiförluster

The first part of this essay is about a single-family house that we have planned and projected. Thesecond part is a deeper study in ways to further insulate windows when they are not in use.In the first part the building?s design and its most important construction elements are described.The planning of all major installations (heating, domestic water, ventilation, sanitation, electricity)are reported so that one can in principle start construction of the house. In addition there arecalculations done on the building?s energy management.The result is a two stored house angled toward the south.

<- Föregående sida 5 Nästa sida ->